Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18037A825 +
- ML18037A823 +
- ML18059A944 +
- ML18059A942 +
- ML20065J987 +
- ML20065H677 +
- ML20065H264 +
- ML20065H230 +
- ML20065H226 +
- ML20065H220 +
- ML20065G586 +
- ML20065G526 +
- ML20065G412 +
- ML20065F510 +
- ML20065E566 +
- ML20065C990 +
- ML20210U900 +
- NG-94-1147, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-331/94-01.Corrective Actions:Upon Discovery of Missed TS Surveillance,Aprms Declared Inoperable & Plant Entered LCO Until Surveillance Complete +
- 3F0494-01, Forwards Rev 20 to Crystal River Unit 3 Fsar,Reflecting Commitment in to Adequately Reflect in FSAR Portions of Facility TS Not Transferred to Improved TS Implemented at Facility on 940312 +
- NRC-94-4090, Forwards Proprietary Version of Quick Look Rept for Large Scale Pccs Test 222.1,AP600 Program. Rept Withheld,Per 10CFR2.790 +
- HL-4550, Informs That in Response to Listed Items from SE for 18 Responses Provided in Util ,Util Has Revised Relief Requests RR-P-6 & RR-P-7 of Second 10-yr Insp Interval IST Program.Revised Relief Requests Encl +
- RC-94-0096, Forwards Technical Rept 93-3, Seismic Activity Near Vsns for Period Jul-Sept 1993 & Technical Rept 93-4, Seismic Activity Near Vsns for Period Oct-Dec 1993 +
- LD-94-023, Forwards Responses to Questions Raised by ACRS ABB-CE Std Plant Designs Subcommittee at 940308-09 Meeting on Sys 80+ +
- ML20266G767 +
- ML20266G590 +
- 05000318/LER-1994-002-01, :on 940305,inadvertent ESF Actuation Occurred Due to Less than Adequate Self Verification.Expectations to Restart self-verification Process If Interrupted Reemphasized +
- 05000285/LER-1994-003, :on 940304,raw Water Pumps Declared Inoperable. Caused by Excessive Sand Accumulation Around Suction Area of Pumps.Frequency of Rotating RW Pumps Increased +
- 05000353/LER-1994-001-02, :on 940302,operator Determined That ST Procedure for Unit 2 Isolation Actuation Instrument TU Had Not Been Performed.Cause Was Personnel Error.Shift Supervisor Was Counseled +
- ML20065J547 +
- ML20029C796 +
- ML20065J535 +
- ML18037A819 +
- ML18037A817 +
- IR 05000315/1994002 +
- ML17352A503 +
- IR 05000244/1993021 +
- ML17059A251 +
- ML17352A500 +
- ML14182A266 +
- ML17228A525 +
- ML17228A523 +
- ML20138E329 +
- ML20065J526 +
- ML20029D754 +
- ML20065J531 +
- TAC:M88005 +