ML20116B104
| ML20116B104 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/19/1992 |
| From: | Tuckman M DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| REF-GTECI-A-48, REF-GTECI-A-49, REF-GTECI-CO, REF-GTECI-RV, TASK-048, TASK-049, TASK-48, TASK-49, TASK-OR GL-91-11, NUDOCS 9211020053 | |
| Download: ML20116B104 (1) | |
Text
.
Il i
Duke ibent Com;>any MS Traun
, (atuo ha Nuclear Cearmlion Department tyce Mi&rit Vo0 Cencord Ru1 (803)831-r05Omce
)wk SC 29745 (803)S.'l 3426 fax DUKE' POWER October 19, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washi.ngton, DC 20555
Subject:
Catawba Nuclear Station Docket Nos.- 50-413 and 50-414 Supplement to Generic Letter 91-11 In a letter to the NRC dated January 31, 1992, Duke Power provided its response to Generic Letter 91-11, Resolution of Generic Issue-48, "LCOs Fct Class IE Vital Instrumentation Buses," and Generic Issue 49, " Interlocks and LCOs for Class IE. Tie Breakers". Attachment 3,Section III.B.3 of the above letter contained a _ word processing error which caused the last sentence in that section to be incomplete. The last sentence in
,,Section III.B.3 should read as follows:
"Only when IEhtXS is supplied from the SSF motor control center, SMXG-F02C, via the alternate incoming breaker (F03A) on IEMXS would it be possible to tie IEMXS and 2EMXS together.'
Very truly yours, f, %.
W M. S. Tuckman CRIJGL91-ll xc: S. D. Ebneter Regional Administrator, Region II R. E. Martin, ONRR W. T. Orders Senior Resident Inspector
- 36000, M
921102003a 921019 PDR ADOCK 05000413 g
g P
PU f.
- p
.