Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17332A557 +
- ML18022A948 +
- ML18022A947 +
- 05000528/LER-1993-011, Forwards Suppl 1 to LER 93-011 Per 10CFR50.73,reporting That Addl Undervoltage Scenario Has Been Identified That Could Result in Possible Double Sequencing of SR Equipment +
- ML17311A645 +
- ML18038B119 +
- ML18038B118 +
- ML18101A540 +
- ML18153B222 +
- ML18152A347 +
- ML20080H960 +
- ML20080G852 +
- ML20080G832 +
- ML20080G824 +
- ML20080G818 +
- ML20078P155 +
- ML20078P109 +
- ML20078N935 +
- ML20078M795 +
- ML20078M793 +
- ML20078M125 +
- ML20078L960 +
- ML20078L871 +
- ML20078L661 +
- ML20078L343 +
- ML20078L340 +
- ML20078K939 +
- ML20134K135 +
- ML20129E830 +
- ML20129E795 +
- ML20216F796 +
- ML20216F789 +
- U-602410, Expresses Understanding That NRC Will Continue Review & Evaluation of Util Request for Permanent Change to Drywell Bypass Leakage Test Frequency,Requested by 940812 & 1014 Ltrs +
- ST-HL-AE-4845, Forwards South Tx Project SPDS Sar +
- PY-CEI-NRR-1906, Forwards Copies of Three Oh EPA Approvals for Use of Cooling Water Sys Additives at Perry Nuclear Power Plant Received Since Apr 1992 for Info +
- PY-CEI-NRR-1907, Forwards Color Transparencies from Aerial Remote Sensing Programs Conducted at Plant in 1987,1988,1990 & 1992 Per Section 4.2.2.1 of Environ Protection Plan,App B to License NPF-58 +
- ML20265C239 +
- ML20198H396 +
- 05000298/LER-1995-001, :on 950107,tested Surveillance of Detection Sys Supervisory Circuits.Caused by Defective Procedure.Fire Watch Posted in DG Fire Areas & Maintained Until Detection Sys Was Declared Operable +
- 05000336/LER-1994-026, :on 940825,vital 120 Volt AC Sys Degraded. Caused by Inadequate Design in Coordination of H Analyzer Power Supply.Change Was Implemented to Install Fuses +
- 05000348/LER-1995-001, :on 950113,reactor Trip Occurred Due to Loss of Turbine DEHC Overspeed Protection.Root Cause Analysis Investigation Was Performed.Mods Performed to Reduce Vulnerability of OPC Processor +
- 05000321/LER-1995-001, :on 950110,personnel Error Resulted in Missed TS Surveillance.Operations Shift Supervisor Was Counseled on Importance of Paying Attention to Detail +
- ML20198Q112 +
- ML20198P752 +
- ML20134K444 +
- IR 05000280/1995002 +
- ML18153B221 +
- HNP-95-016, Proposed Tech Specs 3.1.1.2 Re Relocating Shutdown Margin Vs Boron Concentration Curve to COLR +
- ML18101A531 +
- ML18101B399 +