Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1993-60, Reporting Fuel Cycle and Materials Events to the NRC Operations Center +
- ML17228A245 +
- ML18100A526 +
- ML18100A518 +
- ML18100A517 +
- ML18100A516 +
- ML20029D599 +
- ML20046D353 +
- ML20046D224 +
- ML20046C630 +
- ML20046C627 +
- ML20046C626 +
- ML20046C514 +
- ML20046C506 +
- B14562, Proposed Tech Specs Adding Requirement 4.8.1.1.2.C.8,items A,B, & C to EDG Surveillance Requirements Section to TS Section 3/4.8, Electrical Power Sys +
- ML20046C424 +
- ML20046C384 +
- ST-HL-AE-4383, Requests Enforcement Discretion from Requirements of TS 3.7.1.2,Action B,Applying to Turbine Driven (Td) AFW Pump. Proposes That AOT in Mode 3 for Train D,Td AFW Pump Be Increased by Addl 72 H on one-time Basis for Unit 1 +
- ML20046C336 +
- B14560, Responds to 930713 Telcon W/Nrc Requesting Addl Justification Re Proposed Rev to TS Per Deletion of Requirement to Depressurize & Vent RCS W/Less than Minimum Power Sources Operable in Mode 5 & 6 +
- ML20046C310 +
- ML20046B417 +
- ML20057B022 +
- ML20057B018 +
- ML20056G589 +
- ML20056G142 +
- ML20056D267 +
- ML20069D563 +
- ML20072L297 +
- IR 05000293/1993011 +
- ML20059C845 +
- ML20059B938 +
- ML20057F139 +
- ML20057E187 +
- ML20057C407 +
- ML20056H616 +
- ML20056H590 +
- ML20056H547 +
- ML20056H195 +
- ML20056G529 +
- ML20056E904 +
- ML20056E901 +
- ML20056E865 +
- ML20056E607 +
- ML20056E559 +
- ML20056E499 +
- ML20056E446 +
- ML20056E412 +
- ML20056E410 +
- ML20056E399 +