ML17352A500
| ML17352A500 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/04/1994 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17352A501 | List: |
| References | |
| NUDOCS 9404060211 | |
| Download: ML17352A500 (7) | |
Text
q qE00 (4
"o Op 0O I
gO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 LORIDA POW R AND IGH COMPA Y DOC
- 0. 50-250 TURKEY POINT P ANT UNI NO 3
AMENDM N TO FAC L TY OPERATING LICENSE Amendment No License No.
DPR-31 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated April 20,
- 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
94040b0211 940404 PDR ADOCK 05000250 P
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B-of Facility Operating =License No.- DPR-31:is.hereby amended to read as follows:
(8) h e i ion o et e inP The Technical Specifications contained in Appendix A, as revised through Amendment No. <<~, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION He bert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 4, 1994
'PS AE00 (4
~o Op I
0O
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 POM G T C
DOCK T NO. 50- 50 URKEY OINT PLANT UNIT NO.
3 MEND N
TO FACILIT OPERATING L CENSE Amendment No License No.
DPR-31 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power and Light Company (the licensee) dated April 20,
- 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-41 is hereby amended to read as follows:
(B) c i n d
o cto l
The Technical Specifications contained in Appendix A, as revised through Amendment No. 155, are hereby incorporated in the license.
The Environmental Protection Plan contained in Appendix B is hereby incorporated into the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
1 Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
A ACHM NT TO LICENSE AMENDMENT M
M N
NO 161 FACILITY OPERATING L CENSE NO.
DPR-31 N
NO.
FACIL TY OPERATING CENSE NO.
DPR-41 DOCKET NOS.
50-250 AND 50-251 Revise Appendix A as follows:
~R 2-7 Insert a
e 2-7
TABLE 2.2-1 Continued TABLE NOTATIONS NOTE 1:
OVERTENPERATURE hT 6T 1 + v'~S
(
1 1+ TzS; 1+
v'here:
hT
=
Neas Lag compensator on measured 6T; r> = Os 1 + TIES Indicated ZiT at RATED THERNAL POWER
) < dTp (K>
Kg ~1 + r S) [y (
]
)
y,] + g (p p,)
g (gg)}
3S
(
1 + T6S) 6 ured ET by RTD Instrumentation 1 + v>S
=
Lead/Lag compensator on measured hT; v'<=Os, v> =Os 1 + TIES Kz 4
1+vS 1+ T6S T4y V5 1 + AS 1.095; 0.0107/
F; The function generated by the lead-lag compensator for T dynamic compensation; Time constants utilized in the lead-lag compensator for T8g Y4
- 25s, T6 = 3 S~
Average temperature, F;
Lag compensator on measured T8<g 76 Os 574.2 F (Nominal T at RATED THERNAL POWER);
0.000453/psig; Pressurizer
- pressure, psig;
~
ri