_ - - - _ _ - _ _ - _ _ _ - - - - - - _ _ _ -
d O
sanon um.an Pilgrim Nuclear Power Station Gl.88-01 Rocky Hill Road Plymouth, Massachusetts 02360-5599 Nancy L Desmond Regulatory Relations Group Manager January 28, 1998 BECo Ltr. # 2.98.011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-293 License No. DPR-35 REVISED RESPONSE TO GENERIC LETTER 88-01:
NRC POSITION ON IGSCC IN BWR AUSTENITIC STAINLESS STEEL PIPING
References:
(1) NUREG-0313, " Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping", Rev. 2, published date January 1988.
(2) Boston Edison Company Letter No. 2.88.119, " Response to Generic Letter 88-01: NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping", dated August 4,1988.
Generic Letter (GL) 88-01 transmitted NRC staff positions relative to intergranular stress corrosion cracking (IGSCC) near weldments in Boiling Water Reactor (BWR) piping. GL88-01 required licensees to assess the staff positions for conformance or propose alternative measures, and supply information relating to piping replacements, inspections, repair, and leakage.
Our assessment and conformance relative to the guidance of NUREG-0313 (Reference 1) and a listing of the IGSCC susceptible welds remaining in Pilgrim Station were provided by attachments A and B to Reference 2, respectively.
Core spray nozzle weld leakage at the Hope Creek Station in September 1997, prompted us to assess past inspections of Pilgrim core spray nozzle weldments.
During this assessment, we discovered that six core spray nozzle welds (14-A-1,14-B-1,14-A-3,14-B-3,14-A-10A and 14-B-10A) were classified incorrectly as IGSCC Category "A" welds instead of "D" in our IGSCC inspection program and GL88-01 response (attachment B to Ref. 2). Category D welds require 100% examination over a period of two refueling outages, whereas, Category A welds require 25% inspection over ten years. The records show these six welds did not receive GL88-01 Category D required inspections.
k'.; O U d 2 l
il,li, loI L,ll ll!
Mr d
9802040006 9eotaa pV t
ApocKosooo2y3 oa
Page 2/2, Boston Edison Company.
'An operability evaluation was performed to determine the impact of not conducting the required Category D inspections within the specified intervals. The evaluation showed no operability concem. The basis for the operability is that these welds were inspected several times in the past with no rejectable indications and Pilgrim has implemented leakage monitoring capabilities in response to GL88-01 to detect coolant leakage (Technical Specification 3/4.6.C.) employing the leak before-break criteria.
We have updated our IGSCC inspection program to irsclude correct classification of welds and enclosed our current list of IGSCC-susceptible welds. This list includes changes made in the IGSCC inspection scope due to plant modifications and inspections in accordance with GL88-01. The future inspections of the revised Category D welds will follow the GL88-01 and ASME code in-service inspection program requirements.
If you have any questions regarding the information contained in this letter, please contact Walter Lobo at (508)830-7940.
N. L. Desmond WGU298011
Enclosure:
Pilgrim Nuclear Power Station IGSCC-Susceptible Weld Inspection Schedule in Accordance with Generic letter 88-01 Mr. Alan B. Wang, Project Manager Project Directorate 1-3 Office Of Nuclear Reactor Regulation Mail Stop: OWFN 1482 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region i 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station j
l muumi ENCLOSURE TO BECO LETTER NO. 2.98.010 Pilgrim Nuclear Power Station IGSCC-Susceptible Weld Inspection Schedule In Accordance with Generic Letter 88-01
N 9s -
Pilgrim N;cle:r P wcr Stction IGSCC-S sceptible Weld Ir_spection Sched:le PNPS ISI Gom
- In Accord'nce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RF08 RFO9 RF010 RF011 RFO12 Notes 1GSCC A CS 14-A-2 10IN.
REDUCER TO SAFE END IGSCC A CS 14-B-2 10 IN.
REDUCER TO SAFE END IGSCC A CS 14R-A-11 10IN.
PIPE TO VALVE IGSCC A CS I4R-A-11A 10IN.
