December 1,
1995 Hr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, New York 13093
SUBJECT:
INTEGRATED PERFORMANCE ASSESSMENT PROCESS NRC TEAM INSPECTION
Dear Hr. Sylvia:
The purpose of this letter is to announce an inspection of your Nine Mile Point Nuclear Station using the integrated performance assessment process (IPAP).
We have scheduled the onsite inspection for the periodsof March 4-8,
- 1996, and March 18-22, 1996 and your staff has indicated that their are no major conflicts with onsite activities.
The inspection objective will be to develop an integrated perspective of performance strengths and weaknesses based on a review of objective information; to validate preliminary conclusions about safety performance through an independent, performance-based, onsite inspection; and to develop inspection recommendations based on the results of the inspection.
The inspection requirements and guidance in NRC inspection procedure 93808 will be used for this inspection.
The inspection team will consist of a team leader and eight inspectors.
Hr, S.
K. Halur, from the Special Inspection Branch, Office of Nuclear Reactor Regulation, has been designated as the team leader.
We will be in contact with your staff regarding additional details for the inspection.
Should you have any questions, please contact Hr. Halur at (301) 415-2963 or me at (610) 337-5183.
Sincerely, Original signed by:
Docket Nos.
50-220 50-410 Richard J.
- Conte, Chief Projects Branch 5
Division of Reactor Projects 9512110431 951201 PDR ADQCK 05000220 8
~
PDR j
~ g IE01
Hr.
B. Ralph Sylvia CC:
R. Abbott, Vice President-Nuclear Generation C. Terry, Vice President-Nuclear Engineering H. HcCormick, Vice President Safety Assessment and Support N. Rademacher, Unit 1 Plant Manager H. Balduzzi, Operations Manager J.
Conway, Unit 2 Plant Manager (acting)
D. Wolniak, Manager, Licensing J.
- Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney H. Wetterhahn, Winston and Strawn
- Director, Energy 5, Water Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Vinquist, MATS, Inc.
J,
Hr.
B. Ralph Sylvia 3
Distribution:
D. Screnci, PAO (2)
Region' Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
PUBLIC NRC Resident Inspector R. Conte, DRP H. Eichenholz, DRP S.
- Baker, DRP Distribution: (VIA E-HAIL)
W.
Dean OEDO B. Norris - Nine Mile Point T. Marsh, NRR G. Edison, NRR H. Campion, RI Inspection Program Branch, NRR (IPAS)
DOCUMENT NAME:
G: iBRANCH5iNHIPAP.ANN To recehre a copy of this document, lndhate ln the box:
G' Copy without attachment/enclosure e" ~ Copy with attachment/enclosure
'N' No copy OFFICE NRR/TSIB NAME SHalur meo DATE 11/22/95 RI/DRP RConte OFFICIAL RE ORD COP