Forwards Insp Repts 50-275/95-98 & 50-323/95-98 on 950810-1109.No Violations Noted.Condition Which Has Been Identified as Contributor to Mechanical Overspeed Trips of safety-related Steam turbine-driven Standby Pumps,Noted
ML16342D133
Person / Time
Site: Diablo Canyon  
Issue date: 12/01/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Rueger G
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML16342D134 List:
References
NUDOCS 9512060170
Download: ML16342D133 (12)


See also: IR 05000275/1995098

Text

(NUDOCS OFFSITE FACILITY)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

t'~>'ACCESSION NBR:9512060170

DOC.DATE: 95/12/Ol

NOTARIZED: NO

DOCKET

~ACIL:50-275 Diablo Canyon Nuclear

Power Plant, Unit 1, Pacific

Ga

05000275

50-323 Diablo Canyon Nuclear

Power Plant, Unit 2, Pacific

Ga

05000323

AUTH.NAME

AUTHOR AFFILIATION

GWYNNiT.P.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

RUEGER,G.M.

Pacific Gas

& Electric Co.

SUBJECT:

Forwards

insp repts

50-275/95-98

a 50-323/95-98

on

950810-1109.No violations noted. Condition which has

been

identified as contributor to mechanical

overspeed trips of

safety-related, steam turbine-driven standby

pumps, noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation

R sponse

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

EXTERNAL: LITCO BRYCEgJ

H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

'

1

1

1

1

RECIPIENT

ID CODE/NAME

BLOOMERS

AEOD/DEIB

AEOD/~

~E

OENTER

NER DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

NOAC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE!COiNTACTTHE DOCUMENTCOi ASTROL

DESK, ROOM Pl-37 (EAT. 504-2083 ) TO EL!h!INATEYOUR NAME FROII

DISTRIBUT~IONLISTS FOR DOCUMENTS YOU DON'TNEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

<I.S ~Eicos 'Ip0~~i

kg**4

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

ore

i s95

Pacific Gas

and Electric Company

Nuclear

Power Generation.

814A

ATTN:

Gregory

M. Rueger

~ Senior Vice

President

and General

Manager

Nuclear

Power Generation

Bus. Unit

77 Beale Street,

Room 1451

P.O.

Box 770000

San Francisco.

California

94177

SUBJECT:

NRC INSPECTION REPORT 50-275/95-98;

50-323/95-98

This refers to the inspection conducted

by Mr. C. J.

Paulk

and

Ms. L. J.

Smith

of this office on August 10-11.

1995, at the Diablo Canyon Nuclear Power

Plant. Units

1 and 2. facility.

This initiative was prompted

by recurring

fai lures of safety-related

steam turbine-driven standby

pumps at several

facilities in Region IV.

We concurrently performed this inspection at most of

the Region

IV facilities to better understand

the scope of designs

maintenance,

and testing practices

related to safety-related

steam

turbines'hich

were supplied

by the Terry Corporation.

We also examined several

aspects

of various experience

review processes

to determine

why similar

failures continued to occur.

On November

9

~

1995, at the conclusion of the

in-office review. the findings 'were discussed

with those

members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within

these areas'he

inspection consisted of selective

examinations of procedures,

representative

records,

and interviews with personnel.

The combined results

of this inspection for each of the Region

IV faci 1'ities are documented

in the

enclosed

report and executive

summary.

With respect to your facility, the inspection identified one condition that

has

been identified as

a contributor to mechanical

overspeed trips of

safety-related

steam turbine-driven standby

pumps at other facilities.

Specifically, your staff had not established

a program for routine

refurbishment of the turbine governor.

In addition, Diablo Canyon operates

the auxiliary feedwater

system with the turbine drain valves closed,

which

conflicts with vendor recommendations.

The inspection also noted the absence

of alarms

or indications to alert operators to potential

problems in the

turbine steam line condensate

removal

system.

We encourage

you to review

these conditions to ensure

continued reliable operation of the auxiliary

feedwater

pump turbines.

95i20bOi70 95i20i

PDR

ADOCK 05000275

8

PDR

r

Pacific Gas

and Electric Company

-2-

We noted that your use of a lubricant with vapor-phase

inhibitors was

consistent with vendor recommendations.