PIPE TO PIPE IGSCC A CS 14R-A-12 IOIN.
ELBOW TO PIPE IGSCC A CS 14R-A-13 10IN.
VALVE TO ELBOW s
PIPE TO VALVE IGSCC A CS 14R-A-15 10lN.
ELBOW TO PIPE IGSCC A CS 14R-B-11 10 IN.
PIPE TO VALVE IGSCC A CS 14 R-B-12 10IN.
FLBOW TO PIPE l
VALVE TO ELBOW 8
PIPE TO VALVE IGSCC A CS 14 R-B-15 10IN.
ELBOW TO PIPE Page 1 of 18
m es Pilgrim N clecr Power St tion IGSCC-S:sceptible Weld Inspection Sct edde PNPS 153 Gmup.
In Accord =ce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RFO8 RFO9 RF010 RFO11 RF011 Notes IGSCC A CS 14R-B-21 10 IN.
VALVE TO PIPE IGSCC A RECIRC 2R-BP-I A 4 IN.
BR CONN TO P!PE IGSCC A RECIRC 2R-BPA-1 4 IN.
BR CONN TO PIPE IG IGSCC A RECIRC 2R-ilA-1 22 IN.
IIEADER TO BEND IGSCC A RECIRC 2R *lA-2 22 IN.
CROSS TO IfEADER IGSCC A RECIRC 2R-ilA-3 22 IN.
CROSS TOIfEADER 9
IGSCC A RECIRC 2R ilA4 22 IN.
IIEADER TO BEND IGSCC A RECIRC 2R-IIB-1 22IN.
IIEADER TO BEND IGSCC A RECIRC 2R-ilB-2 22 IN.
CROSS TO IfEADER IGSCC A RECIRC 2R-ifB-3 22 IN.
CROSS TO IIEADER IGSCC A RECIRC 2 R-ilB-4 22IN.
IIEADER TO BEND IGSCC A RECIRC 2R-NI A-1 28IN.
NOZZLE TO SAFE END 7-defer 12 IGSCC A RECIRC 2R-NI A-10 28tN.
PIPETO VALVE 7
12 Page 2 of 18 a f g,g
m9a -
Pilgiim NIclear P:w r St: tion IGSCC-S3ceptible Weld Inspection Sched:le PNPS ISI Gmup -
In Accordance With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RF07 FLAW RF08 RFO9 RFO10 RFO11 RF012 Notes 1GSCC A RECIRC 2R-Ni A-11 28IN.
VALVE TO ELBOW IGSCC A RECIRC 2R-Ni A-12 28IN.
ELBOW TO PfPE 10 IGSCC A RECIRC 2R-NI A-13
' 28IN.
PIPE TO TEE IGSCC A RECIRC 2R-NI A-14 28IN.
TEE TO PIPE 8
IGSCC A RECIRC 2R-N1 A 15 28 IN.
PIPE TO CROSS IGSCC A RECIRC 2R-NI A-2 28IN.
PIPE TO SAFE END IGSCC A RECIRC 2R NIA 3 28IN.
ELBOW TO PIPE IGSCC A REC 1RC 2R-N1 A-4 28IN.
P!PE TO PIPE IGSCC A RECIRC 2 R-NI A-5 28IN.
PIPE TO ELBOW IGSCC A RECIRC 2R-NI A-6 28IN.
ELBOW TO VALVE IGSCC A RECIRC 2R-NI A-7 28IN.
VALVE TO ELBOW IGSCC A RECIRC 2R-Ni A-7BC-1 4IN.
BR CONN TO ELBOW 1
f 12 IGSCC A RECIRC 2R-NI A-8 28IN.
ELBOW TO PtStP l
l P,ge 3 of 18
2 N a+9s.'
Pilgrim Nrclear Power St: tion IGSCC-Susceptible Weld Inspection Sched:le PNPS ISI Gmup Im Accordrce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RF08 RFO9 RF010 RFO11 RFOI:
Notes IGSCC A RECIRC 2R NI A-9 281N.
PCM 7D PIPE 7
12,
defer 12 IGSCC A RECIRC 2 R-NIB-10 28 IN.
