Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248B351 + (23:44:21, 1 December 2024)
- ML20248B350 + (23:44:21, 1 December 2024)
- LD-89-107, Forwards Addl Info Re CESSAR-DC Chapter 7 + (23:44:22, 1 December 2024)
- ML20248B349 + (23:44:22, 1 December 2024)
- ML20248B347 + (23:44:23, 1 December 2024)
- B13226, Discusses Significant Findings Re Two Isolation Valves in RWCU Sys,Per Util 890302 LER Concerning 10CFR50.49 Equipment Review.Corrective Actions Included:Motor Operators for Valves 1-CU-2 & 1-CU-3 Replaced & Procedure Reemphasized + (23:44:24, 1 December 2024)
- 05000483/LER-1989-011-01, :on 890905,ESF Containment Purge,Control Room Ventilation & Fuel Bldg Ventilation Isolations Received. Caused by Failed 15-volt Dc Power Supply in Train B ESF Cabinet.Power Supply Replaced & Tested + (23:44:26, 1 December 2024)
- ML20248B343 + (23:44:27, 1 December 2024)
- ML20248B342 + (23:44:28, 1 December 2024)
- ML20248B334 + (23:44:29, 1 December 2024)
- ML20248B336 + (23:44:29, 1 December 2024)
- ML20248B332 + (23:44:30, 1 December 2024)
- ML20248B328 + (23:44:32, 1 December 2024)
- ML20248B324 + (23:44:36, 1 December 2024)
- 05000259/LER-1988-035, :on 881021,unplanned Automatic Start of Train B of Control Room Emergency Ventilation Occurred.Caused by Procedural Inadequacy.Scheduling & Work Control Program Upgraded to Require Impact Evaluation + (23:44:37, 1 December 2024)
- ML20248B321 + (23:44:38, 1 December 2024)
- ML20248B320 + (23:44:39, 1 December 2024)
- ML20248B317 + (23:44:40, 1 December 2024)
- ML20248B314 + (23:44:46, 1 December 2024)
- ML20248B312 + (23:44:47, 1 December 2024)
- ML20248B313 + (23:44:47, 1 December 2024)
- ML20248B308 + (23:44:48, 1 December 2024)
- ML20248B310 + (23:44:48, 1 December 2024)
- ML20248B306 + (23:44:50, 1 December 2024)
- ML20248B305 + (23:44:50, 1 December 2024)
- 05000322/LER-1989-006, :on 890707,hydraulic Transient Inadvertently Initiated Which Resulted in Automatic ESF & Reactor Trip. Caused by Personnel Error.Reactor Trip & Analog Trip Alarms Reset.Personnel Involved Counseled + (23:44:52, 1 December 2024)
- ML20248B300 + (23:44:53, 1 December 2024)
- ML20248B299 + (23:44:54, 1 December 2024)
- ML20248B298 + (23:44:54, 1 December 2024)
- ML20248B297 + (23:44:55, 1 December 2024)
- ML20248B296 + (23:44:55, 1 December 2024)
- ML20248B295 + (23:44:56, 1 December 2024)
- ML20248B291 + (23:44:57, 1 December 2024)
- ML20248B294 + (23:44:57, 1 December 2024)
- ML20248B289 + (23:44:58, 1 December 2024)
- ML20248B288 + (23:44:58, 1 December 2024)
- ML20248B287 + (23:44:59, 1 December 2024)
- ML20248B285 + (23:45:01, 1 December 2024)
- IR 05000324/1989011 + (23:45:02, 1 December 2024)
- ML20248B282 + (23:45:02, 1 December 2024)
- ML20248B279 + (23:45:05, 1 December 2024)
- ML20248B277 + (23:45:05, 1 December 2024)
- 05000313/LER-1989-031, :on 890829,unexpected Control Room Isolation & Actuation of Control Room Emergency Ventilation Sys Occurred.Cause Undetermined.Further Investigation Into Cause Will Be Conducted + (23:45:07, 1 December 2024)
- ML20248B275 + (23:45:08, 1 December 2024)
- ML20248B270 + (23:45:09, 1 December 2024)
- ML20248B272 + (23:45:09, 1 December 2024)
- ML20248B268 + (23:45:10, 1 December 2024)
- ML20248B267 + (23:45:11, 1 December 2024)
- ML20248B263 + (23:45:11, 1 December 2024)
- ML20248B261 + (23:45:12, 1 December 2024)
- B13317, Application for Amend to License DPR-61,revising Tech Specs to Reflect Changes in Fire Detection/Suppression Sys Upgrades to Support New Switchgear Bldg Const + (23:45:13, 1 December 2024)