Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1986-73, Recent Emergency Diesel Generator Problems + (73)
- Information Notice 1992-73, Removal of a Fuel Element from a Research Reactor Core While Critical + (73)
- Information Notice 1991-73, Loss of Shutdown Cooling During Disassembly of High Pressure Safety Injection System Check Valve + (73)
- Information Notice 1989-73, Potential Overpressurization of Low Pressure Systems + (73)
- Information Notice 1985-73, Emergency Diesel Generator Control Circuit Logic Design Error + (73)
- Information Notice 1988-73, Direction-Dependent Leak Characteristics of Containment Purge Valves + (73)
- Information Notice 1990-73, Corrosion of Valve-To-Torque Tube Keys in Spray Pond Cross Connect Valves + (73)
- Information Notice 1993-73, Criminal Prosecution of Nuclear Suppliers for Wrongdoing + (73)
- Information Notice 1994-73, Clarification of Criticality Reporting Criteria + (73)
- Information Notice 1997-73, Fire Hazard in Use of a Leak Sealant + (73)
- Information Notice 1986-74, Reduction of Reactor Coolant Inventory Because of Misalignment of RHR Valves + (74)
- Information Notice 1992-74, Power Oscillations at Washington Nuclear Power Unit 2 + (74)
- Information Notice 1991-74, Changes in Pressurizer Safety Valve Setpoints Before Installation + (74)
- Information Notice 1989-74, Clarification of Transportation Requirements Applicable to Return of Spent Radiopharmacy Dosages from Users to Suppliers + (74)
- Information Notice 1985-74, Station Battery Problems + (74)
- Information Notice 1988-74, Potentially Inadequate Performance of ECCS in Pwrs During Recirculation Operation Following a LOCA + (74)
- Information Notice 1990-74, Information on Precursors to Severe Accidents + (74)
- Information Notice 1993-74, High Temperatures Reduce Limitorque AC Motor Operator Torque + (74)
- Information Notice 1994-74, Facility Management Responsibilities for Purchased or Contracted Services for Radiation Therapy Programs + (74)
- Information Notice 1997-74, Inadequate Oversight of Contractors During Sealant Injection Activities + (74)
- Information Notice 1988-74, Potentially Inadequate Performance of ECCS in PWRs During Recirculation Operation Following a LOCA + (74)
- Information Notice 1986-75, Incorrect Maintenance Procedure on Traversing Incore Probe Lines + (75)
- Information Notice 1992-75, Unplanned Intakes of Airborne Radioactive Material by Individuals at Nuclear Power Plants + (75)
- Information Notice 1989-75, Falsification of Welder Qualifications for Contractor Employees + (75)
- Information Notice 1985-75, Improperly Installed Instrumentation, Inadequate Quality Control and Inadequate Postmodification Testing + (75)
- Information Notice 1988-75, Disabling of Diesel Generator Output Circuit Breakers by Anti-Pump Circuitry + (75)
- Information Notice 1993-75, Spurious Tripping of Low-Voltage Power Circuit Breakers with GE RMS-9 Digital Trip Units + (75)
- Information Notice 1994-75, Minimum Temperature for Criticality + (75)
- Information Notice 1997-75, Enforcement Sanctions Issued As a Result of Deliberate Violations of NRC Requirements + (75)
- Information Notice 1997-75, Enforcement Sanctions Issued as a Result of Deliberate Violations of NRC Requirements + (75)
- Information Notice 1986-76, Problems Noted in Control Room Emergency Ventilation Systems + (76)
- Information Notice 1992-76, Issuance of Supplement 1 to NUREG-1358, Lessons Learned from Special Inspection Program for Emergency Operating Procedures (Conducted 10/1988 - 09/1991) + (76)
- Information Notice 1991-76, 10 CFR Parts 21 & 50.55(e) Final Rules + (76)
- Information Notice 1989-76, Biofouling Agent: Zebra Mussel + (76)
- Information Notice 1985-76, Recent Water Hammer Events + (76)
- Information Notice 1988-76, Recent Discovery of a Phenomenon Not Previously Considered in Design of Secondary Containment Pressure Control + (76)
- Information Notice 1990-76, Failure of Turbine Overspeed Trip Mechanism Because of Inadequate Spring Tension + (76)
- Information Notice 1993-76, Inadequate Control of Paint and Cleaners for Safety-Related Equipment + (76)
- Information Notice 1994-76, Recent Failures of Charging/Safety Injection Pump Shafts + (76)
- Information Notice 1997-76, Degraded Throttle Valves in Emergency Core Cooling System Resulting from Cavitation-Induced Erosion During a Loss-of-Coolant Accident + (76)
- Information Notice 1986-77, Computer Program Error Report Handling + (77)
- Information Notice 1992-77, Questionable Selection and Review to Determine Suitablility of Electropneumatic Relays for Certain Applications + (77)
- Information Notice 1991-77, Shift Staffing at Nuclear Power Plants + (77)
- Information Notice 1989-77, Debris in Containment Emergency Sumps and Incorrect Screen Configurations + (77)
- Information Notice 1985-77, Possible Loss Emergency Notification System Due to Loss of AC Power + (77)
- Information Notice 1988-77, Inadvertent Reactor Vessel Overfill + (77)
- Information Notice 1990-77, Inadvertent Revoval of Fuel Assemblies from the Reactor Core + (77)
- Information Notice 1993-77, Human Errors That Result in Inadvertent Transfers of Special Nuclear Material at Fuel Cycle Facilities + (77)
- Information Notice 1994-77, Malfunction in Main Generator Voltage Regulator Causing Overvoltage at Safety-Related Electrical Equipment + (77)
- Information Notice 1997-77, Exemption from the Requirements of Section 70.24 of Title 10 of the Code of Federal Regulations + (77)
- Information Notice 1986-78, Scram Solenoid Pilot Valve (SSPV) Rebuild Kit Problems + (78)
- Information Notice 1992-78, Piston to Cylinder Liner Tin Smearing on Cooper-Bessemer Ksv Diesel Engines + (78)
- Information Notice 1989-78, Failure of Packing Nuts on One-Inch Uranium Hexafluoride Cylinder Valves + (78)
- Information Notice 1985-78, Event Notification + (78)
- Information Notice 1988-78, Implementation of Revised NRC-Administered Requalification Examinations + (78)
- Information Notice 1990-78, Previously Unidentified Release Path From Boiling Water Reactor Control Rod Hydraulic Units + (78)
- Information Notice 1993-78, Inoperable Safety Systems at a Non-Power Reactor + (78)
- Information Notice 1997-78, Crediting of Operator Actions in Place of Automatic Actions & Modifications of Operator Actions, Including Response Times + (78)
- Information Notice 1990-78, Previously Unidentified Release Path from Boiling Water Reactor Control Rod Hydraulic Units + (78)
- Information Notice 1991-79, Deficiencies Found in Thermo-Lag Fire Barrier Installation + (79)