ELBOW TO PUMP defer 12 IGSCC A RECIRC 2R-NIB-ll 28IN.
' PUMP TO PIPE IGSCC A RECIRC 2R-NIB-12 28 fN.
PIPE TO VALVE IGSCC A RECIRC 2R-N1B-13 28IN.
VALVE TO ELDOW IGSCC A RECIRC 2R-N1B-14 28 IN.
ELBOW TO PIPE 10 IGSCC A RECIRC 2R-NIB-15 21 M PIPE TO TEECROSS IGSCC A RECIRC 2R-N1B-2 28IN.
SAFE END TO ELBOW IGSCC A RECIRC 2R-NIB-3 28tN.
ELBOW TO PIPE 8
IGSCC A RECIRC 2R-NIB-4 28 IN.
PIPE TO TEE l
TEE TO PIPE IGSCC A RECIRC 2R-N1B4 28fN.
PIPE TO PIPE
!GSCC A RECIRC 2R-N! B-7 28 IN.
PIPE TO ELBOW Page 4 of 18 c
m 9s
In Accordance With Generic Letter 88-01 Category System We!d Number Diameter Configuration.
RFO6 RFO7 FLAW RF08 RFO9 RFO10 RF011 RF012 Notes l
IGSCC A RECIRC 2 R-N1 B-8 28IN.
ELBOW TO VALVE 7
IGSCC A RECIRC 2 R-NI B-9 281N-VALVE TO ELBOW 7
l deU 12 IGSCC A REC 1RC 2 R-N1 B-9BC-1 4 IN.
BR CONN TO ELBOW IGSCC A RECIRC 2R-N2A-2 12IN.
PIPE TO SAFE END IGSCC A RECIRC 2R-N2A-3 12IN.
COMPOUND BEND TO PIPE 9
PIPE TO SAFE END 10 IGSCC A RECIRC 2R-N2B-3 12 IN.
ItEADER TO P!PE IGSCC A REC 1RC 2R-N2C-2 12IN.
PIPE TO SAFE END IGSCC A RECIRC 2R-N2C-3 12 IN.
CROSS TO PIPE 8
IGSCC A RECIRC 2R-N2D-2 12 IN.
PIPE TO SAFE END 10 IGSCC A RECIRC 2 R-N2D-3 12IN.
I(EAvER TO PIPE 9
IGSCC A RECIRC 2R-N2E-2 12 IN.
PIPE TO SAFE END IGSCC A RECIRC 2 R-N2E-3 12 IN.
COMPOUND BEND TO P!PE Page 5of 18
=
N98 -
Pilgrim Ncclear P;wer St-tion IGSCC-Saceptible Weld Inspection Sched le PNPS ISA Group '.
12 Accordxce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RFO8 RFOS RF010 RF011 RF012 Notes IGSCC A RECIRC 2R-N2F-2 12 IN.
PIPE TO SAFE END IGSCC A RECIRC 2R-N2F-3 12 IN.
COMPOUND BEND TO PIPE IGSCC A RECIRC 2R-N2G-2 12 IN.
PIPE TO SAFE END IGSCC A REC!RC 2R-N2G-3 12 IN.
IfEADER TO PIPE IGSCC A RECIRC 2R-N21f-2 12 IN.
PIPE TO SAFE END 8
IGSCC A RECIRC 2R-N211-3 12IN.
CROSS TO PIPE IGSCC A RECIRC 2R-N21-2 12 IN.
PIPE TO SAFE END IGSCC A RECIRC 2R-N23-3 12 IN.
IIEADER TO PIPE IGSCC A RECIRC 2R-N2K-2 12 IN.
PIPE TO SAFE END IGSCC A RECIRC 2R-N2K-3 12 IN.
COMPOUND DEND TO PfPE 10 IGSCC A RilR 10R-IA-1 18 IN.
PIPE TO TEE IGSCC A RllR 10R-IA-10 IS IN.
PIPE TO ELBOW IGSCC A RilR 10R-IA-Il 18IN.
