- ML18106A269 +
- ML18106A257 +
- ML18106A256 +
- IR 05000409/1997001 +
- ML20199A935 +
- ML20199A777 +
- ML20199A183 +
- ML20199A040 +
- ML20198T244 +
- ML20198S202 +
- ML20198S117 +
- ML20198R769 +
- ML20198R452 +
- ML20198Q687 +
- ML20198P895 +
- ML20198N504 +
- ML20202G517 +
- ML20202E478 +
- ML20236Y175 +
- ML20217R010 +
- RBG-44355, Cycle 8 Startup Physics Test Summary +
- 0CAN019802, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/97-18 & 50-368/97-18.Corrective actions:50.59 Evaluation for Rev 8 to 1000.120, ANO Fire Watch Program, Was Approved by ANO Plant Safety Committee on 971209 +
- BSEP-97-0530, Forwards Brunswick Unit 2,Cycle 13 Neutronics Startup Rept & BSEP Unit 2 Power Uprate Startup Test Rept for Cycle 13, Per TS 6.9.1.1.Repts Are Being Submitted Due to Change in Max Licensed Power Level from 2436 to 2558 Mwt +
- SVP-98-013, Forwards non-proprietary Version of Rev 1 to EMF-96-180, Quad Cities Unit 2 Cycle 15 Plant Transient Analysis. Affidavit Is Provided to Request That Proprietary Version, Sent Inadvertently w/971104 Ltr,Be Withheld +
- NSD-NRC-98-5528, Forwards W Responses to FSER Open Items Re AP600.NRC Should Review Encl & Inform W of Status to Be Designated in NRC Status Column of Oits +
- 3F0198-11, Provides Confirmation by Util of Actions Completed Re LAR 220 for Unit 3,as Previously Discussed in Ltr +
- NOC-AE-0066, Informs That Util Prepared to Respond to Info Provided in NRC Ltr & Believe,Util Will Show Info Does Not Support Finding,Individuals Subj to Any Adverse Action, Raised safety-concern +
- ML20202D614 +
- ML20198S858 +
- ML20202C536 +
- ML20203F379 +
- 05000362/LER-1997-003-02, :on 971218,determined That Pressurizer Safety Valve Setpoints Were Out of Tolerance.Caused by Setpoint Drift.Valves Will Be Disassembled,Inspected,Reassembled & Reset by Proper Personnel +
- 05000254/LER-1994-002-03, :on 940104,B CR HVAC Declared Inoperable. Caused by Failure in Contactor Which Resulted from Cumulative Cycling of Compressor.Contactor Replaced +
- ML20199B020 +
- ML20198S705 +
- ML20199A967 +
- 05000272/LER-1996-005-15, Forwards LER 96-005-15, Inadequate TS Testing - Feedwater Sys Isolation Functional Test/Component Cooling Water Heat Exchanger Service Water Flow Control Valves +
- LR-N980025, Forwards Overview of Steps Pse&G Has & Is Taking to Sustain Continued Improvement for Future.Info Is Being Provided to Commission as Follow Up to Briefing Provided in June 1997 +
- LR-N980008, Discusses Option Chosen by Util to Resolve Issues Re Spent Fuel Pool Liner Analysis.Util Will Seismically Qualify Spent Fuel Pool Cooling Sys Which Will Eliminate Need to Postulate Loss of Forced Cooling +
- GO2-98-011, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-17.Corrective Actions:Technician Visually Verified Area to Be Clear of Personnel & Immediately Locked Gate & Performed Walkdown to Verify Locked Status of Similar Areas +
- TAC:M94465 +
- ML20199E015 +
- ML20196D568 +
- 05000461/LER-1997-036, :on 971222,engineering Completed Evaluation of Missing Motor Shaft Key That Connects Motor to Fan Hub of Div II Shutdown SW Pump Room Cooler.Caused by Inoperability of Room Cooler.Cooling Fan Restored,Per 10CFR21 +
- 05000413/LER-1997-009-01, Forwards LER 97-009-01 Re Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis.Event Considered to Be of No Significance W/Respect to Health & Safety of Public +