Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 49296 +
- ML16298A088 +
- ML083380802 +
- ML20005G555 +
- ML19309H880 +
- ML052860133 +
- 05000352/LER-1989-058, :on 891123,actuation of Group III Primary Containment & Reactor Vessel Isolation Control Sys Resulted in Automatic Isolation of Rwcu.Caused by Failure of Flow Summer Card.Card Replaced +
- ML043380147 +
- ML031010480 +
- ML030070692 +
- ML021980041 +
- ML021020045 +
- ML20085F678 +
- ML20084E567 +
- ML20081M725 +
- ML20098G328 +
- ML20107F654 +
- ML20106C654 +
- ML20115F047 +
- ML20097B040 +
- ML20077J395 +
- ML20137V288 +
- ML20137S997 +
- ML20138H196 +
- ML20128G030 +
- ML20135E964 +
- ML20197J477 +
- ML20066H255 +
- ML20245B683 +
- ML20217P355 +
- U-602500, Forwards Rev 6 to CPS USAR & 10CFR50.59 Rept Identifying SEs for Implemented Changes Affecting USAR for Period of 931210- 950429 +
- BSEP-93-0178, Responds to NRC Re Violations Noted in Insp Repts 50-324/93-33 & 50-325/93-33.C/As:licensee Will Be Requiring Individuals to Certify Whether They Have Been Subject to Continual Behavioral Observation (Cbo) Program +
- 05000414/LER-2021-002, Valid Actuation of the Unit 2 Reactor Protection System and Auxiliary Feedwater System +
- 05000293/LER-1989-019, :on 890609,RCIC Sys Made Inoperable Per Tech Specs Due to Inoperable Area Temp Switch.Caused by 890514 Surveillance Procedure Signed as Completed W/Unsatisfactory Results.Terminal Block Replaced +
- 05000461/LER-1989-029, :on 890714,manual Scram Initiated in Anticipation of Automatic Scram Due to Decrease in Main Condenser Vacuum.Caused by Mechanical Failure in Rubber Expansion Joint.Joint Replaced +
- 05000412/LER-1987-031, :on 871020,leaks Discovered Through Clamp on RCS Loop a Cold Leg Bypass Isolation Valves 2RCS*44,2RCS*37 & 2RCS*46 in Excess of Tech Spec Limits.Cause Undetermined. Valves Repaired or Replaced +
- 05000413/LER-1986-005, :on 860117,both Trains of Control Ventilation/ Chilled Water Sys Inoperable at 100% Power.Caused by Misapplied Pump Seals,Unreliable Compression Tank Alarm & Unreliable Makeup Source +
- 05000387/LER-1986-029, :on 860816,initiations of Standby Gas Treatment & Control Room Emergency Outside Air Supply Sys B Occurred.Caused by Defective GE Electrical Protection Assembly Board (Epa).Board Replaced +
- 05000265/LER-1987-002-11, :on 870122,RCIC Turbine Outboard Bearing Flooded W/Oil & Turbine Inboard Oil Level Was Too Low.Caused by Mod Design Deficiency.Defective Bearing Replaced & Maint Procedure Will Be Developed +
- 05000413/LER-1988-003, :on 880116,wide Range Temp Monitoring Instrumentation Technically Inoperable.Caused by Installation Deficiency.Affected Unit 1 Resistance Temp Detector/Cables Replaced +
- 05000414/LER-1988-017-01, :on 880424,main Feedwater Isolation Occurred Due to hi-hi Level Turbine Trip Signal from Steam Generator. Caused by Personnel Error.Steam Generator Levels Brought Under Control Using Auxiliary Feedwater +
- 05000265/LER-1988-002-01, :on 870122,RCIC Isolated & Declared Inoperable Due to Oil Flooding Outboard Bearing.Caused by Mod Design Deficiency Installed During Refuel Outage.Bearing Replaced & Oil Orifice Cleaned & Reinstalled +
- 05000267/LER-1985-027, :on 851204,Loop I Shutdown Initiated by Plant Protective Sys Due to Helium Circulator Trip Caused by Loss of Bearing Water Pump.Caused by Operator Error.Pump Reclosed Automatically.Operator Counseled +
- 05000413/LER-1996-003-01, :on 960508,Control Rod Bank a Group 1 Failed to Withdraw from Inserted Test Position of 219 Steps.Caused by Failed Firing Card.Unit Shutdown to Mode 3 & Failed Firing Card Replaced W/Spare Firing Card +
- 05000280/LER-1984-027, :on 841218,during Surveillance Testing of Emergency Diesel Generator 3,fire Occurred in Vicinity of Turbocharger.Caused by Leaking Fitting on Fuel Injector Line Which Allowed Fuel Oil to Leak Into Lube Oil +
- 05000397/LER-1984-078, :on 840801,07 & 08,control Room Emergency Filtration Units Automatically Actuated.Caused by Spikes on Corresponding Control Room Outside Air Radiation Monitors. Filtration Units & Radiation Monitors Reset +
- 05000374/LER-1991-013-01, :on 911007,loss of Auxiliary Electric Equipment Room Ventilation Supply Due to Overheating of Starting Coil for Breaker.Cause Not Found.Work Request Initiated for Electrical Maintenance Dept to Investigate +
- 05000395/LER-1983-111-03, /03L-0:on 830911,while in Mode 1,reactor Trip Occurred Following Power Interruption on 115 Kv Offsite Power Source.Cause of Trip from Transient to Onsite Power Source Under Investigation +
- 05000382/LER-1991-016, :on 910720,identified Inaccurate Data from Auxiliary Protection Cabinet Multiplexer to Plant Monitoring Computer.Caused by Inability of Plant Monitoring Computer to Identify non-updated Data +
- 05000254/LER-1991-001-02, :on 910105,several Fuses Pulled,Causing Group II Isolation.On 910110,movement of Chaffed Wire Created Electrical Short & Caused Blown Fuse.Caused by Personnel Error & Equipment Failure +