ELBOW TO PIPE Page 6 of 18
N 98 ~
Pilgrim Noclear Power Stction IGSCC-Susceptibie Weld Inspection Schedule PNPS ISI Grcup In Accordance With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RFOS RFO9 RF010 RFOII RF012 Notes IGSCC A RIIR 10R-IA-I A 18IN.
PIPE TO PIPE -
l 10 IGSCC A RilR 10R-IA-2 18IN ELBOW TO PIPE 10 IGSCC A RifR 10R-IA-3 i 181N.
PIPE TO ELBOW IGSCC A R11R 10R-IA-4 18IN.
ELBOW TO PIPE IGSCC A RitR 10R-IA-5 18IN.
VALVE TO ELBOW 8
10 IGSCC A R.IIR IOR-1A-6 18IN.
PIPE TO VALVE 10 IGSCC A RIIR 10R-IA-7 18 IN.
VALVE TO PIPE 10 IGSCC A RilR 10R-IA-8 18 IN.
PIPETO VALVE IGSCC A RiiR 10R-IA-9 18IN.
ELBOW TO PIPE to IGSCC A RIIR 10R-IB-l 18 IN.
PIPE TO TEE l
lGSCC A RilR 10R-IB-10 18 IN.
PffE TO ELBOW IGSCC A RilR 10R-1B-11 18IN.
ELBOW TO PIPE l
PIPETO FLUED IIEAD 7
12 l
l Page 7 of 18
WM-Pilgrim Nuclear Power Station IGSCC-Snsceptible Weld Inspection Schedule PNPS ISI Gm@,
le Accordance With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RFOS RF09 RFO19 RF011 RF012 Notes IGSCC A RilR 10R-IB-15 18 IN.
ELBOW TO PIPE I
I IGSCC A RiiR 10R-1B-16R I8 IN.
VALVE TO ELBOW 10 IGSCC A RJIR 10R-1B-2 18 IN.
ELBOW TO PIPE 10 IGSCC A RIIR 10R-IB-3 18 IN.
PIPE TO ELBOW IGSCC A RilR 10R-IB-4 I8 IN.
ELBOW TO PIPE IGSCC A RIIR 3R-IB-5 18 IN.
VAIXE TO ELBOW 7
12 9
PIPETO VALVE 9
VALVE TO PIPE l
\\
9 IGSCC A RIIR 10R-1B-8 18 IN.
PIPE TO VALVE 9
ELBOW TO PIPE 9
TEETO 45 ELBOW IGSCC A RifR 10R et0 20IN.
PIPE TO PIPE IGSCC A RilR IORoll 20 lN.
PIPE TO ELBOW Page 8 of 18
2 h 96*
Pilgrim Nrclear Power St; tion IGSCC-Susceptible Weld Inspection Sched;1e PNPS ISI Cm -
In Accordance With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RF08 RFO9 RF010 RF011 RF012 Notes defer 12 IGSCC A R11R 10R ol2 20IN.
EGOW TO VALVE 9
IGST A RifR 10R ol3 20IN.
VALVE TO PIPE IGSCC A R11R 10R ol4 20lN.
PIPETO PIPE 8
IGSCC A R11R.
10Ro2 20IN.
45 ELBOW TO P!PE IGSCC A RIIR 10Ro3 20IN.
PIPE TO EBOW IGSCC A RllR 10R44 20 IN.
EGOW TO PIPE IGSCC A RIIR 10R O S 20IN.
PfPE TO 45 ELBOW defer 12 IGSCC A R11R 10R o 4 20 IN.
45 ELBOW TO PIPE IGSCC A RilR 10R o7 20IN.
PIPE TO VALVE 7
defer 12 IGSCC A R11R 10R 48 20 lN.
VALVE TO EGOW 7
defer 12 defer 12 IGSCC A R11R 10R &9
REDUCER TO PIPE 7
8 10.REPL IGSCC A RWCU 121-17R 4 IN.
P!PE TO REDUCER 6
8 10.REFL Page 9of 18
. = _ _.... _. _ _.. _ _
h88
12 AccordJnce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RFO8 RF09 RF010 RF011 RFO12 Notes IGSCC A RWCU 12-I-lBR 4 [N.
