Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000280/1995019 + (December 1, 1995)
- 05000272/LER-1995-028-01, :on 950920,effective Leakage Monitoring Program Did Not Meet TS 6.8.4a Requirements Due to Mgt/Qa Deficiency.Consolidated Program Under Single Organization to Assure Plant Design Basis Satisfied + (December 1, 1995)
- 05000311/LER-1995-007-02, :on 900503,diesel Surveillance Required by TS Was Missed.Revised Process for Modifying EDG Surveillance Frequency + (December 1, 1995)
- ML18101B143 + (December 1, 1995)
- ML18065A325 + (December 1, 1995)
- ML18065A323 + (December 1, 1995)
- ML18153A548 + (December 1, 1995)
- ML17324A108 + (December 1, 1995)
- ML17311B287 + (December 1, 1995)
- DCL-95-262, Forwards Publicly Available Version of Update to Corporate Erpips + (December 1, 1995)
- IR 05000275/1995098 + (December 1, 1995)
- ML16138A794 + (December 1, 1995)
- ML16138A796 + (December 1, 1995)
- ML15117A316 + (December 1, 1995)
- ML17291B147 + (December 1, 1995)
- ML17264A291 + (December 1, 1995)
- ML16342D133 + (December 1, 1995)
- ML17264A289 + (December 1, 1995)
- NUREG-1431, Summary of 951113 Meeting W/Util to Clarify 950526 Submittal Which Proposed to Convert Existing TS to Improved TS Based on NUREG-1431,Rev O, STS Westinghouse Plants. Attendees List & Tsip Questions Encl + (December 1, 1995)
- ML17059B013 + (December 1, 1995)
- TAC:M94142 + (December 1, 1995)
- ML20095C605 + (December 1, 1995)
- ML17333A211 + (December 1, 1995)
- 05000302/LER-1995-014, :on 950818,determined That Ventilation Air Flow within TSC Outside Accepted Air Flow Ranges.Caused by Fan Performance Exceeding Design Flow Requirements.Fan Speed Reduced & Power Removed from Dampers + (December 1, 1995)
- ML20095F404 + (December 2, 1995)
- ML17324A077 + (December 2, 1995)
- ML17324A109 + (December 2, 1995)
- ML20266B644 + (December 3, 1995)
- ML20266F899 + (December 3, 1995)
- 05000443/LER-1995-007, :on 951103,MSSV Setpoint Testing Failed.Reset Four MSSVs to Required Setpoint & Retested Satisfactorily at Plant + (December 3, 1995)
- 05000400/LER-1995-011-01, :on 951105-06,reactor Trip/Si Signal Generated & Unplanned ESF Actuation Occurred During Troubleshooting. Reactor Trip Caused by Equipment Failure.Component Replaced + (December 3, 1995)
- ML17324A019 + (December 3, 1995)
- ML17228B347 + (November 16, 1995)
- ML17264A285 + (December 4, 1995)
- ML17264A284 + (December 4, 1995)
- ML18038B565 + (December 4, 1995)
- ML18101B135 + (December 4, 1995)
- ML18065A327 + (December 4, 1995)
- ML20096H150 + (December 4, 1995)
- ML20095D395 + (December 4, 1995)
- ML20095C892 + (December 4, 1995)
- ML20095C758 + (December 4, 1995)
- ML20095B881 + (December 4, 1995)
- ML20095B856 + (December 4, 1995)
- ML20095B550 + (December 4, 1995)
- ML20095B546 + (December 4, 1995)
- ML20095B472 + (December 4, 1995)
- ML20095A806 + (December 4, 1995)
- ML20095A629 + (December 4, 1995)
- ML20095A520 + (December 4, 1995)
- ML20095A476 + (December 4, 1995)
- ML20094S330 + (December 4, 1995)
- ML20094S273 + (December 4, 1995)
- ML20198N075 + (December 4, 1995)
- ML20217D466 + (December 4, 1995)