Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17290A356 +
- ML17290A354 +
- Press Release-93-053, NRC Adopts Requirements for Training and Qualification of Nuclear Power Plant Personnel +
- Press Release-93-052, Note to Editors: the NRC Has Received from Its Independent Advisory Committee on Reactor Safeguards Two letter-type Reports Re License Renewal Rule & Definition of Large Release +
- ML18036B261 +
- ML18100A366 +
- ML17306B421 +
- ML20044D628 +
- ML20265F846 +
- ML20058P849 +
- ML20056G741 +
- ML20056D552 +
- ML20056C369 +
- ML20262G598 +
- ML20199K225 +
- ML20045G957 +
- ML20044F050 +
- ML20044F954 +
- ML20044E250 +
- ML20044E100 +
- ML20044F063 +
- ML20044D158 +
- ML20044D235 +
- ML20045C264 +
- 05000338/LER-1993-012, :on 930408,noted That MSL Isolation Signal Generated Causing Ms Trip Valves to Close.Caused by Personnel Error.Coaching Sessions W/Personnel on Importance of Self Checking Have Been Applied +
- IR 05000369/1993004 +
- 05000263/LER-1992-016-01, Forwards LER 92-016-01 Re Failure of Emergency Svc Water Check Valves to Seat Due to Accumulation of Silt.Evaluation Will Be Performed to Determine Feasibility of Replacing Check Valves ESW-13 & ESW-14 +
- 05000338/LER-1993-013, :on 930414,identified Addl Missed Surveillance to Functionally Test Entire Circuitry for Manual Phase a Isolation Switches.Caused by Personnel Error.Periodic Test Procedures Will Preclude Recurrence +
- B14439, Forwards Action Plan Changes & Key Accomplishments for First Quarter 1993 for Performance Enhancement Program. Criteria Used to Determine Substantiveness of Action Plan Change Listed +
- IR 05000286/1993006 +
- 05000301/LER-1993-002-01, :on 930328,reactor Trip Occurred During Performance of TS Test TS-4A, Turbine Trip Test (Monthly) Unit 2. Caused by Procedural Noncompliance & Matl Condition of Valve.Test Terminated & Handwheel Inspected +
- 05000301/LER-1993-002, Forwards LER 93-002-00 Re Reactor Trip Which Occurred During Performance of Thrust Bearing Trip Test Portion of TS Test TS-4A, Turbine Trip Test (Monthly) Unit 2 +
- B14446, Application for Amend to License NPF-49,changing TS to Allow one-time Extension to Containment Integrated Leak Rate Test Until End of Fourth Refueling Outage Currently Scheduled to Begin on 930731 +
- IR 05000483/1993003 +
- PY-CEI-NRR-1640, Responds to SALP Rept Covering 911101-930131,as Suppl to Discussions W/Nrc During 930408 Meeting & Addressing Concerns Delineated in NRC .Appreciates NRC Recognition of Highest Rating in Area of Security +
- IR 05000482/1991007 +
- ML20035H182 +
- ML20044E207 +
- ML20035H352 +
- B14458, Forwards Suppl Info to 930330 Application for Amend to License NPF-49 Re Several 18-month SR for Surveillances Listed in Table 1 of Submittal to Be Performed During Fourth Refueling Outage Presently Scheduled to Begin on 930731 +
- ML20035H093 +
- IR 05000458/1993004 +
- ML20035H689 +
- ML20035H290 +
- IR 05000341/1993004 +
- PNO-III-93-023, on 930426,DOE Contractor Removed Abandoned 600 Ci Co-60 Sealed Source & Associated Depleted U Shielding from Teletherapy Device.Nrc Inspector Observed Removal of Device & Performed Confirmatory Measurements of Source Head +
- ML20036A373 +
- ML20035H564 +
- ML20036A050 +
- ML20035G773 +