Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F456 + (12:45:53, 10 December 2024)
- ML20199F453 + (12:45:55, 10 December 2024)
- ML20199F455 + (12:45:55, 10 December 2024)
- ML20199F451 + (12:45:56, 10 December 2024)
- ML20199F452 + (12:45:56, 10 December 2024)
- 3F0198-41, Forwards Vols 1-4,Rev 24 to FSAR for Crystal River Unit 3. Rev Provided as Complete Reissue of FSAR & Pages Marked as Rev 24,dtd 980126.Summary of Changes Made in Fsar,Rev 24 Provided in Attachment A.Rept Will Be Provided by 980213 + (12:46:15, 10 December 2024)
- IR 05000354/1986026 + (12:46:15, 10 December 2024)
- W3P86-2153, Advises That No Generic Tech Spec Will Be Developed for Auxiliary Pressurizer Spray.No Safety Significance Exists & Spray Does Not Meet NRC Criteria for Sys Required for Inclusion in Tech Specs + (12:46:16, 10 December 2024)
- IR 05000285/1985029 + (12:46:42, 10 December 2024)
- ML20199F444 + (12:46:43, 10 December 2024)
- ML20199F442 + (12:46:43, 10 December 2024)
- ML20199F441 + (12:46:44, 10 December 2024)
- ML20199F440 + (12:46:45, 10 December 2024)
- ML20199F439 + (12:46:45, 10 December 2024)
- ML20199F437 + (12:46:46, 10 December 2024)
- ML20199F435 + (12:46:46, 10 December 2024)
- ML20199F434 + (12:46:47, 10 December 2024)
- ML20199F432 + (12:46:48, 10 December 2024)
- ML20199F433 + (12:46:48, 10 December 2024)
- ML20199F431 + (12:46:49, 10 December 2024)
- ML20199F429 + (12:46:50, 10 December 2024)
- ML20199F426 + (12:46:51, 10 December 2024)
- ML20199F421 + (12:46:55, 10 December 2024)
- ML20199F423 + (12:46:55, 10 December 2024)
- ML20199F420 + (12:46:56, 10 December 2024)
- 05000412/LER-1997-011-02, On 971229,determined That Inadequate Electrical Isolation in Secondary Process Rack Circuitry Occurred Due to Design Error.Technical Evaluation Rept 1162 Was Developed + (12:46:58, 10 December 2024)
- ML20199F416 + (12:46:59, 10 December 2024)
- ML20199F417 + (12:46:59, 10 December 2024)
- U-600611, Forwards Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept,Per 10CFR50,App J.Schematic Arrangement of Leakage Rate Measurement Sys Included in Rept + (12:47:00, 10 December 2024)
- ML20199F414 + (12:47:01, 10 December 2024)
- ML20199F413 + (12:47:01, 10 December 2024)
- AECM-86-0191, Forwards Addl Info Re Assumptions Used to Evaluate Need for Remotely Operated Isolation Valves on Certain Instrument Lines,Per 860612 Telcon.Valves Unnecessary to Meet Applicable Safety Requirements + (12:47:02, 10 December 2024)
- ML20199F411 + (12:47:03, 10 December 2024)
- ML20199F410 + (12:47:03, 10 December 2024)
- ML20199F408 + (12:47:04, 10 December 2024)
- ML20199F406 + (12:47:05, 10 December 2024)
- ML20199F405 + (12:47:05, 10 December 2024)
- ML20199F404 + (12:47:06, 10 December 2024)
- ML20199F402 + (12:47:07, 10 December 2024)
- ML20199F403 + (12:47:07, 10 December 2024)
- ML20199F400 + (12:47:09, 10 December 2024)
- ML20199F401 + (12:47:09, 10 December 2024)
- NSD-NRC-98-5544, Forwards W Responses to Open Item Oits 5321/Q260.93 Re AP600 SSAR Chapter 14, Initial Test Program, Per 980107 Request + (12:47:10, 10 December 2024)
- IR 05000312/1986012 + (12:47:16, 10 December 2024)
- ML20199F395 + (12:47:17, 10 December 2024)
- HL-5562, Requests That Response to RAI Re Incorporation of SQUG GIP Into Plant FSARs Be Extended to 980430 Due to Resolution Activities Between NRC & SQUG + (12:47:18, 10 December 2024)
- ML20199F393 + (12:47:18, 10 December 2024)
- ML20199F388 + (12:47:24, 10 December 2024)
- SNRC-1257, 1985 Annual Environ Operating Rept + (12:47:24, 10 December 2024)
- ML20199F378 + (12:47:27, 10 December 2024)
- ML20199F379 + (12:47:27, 10 December 2024)