Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17263A748 +
- ML060550282 +
- ML20073C325 +
- ML20072F955 +
- ML20072E888 +
- ML20072E276 +
- ML20071Q909 +
- ML20071Q577 +
- ML20071Q321 +
- ML20071P568 +
- ML20071P149 +
- ML20071P030 +
- ML20071N991 +
- ML20071N650 +
- ML20071N304 +
- ML20071N296 +
- ML20132B034 +
- ML20132B228 +
- ML20149F704 +
- ML20149F692 +
- ML20149F698 +
- ML20149F676 +
- ML20149F246 +
- IR 05000346/1994006 +
- ML20149F231 +
- ML20149F216 +
- ML20149E943 +
- ML20149E940 +
- ML20149E883 +
- ML20149E876 +
- ML20149E832 +
- ML20149E840 +
- ML20149E822 +
- ML20149E816 +
- ML20205P216 +
- ML20262E563 +
- TAC:M89086 +
- TAC:M89990 +
- DCL-94-167, Forwards Public Version of Revised Corporate ERPIPs.W/940824 Release Memo +
- BSEP-94-0301, Forwards 1994 Emergency Exercise Objectives +
- NRC-94-4252, Forwards Results of Analysis Using Listed Two 2D Sassi AP600 Models,Per NRC Request Made in Westinghouse/Nrc/Bechtel 940531 & 0601 & 02 Meetings +
- NRC-94-4251, Confirms That Independent Review of AP600 Basemat Analyses Will Be Performed & Identifies Scope of Review,Per Commitment Made During Closeout of NRC Audit of Structural Calculations Wk of 940711 +
- NRC-94-4250, Forwards Proprietary RXS-T2R-003, Quick Look for AP600 Critical Heat Flux (CHF) Test Data Rept. Rept Withheld (Ref 10CFR2.790) +
- RBG-40773, Forwards Interim Relief Request 03,requesting Temporary Relief to Extend Test Frequency & Postpone Testing Required by ASME Section XI,IWV-3521 & IWV-3522 for Inboard Drywell Isolation Check Valve +
- JPN-94-037, Notifies NRC of Util Intention to Extend Current Second 10-yr ISI & IST Interval for Period of 14 Months to Account for Length of 1992 Maint/Refueling Outage +
- RC-94-0205, Submits Response to GL 93-04.Prior to End of Refueling 9 Util Will Implement Current Order Timing Changes to Rod Control Sys & Addl Current Order Surveillance as Recommended by Westinghouse Owners Group +
- BSEP-94-0297, Forwards Brunswick Nuclear Plant Three-Yr Business Plan Performance Improvement Initiatives & Projects, for Aug 940802 +
- ML20199K243 +
- 05000423/LER-1994-009-02, :on 940705,identified Unreliable Control Rod Position Indications.Caused by Failed Instrument Card in Drpi System.Failed Card Was Replaced & Surveillances Were Performed to Ensure System Was Fully Operable +
- ML20071N642 +