EGOW TO PIPE 6
REPL IGSCC A RWCU 12-1-19R 4 IN.
PIPE TO EBOW 6
8 10,REPL REPL IGSCC A RWCU 12-I-20R 4 IN.
ELBOW TO PIPE IGSCC A RWCU I2-i-21 R 4 IN.
PIPE TO ELBOW 6
8 10,REPL REPL IGSCC A RWU 12-1-22R 4 IN.
ELBOW TO PIPE IGSCC A RWCU 12-I-23R 4 IN.
PIPE TO ELBOW 6
8 10 REPL IGSCC A RWCU 12-I-24R 4 IN.
ELDOW TO PIPE t,
8 10.REPL IGSCC A RWCU 12-1-25AR 4 IN.
PIPE TO PIPE 6
3 10,REPL IGSCC A RWCU 12-I-25R 4 IN.
PIPE TO ELBOW 6
8 10.REPL IISW IGSCC A RWCU 12-1-27A 4 IN.
PIPE TO PIPE IGSCC A RWCU 12-I-23R 4 IN.
ELDOW TO PIPE 6
8 REPL IGSCC A RWCU 12-I-29R 4 IN.
PIPE TO ELBOW 6
8 REPL 1
ELBOW TO PIPE 6
7 8
REPL Page 10 of 18
m ee '
Pilgrim NCelear Power Stction IGSCC-Susceptible Weld Inspection Schedde PNPS ISI Group -
In Accordance With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RF08 RFO9 RFO10 RF011 RF012 Notes IGSCC A RWCU I2-1-31 R 4 IN.
PIPE TO ELBOW 6
7 8
REPL I
ELBOW TO PIPE 6
8 REPL IGSCC A RWCU 121-33R 4 IN.
PIPE TO ELBOW 6
8 REPL IGSCC A RWCU 12-I-34R 4 IN.
ELBOW TO PIPE 6
7 8
REPL IGSCC A RWCU 12-1-35R 4 IN.
PIPE"IU ELBOW 6
7 8
REPL IGSC(
RWCU 12-0-26R 6IN.
PIPE TO BENie 6
REPL IGSCC A RWCU 12-0-27R 6IN.
BEND TO PIPE 6
REPL IGSCC A RWCU 12-O-2SR 6IN.
PIPE TO ELBOW 6
YES R.REPL IGSCC A RWCU I2-0-29R 6IN.
ELBOW TO P!PE 6
7 REPL 11 IGSCC A RWCU 12-O-30R 6 IN.
PIPE TO ELBOW 6
7 REPL 11 IGSCC A RWCU 12-0-31 A 6 IN.
PIPE TO PIPE NEW IGSCC A RWCU 12-0-31R 6 IN.
ELBOW TO PIPE 6
7 REPL 11 IGSCC A RWCU 12 R-I-36R 4IN.
VALVE TO PIPE 6
7 8
REPL Page 11 of 18
_ =
I m 9s 1 Pilgrim N: clear Power St: tion IGSCC-Susceptible Weld Inspection Sched:le PNPS ISt Group,
In Accord:nce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RF06 RFO7 FLAW RFOS RF09 RF010 RF011 RF012 Notes 12 IGSCC A RWCU 12R ol 6IN.
PIPE TO SWEEP-O-LET REPL IG';CC A RWCU 12Rol0R 6 IN.
PIPE TO VALVE 9
REPL IGSCC A RWCU 12R olIR 6IN.
VALVE TO PIPE IGSCC A RWCU 12R-O-12 6IN.
PIPE TO ELBOW IGSCC A RWCU 12 R-O-13 6 IN.
ELBOW TO P!PE IGSCC A RWCU 12Ro14 6 IN.
PIPE TO 45 ELBOW IGSCC A RWCU 12RO15 6 IN.
45 ELDOW TO PIPE IGSCCA RWCU 12R-O-16 6 IN.
PIPE TO ELBOW IGSCC A RWCU 12Ro17 6 fN.