However,

use of this oil at other

facilities with high standby temperatures

has resulted in governor speed

control problems,

and improper operation of the overspeed trip tappet.

While

you have not experienced

any problems related to the use of this type of

lubricant. your turbines would become susceptible if your steam admission

.valves

leaked significantly.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-275

50-323

Licenses:

DPR-80

DPR-82

Enclosure:

NRC Inspection Report

50-275/95-98:

50-323/95-98

w/attachments

cc w/enclosure:

Sierra Club California

ATTN:

Dr. Richard Ferguson

Energy Chair

1100 11th Street.

Suite 311

Sacramento,

Cali fornia

95814

San Luis Obispo

Mothers for Peace

ATTN:

Ms.

Nancy Culver

P.O.

Box 164

Pismo Beach, California

93448

Ms. Jacquelyn

C. Wheeler

P.O.

Box 164

Pismo Beach. California

93448

homas

P.

Gwynn

Dir tor

Division of Rea tor

afet

0

Pacific Gas

and Electric Company

-3-

The County Telegram Tribune

'TTN:

Managing Editor

1321 Johnson

Avenue

P.O.

Box 112

San Luis Obispo. California

93406

.San Luis Obispo County Board of

Supervisors

ATTN:

Chairman

Room 370

County Government

Center

San Luis Obispo. California

93408

California Public Utilities Commission

ATTN:

Mr. Truman BurnsNMr. Robert Kinosian

505 Van Ness'm.

4102

San Francisco,

California

94102

Diablo Canyon

Independent

Safety Committee

Attn:

Robert

R. Wellington. Esq.

Legal

Counsel

857 Cass Street.

Suite

D

Monterey. California

93940

Radiologic Health Branch

State

Department of Health Services

ATTN:

Mr. Steve

Hsu

P.O.

Box 942732

Sacramento.

California

94234

State of California

ATTN:

Mr. Peter

H. Kaufman

Deputy Attorney General

110 West A Street.

Suite

700

San Diego. California

92101

Pacific Gas

and Electric Company

ATTN:

Christopher J. Warner'sq.

P.O.

Box 7442

San Francisco,

California

94120

Diablo Canyon Nuclear

Power Plant

ATTN:

Warren

H. Fujimoto, Vice President

and Plant Manager

P.O.

Box 56

Avila Beach. California

93424

0

Pacific Gas

and Electr ic Company

-4-

E-Hail report to D. Nelson

(DJN)

E-Hail report to

NRR Event Tracking System

( IPAS)

bcc to

DMB (IE01)

bcc distrib.

by RIY:

L. J. Callan

Resident

Inspector

DRSS-FIPB

HIS System

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

RIV File

Branch Chief'DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

H.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:K DCKDC598RP.CJP

To receive copy of document,indicate

in box: "C" ~ Copy without enclosures

"E" a Copy with enclosures "N" ~ No copy

RIV:RI: EB

RI:HB

C:EB

E

D:DRS

D:DRP

D:DRS

LJSmith

11/22/95

11/22/95

ll/ 5/95

AL

"previous y concurre

CJPaulk*

CAVanDenburgh*

TPGwynn

1V

/95

PY

JEDyert~~

TPGwyn

ll/3 /95

131

/95

r

Pacific Gas

and Electric Company

E-Mail report to D. Nelson

(DJN)

E-Hail report to NRR Event Tracking System

(IPAS)

bcc to

DMB ( IEOl)

bcc distrib. by RIV:

L. J. Callan

Resident

Inspector

DRSS-F IPB

HIS System

Branch Chief (DRP/E.

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

MS:

TWFN 9E10)

M.

Hammond

(PAO,

WCFO)

DOCUMENT NAME:

R:K DCKDC598RP.CJP

To receive copy of document, 1ndicate In box: "C" ~ Copy without enclosures

"E" ~ Copy with enclosures "N" ~ No copy

RIV:RI: EB

RI:MB

C:EB

E

D:DRS

D:DRP

D:DRS

LJSmith

11/ 5/95

CJPaulk*

11/22/95

CAVanDenburgh*

11/22/95

TPGwynn

JEDyert~w

1V

/95

11/3 /95

TPGwyn

13J

/95

  • previous y concurre

L

R

pQg(

0