Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1990-25, Loss of Vital AC Power with Subsequent Reactor Coolant System Heat-Up +
- Information Notice 1990-25, Loss of Vital AC Power With Subsequent Reactor Coolant System Heat-Up +
- ML17328A669 +
- ML17328A668 +
- ML17328A667 +
- ML17285B222 +
- ML17305A691 +
- ML17305A690 +
- ML17305A689 +
- ML18285A704 +
- ML18054B555 +
- ML20042G377 +
- ML20042F106 +
- ML20042E637 +
- ML20042E541 +
- ML20042E072 +
- ML20266D855 +
- ML20266D831 +
- ML20055H179 +
- ML20055F962 +
- ML20206Q298 +
- ML20198T534 +
- ML20055F964 +
- TXX-9014, Special Rept 1-SR-90-005-00:on 900404,positive Moderator Temp Coefficient Noted During Low Physics Testing Due to High Boron Concentration in Moderator.Rod Withdrawal Limits Imposed Per Tech Spec 3.1.1.3a,Action a.1 +
- 05000155/LER-1990-001-01, :on 900323,discovered That Proposed safety- Related Mod,Completed in Jul 1989,had Not Received PRC Review Prior to Implementation.Caused by Personnel Error. Incident Reviewed W/Engineering Staff +
- ML20042F914 +
- ML20042F854 +
- ML20042E467 +
- ML20034C521 +
- AECM-90-0071, Forwards Rev 0 to Temporary Procedure 04-1-01-P41-1-Temp-10, Contingency Long-Term Cooling for Standby Svc Water Basin a +
- ML20034B838 +
- ML20034B813 +
- 0CAN049009, Forwards Errata to Semiannual Effluent Release Rept for Third & Fourth Quarters 1989 Re Radiation Dose Data +
- 05000483/LER-1990-003, :on 900314,determined That Fire Protection Halon Sys for Either ESF Switchgear Rooms Could Have Disabled Both Trains of Class 1E Air Conditioner Units. Caused by Design Error.Trip Signal Removed +
- IR 05000298/1990011 +
- B134698, Provides Clarification Re Lowest Flow Acceptance Criterion for Hydrogen Recombiners Included in NRC SER Based on 891201 & 900119 Submittals +
- 05000370/LER-1990-002-05, On 900316,seven Day Tech Spec Surveillance of Ice Condenser Intermediate Deck Doors Missed.Caused by Inappropriate Action Due to Failure to Adhere to Procedures. Personnel Will Read & Review Procedures +
- 05000333/LER-1990-009, :on 900319,reactor Scram Occurred.Caused by Oversight by Vendor in Assembly of Amplifier of Component of Strip Chart Recorder.Amplifiers for Pens Replaced +
- 05000458/LER-1990-008, :on 900315,main Turbine Generator Tripped, Resulting in Reactor Scram.Caused by Loss of Field Relay. Relay Reworked & Returned to Svc After Testing & Maint Procedures Revised +
- AECM-90-0062, Informs of 900320 Removal of Dewatering Well-8 from Svc to Determine Approx Rate of Groundwater Level Increase W/O Exceeding 109.0 Ft Mean Sea Level Design Basis +
- 05000369/LER-1990-003-03, :on 900316,Tech Spec Required Surveillance on Unit 1 Ventilation Unit Condensate Drain Tank Missed.Caused by Inappropriate Action Due to Failure to Follow Procedure. Personnel Will Evaluate Enhancing Procedures +
- IR 05000454/1990011 +
- JSP-276-90, Part 21 Rept 21-90-01 Re Deviations in Air Start Motor Parts Supplied by Stewart & Stevenson Svcs & POW-R-QUIK.Vendors Provided Inaccurate Info Re Changes to Parts +
- L-90-129, Forwards Rev 21 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 10CFR2.790(a)(3)) +
- RBG-32704, Forwards Corrected Tech Spec 3/4.2.1, Average Planar Linear Heat Generation Rate, to Support 900330 Application for Amend to License,Removing cycle-specific Parameter Limits from Tech Specs +
- LIC-90-0298, Special Rept:On 900207,past Inoperability of Wide Range Noble Gas Stack Monitor RM-063H for post-accident Caused by Equipment & Calibr Problems.Monitor Returned to Svc on 891213 +
- ML20012F515 +
- ML20034B029 +
- PNO-V-90-018, on 900414,plant Shut Down for More than 48 H. Caused by Drop of Control Element Assembly CEA-80 During Routine Surveillance Testing.Plant Will Remain in Mode 3 During Performance of post-trip Activities & Maint +
- SNRC-1713, Forwards Shoreham Nuclear Power Station Decommissioning Rept, in Support of Lilco Pending Request for Defueled Ol. Rept Includes Listed Documents,Including Settlement Agreement Between Lilco & State of Ny +