ELBOW TO PIPE l
PIPE TO ELBOW IGSCC A RWCU 12RG19 6IN.
ELBOW TO PIF'E IGSCC A RWCU 17Rol9A 6 IN PIPE TO ELBOW IGSCC A RWCU 12R-O-1 A 6 IN.
SWEEPOLET TO ELBOW 8
Page 12 of 18
m 9s.
Pilgrim Nuclear Power Stntion ICSCC-S sceptible Weld I;;spection Sched:le PNPS ISI Group
- In Accord; ice With Generic Letter 88-01
=
Category
. System Weld r,- amber Dismeter Configuration RFO6 RFO7 FLAW RF08 RFO9 RF010 RF011 RFO12 Notes IGSCC A RWCU 12R-O-2 6 IN.
45 EGOW TO P:PE IGSCC A RWCU 12R&20 6 IN.
ELBOW TO PfPE IGSCC A RWCU 12R421 6 IN.
PIPE TO ELBOW IGSCC A RWCU 12Ro22 6 IN.
EGOW TO PIPE 9
PIPE TO ELBOW IGSCC A RWCU I2R-O-3 6 IN.
P!PE TO 45 ELBOW IGSCC A RWCU 12R4)-32RI 6 fN.
PIPE TO VALVE 6
8 REPL IGSCC A RWCU 12R-O-4 6 IN.
45 ELBOW TO PfPE IGSCC A RWCU 12R4)-5 6 IN.
PIPE TO VALVE IGSCC A RWCU 12R-O-6 6 IN.
VALVE TO EGOW IGSCC A RWCU 12R-O-7 6.V ELBOW TO PIPE l
PIPE TO EGOW 1GSCC A RWCU 12R&9 6IN.
EGOW TO PIPE Page 13 of 18
N' Pilgrim N clear Power St-tioa IGSCC-Sasceptible Weld Inspection Sched:le PNPS LSI Group la Accord =ce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7. FLAW RF08 RFO9 RF010 RF011 RF012 Notes IGSCC C RWCU 12-O-24 6 IN.
PENETRATION TO PIPE 6
REPL 10 IGSCC D CS I4-A-1 12IN.
SAFE END TO NOZZLE 6
7 11 12 11 12 IGSCC D CS 14-A-10A 10IN.
VALVE TO PIPE 6
PIPE TO PENETRATION '
6 9
PIPE TO PIPE 6
VALVE TO PIPE t
8 10 12 12 IGSCC D t
14-A-3 10!N.
REDUCER TO PIPE 6
SAFE END TO NOZZLE 6
8 12 12 IGSCC D CS 14-B-10A 10IN.
VALVE 47 PIPE 6
PIPE TO PENETRATION 6
7 9
11
)
ELBOW TO PIPE 6
7 9
PIPE TO ELBOW 6
7 9
11 Page 14 of 18
4 N~
Pilgrim Nrclear P wer St tion IGSCC-Susceptible Weld Inspection Sched:le PNPS ISI Ccw -
In Accordance With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RF07 FLAW RFO8 RF09 RF010 RF011 RF012 Notes IGSCC D CS I4-B-20 10fN.
PIPE TO PIPE 6
7 9
REDtJCER TO PIPE 6
PENETRATION TO ELBOW 8
10 12 IGSCC D CS 14R-B-16 10 IN.'
PENETRATION TO ELBOW 8
10 12 8
10 12 IGSCC D CS 14R-B-21 A 10lN.
PIPE TO PIPE 8
10 12 IGSCC D CS DB/DC-14-3001 4 10 lN.
PIPE TO PIPE 8
10 12 IGSCC D CS DIUDC-14-3002-5 10 IN.
ELi1OW TO PIPE 8
10 12 IGSCC D CS DC-14-F1 10IN-PfPE TO VALVE 8
10 12 IGSCC D CS DC-14-F31 10IN.
PIPE TO VALVE l
8 10 12 IGSCC D RECIRC 2R-N1 B-1 28 IN.
NOZZLE TO SAFE END IGSCC D RECIRC 2R-N2A-1 12IN.
