Forwards Insp Repts 50-282/98-06 & 50-306/98-06 on 980330-0409 & Nov.Purpose of Insp Was to Assess Conduct of Operations & Included 72 H Observation Period & Review of Administrative Procedures & Policies
ML20248B299
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/26/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Wadley M
NORTHERN STATES POWER CO.
Shared Package
ML20248B303 List:
References
50-282-98-06, 50-282-98-6, 50-306-98-06, 50-306-98-6, NUDOCS 9806010253
Download: ML20248B299 (3)


See also: IR 05000282/1998006

Text

__-

_ -__

-_

_ _ _ . _

_ - _ _ _ _ _ _ - _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _

_ _ _

-_

__

+ .-

3.

May 26,1998

Mr. M. Wadley

Vice President.

Nuclear Generation

Northem States Power Company

414 Nicollet Mall

Minneapolis, MN 55401

SUBJECT:

NRC OPERATIONAL' ASSESSMENT TEAM INSPECTION REPORTS

50-282/98006(DRS); 50-306/98006(DRS) AND NOTICE OF VIOLATION

Deaf Mr. Wadley: .

On April 9,1998, the NRC completed an inspection at the Prairie Island reactor facility. The

enclosed report presents the resu!ts of that inspection.

,

The purpose of the inspection was to independently assess the conduct of operations. This

included a 72-hr observation period and a review of administrative procedures and policies.

During the 2-week period covered by this inspection, your condJct of activities at the Prairie

Island facility was generally characterized by safety-conscious operations. The operations shift

management and control room operators were effective at controlling work in progress and'

performing pre-evolution briefings. Operators were attentive to their assigned duties and were

aware of plant and equipment statuses. Efforts to improve and maintain a high standard for

plant material condition were evident. Operations personnel performed above established

management expectations; however, in some cases, management expectations were low.

Also, we are concemed about two violations of NRC requirements that were identified. The first

violation involved a failure to follow a procedure when isolating a breaker. Operations

personnel did not pursue a procedure change prior to hanging a secure tag. The second

violation involved an inadequate procedure for transferring power for a motor control center. In

this case, engineering personnel failed to revise a procedure when a modification to the system

/

was completed.

I

These violations are cited in the enclosed Notice of Violation, and the circumstances

surrounding the violations are described in detail in the enclosed report. Please note that you

are required to respond to this letter and should follow the instructions specified in the enclosed

Notice when preparing your response. The NRC will use your response, in part, to de'armine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

i

9906010253 990526

PDR

ADOCK 05000292

g

PDR

a

>

..

_

_

__

-_ _

- __ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

___ _ - _ _ _ _

l

l *.

l

M. Wadley

2

'

i

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

Original Signed by John A. Grobe

John A. Grobe, Director

Division of Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-60

Enclosures:

1. Notice of Vic'ation

2. Inspection Reports 50-282/98006(DRS); 50-306/98006(DRS)

i

cc w/encis:

Plant Manager, Prairie Island

State Liaison Officer, State

of Minnesota

State Liaison Officer, State

of Wisconsin

Tribal Ccuncil

Prairie Island Dakota Community

1

4

DOCUMENT NAME: G:DRS\\PRA98006.DRS

v. e.w . cos,y w n

m>c..e seie. in oi. i.on: c cm ww emm.nu.new. r . cw oi .n.crimumo. . er % em

,

OFFICE

Rlli

lV Rlli

l Rill

AJ

Rill

AW

NAME

AStone:jpWA MLeachWA

JMcCormick-BGh,6 JGrobeF

DATE

05#f/98

05kf/98 -

05//ty98

05/tk98

I

"

OFFICIAL RECORD COPY

. _ . _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ - _ _ _ _ _ .

H

'

l

l

lt

i

M. Wadley

3

i'

Distribution:

CAC (E-Mail)

Project Mgr., NRR w/encls

A. Beach w/encls

l

J. Caldwell w/encls

B. Clayton w/encls

l

SRI Prairie Island w/encls

l

DRP w/encls

!

TSS w/encls

!

DRS w/encls

Rlli PRR w/encis

PUBLIC IE-42 w/encls

(

Docket File w/encls

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

!

l

1

l

1

i

'90038

,

i

l

1

!

l

C____________________._______.____.._____________..._...

_

J