Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17329A639 +
- ML18010A823 +
- ML18096B058 +
- ML18096B053 +
- ML20062L088 +
- ML20106E212 +
- NRC-92-0122, Forwards Rev 0 to Core Operating Limits Rept,Cycle 4. COLR Will Be Implemented for Use During Fourth Operating Cycle, Scheduled to Begin in Nov 1992 +
- ML20116M179 +
- ML20116M169 +
- ML20116E069 +
- ML20116B104 +
- 05000298/LER-1992-003, Provides Supplemental Info on Rev 0 to LER 92-003 Re Degradation in safety-related Battery Cells,Per NRC Info Notice 89-017.Existing Monitoring of Battery Cells Provides Ample Advanced Notification of Need to Replace Cells +
- ML20115H125 +
- ML20115G679 +
- ML20115F723 +
- ML20115E971 +
- ML20115E811 +
- ML20115E746 +
- ML20115E016 +
- ML20128H283 +
- ML20128F823 +
- ML20128F821 +
- ML20128C869 +
- ML20128C874 +
- ML20128C744 +
- ML20128C742 +
- ML20128C737 +
- ML20126K425 +
- ML20126A887 +
- IA-92-399, Final Response to FOIA Request for Documents.App a Records Withheld (Ref Exemptions 9 & 10 of Govt in Sunshine Act) +
- IA-92-185, Final Response to FOIA Request for Documents.Forwards Documents Listed in App B Which Are Being Made Available at Pdr.Documents Listed in App a Are Already Available at PDR +
- IA-92-478, DCS Partial Record Format Rept +
- NG-92-4520, Forwards Changes to Rev 13 to QA Program Description, Incorporating Changes Submitted by Util & Listed Changes for NRC Review +
- HL-2950, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-20 & 50-366/92-20 & Enforcement Conference on 920916.Corrective Actions:High Radiation Doors Will Be Upgraded to Ensure Doors Have Automatic Closing Devices +
- HL-2945, Forwards Request for Relief from NUREG-0619 Insp Requirements to Perform Liquid Penetrant Exam of Feedwater Blend Radius & Bore,As Modified by GL 81-11,to Prevent Unnecessary Personnel Radiation Exposure & Expense +
- DCL-92-229, Forwards Rev 3 to Security Force Training & Qualification Plan Per 10CFR50.54(p).Plan Withheld Per 10CFR2.790(d) +
- HL-2006, Application for Amends to Licenses DPR-57 & NPF-5,revising TS to Remove Main Steam Line Radiation Monitor Reactor Scram & Group Isolation Functions,Per BWROG Topical Rept NEDO-31400, SE for Eliminating BWR MSIV Closure.. +
- ML20261L499 +
- ML20261L471 +
- ML20128N849 +
- 05000382/LER-1992-010-01, :on 920919,noncompliance W/Ts 3.1.2.9 Identified Due to Inadequate Procedure.Procedure OP-010-001, General Plant Operations Will Be Revised +
- 05000483/LER-1992-010, :on 920920,plant Experienced Turbine Trip When Lockout Relay Contact Failed in Main Turbine Thrust Bearing Wear Detector Test Circuitry.Lockout Relay Replaced & Test Frequencies Will Be Adjusted +
- 05000324/LER-1992-005, :on 920528,MCC 2-2XB-2 Declared Inoperable Due to Seismic Support & Anchorage Deficiencies.Root Cause Analysis in Progress.Subj MCC Repaired & Engineering Evaluation Procedure ENP-12 Will Be Revised +
- 05000341/LER-1992-010, :on 920918,auto-start Logic for All Station Air Compressors Lost When Modular Power Unit MPU-3 Deenergized. Caused by Personnel Error.Accountability Meeting Held to Address Event & AOP Revised +
- 05000325/LER-1992-024, :on 920919,relay Failure Resulted in RPS B Power Loss Causing ESF Actuation Signals.Caused by Broken T-Bar in Relay 1-C71B-K1B.Relay Repaired,Fuse Replaced & RPS Bus B Restored +
- 05000289/LER-1992-002-01, :on 920918,reactor Tripped as Result of Inadequate Review for Removal of Circulation Water Pump Trip on High Condenser Inlet Water Box Pressure.Procedures Will Be Revised to Provide Addl Guidance +
- 05000341/LER-1992-008, :on 920919,electrician Did Not Open Bus 65F Trip Cutoff Switch,Resulting in Deenergization of Bus.Caused by Personnel Error.Continuing Training for Operations & Electrical Maint Will Be Emphasized +
- ML20116A890 +
- ML20116A879 +
- ML20044B584 +