SAFE END TO NOZILE 7
9 defer 12 IGSCC L RECIRC 2R-N28-1 12 IN.
SAFE END TO NOZZLE 7
9 defer 12 8
10 12 IGSCC D RECIRC 2R-N2C-1 12 IN.
SAFE END TO NOZZ.E Page 15 of 18
N 2 m es Pilgrim Nuclear P wer St; tion IGSCC-S sceptible Weld Inspection Schedule PNPS S Group,
la Accord;rce With Generic Letter 88-01 Category System Weld Number Disneter Configuration RF06 RF07 FLAW RF08 RFO9 RF010 RFOII RFO12 Notes
!GSCC D RECIRC 2R-N2D-1 12IN.
SAFE END TO NOZZLE 8
10 12,
IGSCC D RECIRC 2R-N2E-l 12 IN.
SAFE END TO NO22LE 8
10 12 IGSCC D RECIRC 2R-N2F-1 12 IN.
SAFE END TO NOZZLE 8
10 12 IGSCC D RECIRC 2R-N2G-1 12IN.
SAFE END TO NOZZLE 9
11 IGSCC D RECIRC 2R-N211-1 12 IN.
SAFE END TO NOZZII 9
11 IGSCC D RECIRC 2R-N21-1 12IN.
SAFE END TO NOZZLE 8
10 12 IGSCC D RECIRC 2R-N2K-1 12 IN SAFE END TO NOZZLE 9
11 IGSCC D RllR 10-1A-14 18 IN.
PIPE TO FLUED !!EAD 8
10 12 IGSCC D RilR 10-IA-15 18 IN.
VALVE TO PIPE 8
10 12 IGSCC D RJIR 10R-IA-12 18IN.
PENETRATION TO ELBOW 8
10 12 l
l IGSCC D RllR 10R-1B-12 18IN.
PENETRATION TO ElDOW 7
9 11 IGSCC D allR DII/DC-l?-3001-2 18 IN.
ELBOW TO P!PE 8
10 12 l
I IGSCC D Rl!R DB/DC-10-3002-3 18 IN.
PIPE TO PIPE 8
10 12 Page 16 of 18
um mes '
Pilgrim N clear Power St: tion IGSCC-Susceptible Weld Inspection Sched:le.
Im Accordance With Generic Letter 88-01 Category System Weld Number. Diameter Configuration RFO6 RFO7 FLAW RF08 RFO9 RFO10 RF011 RF012 Notes 8
10 12.
IGSCC D RIIR DC-lO ? 10R 18IN.
PfPE TO VALVE 8
10 12 IGSCC D RilR DC-10-F9 18IN.
PIPE TO VALVE 8
10 12 IGSCC D RPV 3 1 6IN NOZZLE TO CAP IGSCC D RPV RPV-N9B-1 4 IN.
NOZZLE TO SAFE END 6
7 9
ELBOW TO PIPE 6
8 10 12 IGSCC D RWCU 12-I-27 4IN.
PIPE TO ELBOW 6
8 10 12 8
to 12 IGSCC D RWC11 12R-O-23 6 IN.
ELBOW TO PENETRATION IGSCC E RPV RPV-N9A-l 4 IN.
NOZZLE TO SAFE END 6
7 YES 8
10 12 IGSCC G CS 14-A-16A 10!N.
PENETRATION TO FLUED flEAD IGSCC G CS I4-B-16A 10 IN.
PENETRATlON TO FLUED IIEAD IGSCC G R!!R 10-1A-13A IB IN.
PENETRATION TO FLUED ffEAD IGSCC G RilR 10-IB-13A 18 IN.
PENETRATION TO FLUED IIEAD Page 17 of 18
m es Pilgrim N clecr P:wer Ststion IGSCC-S sceptible Weld Inspection Sched;1e PNPS ISI Gmup In Accordrce With Generic Letter 88-01 Category System Weld Number Diameter Configuration RFO6 RFO7 FLAW RF08 RFO9 RF010 RFO11 RF012 Notes 1GSCCG RWCU 12-O 23A 6 IN.
PENETRATION TO FLUED IIEAD i
Page 18 of 18
..