Forwards Rev 2 Browns Ferry Nuclear Plant Unit 3,Cycle 7 COLR, in Accordance W/Ts 6.9.1.7 to Support Unit 2 Operation W/Revised MCPR Operating Limit
ML18037A823
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/04/1994
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18037A825 List:
References
NUDOCS 9404120284
Download: ML18037A823 (8)


Text

ACCELERATED DI TRIBUTION DEMONST TION SYSTEM

  • , ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9404120284 DOC.DATE: 94/04/04 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH. NAME AUTHOR AFFILIATION SALAS,P. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 2 Browns Ferry Nuclear Plant Unit 3,Cycle 7 COLR," in accordance w/TS 6.9.1.7 to support Unit 2 operation,w/revised MCPR operating limit.

DISTRIBUTION'ODE: D030D COPIES RECEIVED: LTR TITLE: TVA Facilities Routine Correspondence J ENCL I SIZE: 0+ /'ID NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-4 1 1 TRIMBLE,D 1 1 INTERNAL: ACRS 6 6 NRR/DSSA 1 1 0&4+ C 1 0 OGC/HDS3 1 0 REG KILE 01 1 1 RES/DE/SSEB/SES 1 1 EXTERNAL: NRC .PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiVI Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 13

0 Tennessee Valley Authority. Post Office Box 2000. Decatur. Alabama 35609 APR 04 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of Docket Nos. 50-260 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT (BFN) UNIT 2 REVISION TO CORE OPERATING LIMITS REPORT (COLR)

In accordance with the requirements of Technical Specification 6.9.1.7, TVA is submitting in the enclosure a revision to the Unit 2 COLR. The revised COLR was issued March 24, 1994, to support Unit 2 operation with a revised minimum critical power ratio (MCPR) operating limit.

Figures 1 and 2 of the current Unit 2 COLR specify the MCPR operating limit for each fuel type. Since Unit 2 startup in June 1993 following the Cycle 6 refueling outage, TVA has operated Unit 2 in a manner that optimizes fuel management and extends the full power operating life of the core. As a result, TVA is now predicting that the end-of-cycle exposure distribution will be slightly different than TVA assumed inTo its original transient analysis for the operating cycle.

account for the different exposure distribution, TVA is changing Figures 1 and 2 to reflect revised MCPR operating limits for the remainder of the cycle.

tsf404l20284 940404 PDR,,ADOCK 050002b0 p PDR

il E

U.S. Nuclear Regulatory Commission Page,2 APR 04 SQ If you have any (205) 729-2636.

questions, please telephone me at Sincerely, Pedro Salas Manager of Site Licensing Enclosure cc: See page 3

U.S. Nuclear Regulatory Commission Page 3 APR 04 l<<d Enclosure cc (Enclosure):

Mr. R. V.. Crlenjak, Project Chief U.S. Nuclear Regulatory Commission Region II.

101 Marietta Street, NWg Suite 2900 Atlanta, Georgia 30323 Regional Administrator U.S. Nuclear Regulatory Commission Region 101 II Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr. D. C. Trimble, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Z. F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852