Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17317A371 +
- ML17312A841 +
- ML18065A814 +
- ML18151A388 +
- ML18152A194 +
- ML18151A387 +
- ML20116D961 +
- ML20116B962 +
- ML20116B614 +
- ML20115H195 +
- ML20115F247 +
- ML20115F227 +
- ML20115C285 +
- ML20115C111 +
- ML20115B779 +
- ML20115B153 +
- ML20115B001 +
- ML20115B005 +
- ML20115A944 +
- ML20115A878 +
- ML20115A869 +
- ML20115A790 +
- ML20115A750 +
- ML20115A668 +
- ML20113E450 +
- ML20136A754 +
- ML20136A947 +
- ML20138F078 +
- ML20134D719 +
- ML20129G654 +
- ML20129G647 +
- ML20149L627 +
- ML20149L625 +
- ML20203J776 +
- L-96-014, Forwards Monthly Operating Reports for June 1996 for Point Beach Nuclear Plant Units 1 & 2 and Revised Rept for May 1996 +
- ST-HL-AE-5416, Forwards Record of Investigative Findings & C/A Taken by Lab Specialist,Inc Due to Unsatisfactory Blind Performance Test Result +
- TAC:M94801 +
- ULNRC-03397, Informs of Implementation of Amend 111 to License NPF-30. Amend Approved Changes to TS 1.7,4.6.1.1,.3.6.1.3,4.6.1.3, 6.8.4 & Associated Bases Section +
- NG-96-1397, Forwards Response to NRC 960531 RAI on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves +
- U-602596, Provides Addl Info for Amend to Incorporate Proposed Change to CPS Ts, ,be Reviewed on Schedule Sufficient to Support Sixth Refueling Outage Currently Scheduled to Begin 961013 +
- ST-HL-AE-5408, Forwards Results for Hot,Full Flow Rod Drop Testing in Unit 1 for Cycle 6,performed on 960518 & Hot Full Flow Rod Drop Testing of New Cycle 7 Core,Performed on 960608,per NRC Bulletin 96-001 +
- 1CAN079603, Requests Relief from Section IWA-5213 of ASME Section XI IST Requirements Because 10 Minute Hold Time Could Not Be Reasonably Obtained on Certain Sections of Train a EFW W/O Undue Hardship & Expense +
- 1CAN079601, Requests Relief from Requirements of ASME B&PV Code,Sections III & XI Due to Flaws in SW Piping,Iaw 10CFR50.55a & Guidance Provided in GL 90-05 & GL 91-18 +
- B15782, Provides Listed Documentation in Support of Method of Supporting Requirements of Previously Proposed License Amend Re one-time Change to Plant,Unit 2 TS 3.9.1 +
- RBG-43077, Submits Response to Violations Noted in Insp Rept 50-458/96-04.Corrective Actions:Insps of Instrument Performed for Each Transmitter Found Without Required Plug +
- ML20115B217 +
- ML20266F892 +
- ML20115H650 +
- 05000456/LER-1995-013, :on 960604,determined Fire Protection Discrepancies.Caused by Inadequate Evaluations.Continued Hourly Fire Watches & Initiated Plant Modifications +
- 05000327/LER-1995-010, :on 950717,turbine & Reactor Trips Occurred. Caused by Bellows Being Deformed When Sudden Pressure Relay Is Isolated & Heated.New Qualitrol Relays Installed & Placed in Service +