Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
_ - - - _ _ _ _ _ _ _ _ _ _ - _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ - _-_-____ _ _-__- -__ _ _ - ______ ---______ _-_____ _
. 'e,e
%Y V) sw ,
M Teiesion. 9 m m ago gfe;me t
>.,.. .,,a ,, , w ,, aa February 8,1993 Beaver Valloy INucr Station Unit 1 - Docket llo. 50-334, License 110. DIH-66 Unit 2 - Docket flo. 50-412, Licenso llo. IIPF-73 Monthly Operatim Rerort U. S. Iluclear Regulatory Carmticsion Document Control Desk Wanhington, D.C. 20555 Gentlement In accordance with App ndix A, Technical Specifications, the Monthly operating Report is cuhnitted for Unit 1 and Unit 2 for the month of January, 1993.
Respectfully, D. E. Spocrry Division Vice President 11uclear Operations UTJ/mng Enclocures cc: imC Regional Offim King of Prussia, PA l
i 9302120123 930131 4 j
- _l DR ADOCK 0300
. IUJUaTIVE SWARY OF HCam!LY OPDMTI!C D(PDUDiCE tRTIT 1 JNUJ1Y 1993 January 1 1ho Unit operattd at approximtely 90% output in accordance through with the planned fuel cyclo length extension durirg the entiro January 31 report period.
. l AVDV4E MILY U(IT TOilR 11 VEL .
DOOTT 10. _50-334 QilT BVPS Unit 1 MTE Teb. 4, 1993 .
CEMPLL'IT:D BY David T. Jones TELEPilCliE (412) 393-7607 110tTIll January 1993 '
DAY AVER /CE MILY TOfER LLVEL DAY AVER 14E MILY IOYER LEVEL (144c-liet) (1540-liet) 1 746 17 742 2 738 18 232 3 742 19 721 4 733 20 742 5 729 21 721 6 733 22 743 7 733 23 742 8 738 24 738 9 733 25 746 10 737 26 __- 742 11 733 27 738 12 742 28 738 13 729 29 742 14 .
738 30 738 15 742 31 733 16 725 INSTRUCTIONS on this formt, list the average daily unit per level 149e-!!et for each day in the reportirg renth. Canpute to the nearest whole mogawatt.
OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 02/03/93 COMPLETED BY: DAVID T. JONES ,
TELEPil0NE: (412) 393 7607 I l
OPERATING STATUS I
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JANUARY 1993 l
- 3. LICENSED THERMAL POWER (MWt): 2652 '
- 4. HAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MVo): 835 1
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net MVe): 810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO VHICll RESTRICTED. IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE 11,110URS IN REPORTING PERIOD: 744.0 744.0 146880.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 744,0 744.0 94294.3
- 13. RF. ACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
- 14. Il0URS GENERATOR VAS ON LINE: 744.0 744.0 92394.8
- 15. UNIT RESERVE SIIU1DOWN 110URS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVil) : 1769550,0 1769550.0 220744551.5
- 17. GROSS ELECT. ENERGY GEN. (MVil): 583680.0 583680.0 71078173.0
- 18. NET ELECTRICAL ENERGY GEN. (MVH): 548190.0 548190.0 66414130.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 64.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 64.9
- 21. UNIT CAPACITY FACTOR (MDC): PCT 91.0 91.0 58.5 22, UNIT CAPACITY FACTOR (DER): PCT 88.2 88.2 56.7
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0,0 15.8 24 SilUTDOWNS SCllEDULED OVER NEXT SIX MONTHS (TYPE.DATE, AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS NINTH REFUELING OUTAGE ON MARCH 26. 1993dHE REFUELING OUTAGE IS SCHEDULED TO 1AST FOR 70 DAYS.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A C0KMERCIAL OPERATION' N/A N/A
UttT SMUTDOWWS AND PCWER REDUCTIOks (220%) Docket No. 334
~
Date Fetwuary 3.1993 4
Completed 8y David T. Jees o
}. REPORT MosTM JAPUARY 1993 Telephone 1672) 393-7607 d.
4- 1 Method of Licensee Cause & Corrective '
., Duration Shutting Event System Ccepponent Action to j a
No. Date Typel (Hours) Reason 2 Down Reactor 3 Report # Codes Code 5 Prevent Rec-errence J .. {
nonE I
, i f
}
- t i
i I
]
4 I
'1 2- 3 ,
F-Forced Reason:- Method:
S-Scheduled Exhibit F-Instructions for A-Equipment Failure (Emplain)' 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual Scra= for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (muREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam. 5-Reduction 5 '
F-Administrative 9-Other Eshibit N-Same Source.
G-operar6 mal Error (Emptain) ,
W-Other (Explain). '
}
t 1
4
, .g. , , - . , y - , - -
v y--- p .-g ge.. w- , - , , , , ~ . - - , .,- . + _ - - -
NARRATIVE SLM9RY OF MCtfIHLY OPERATDIG D:PERIDICE INIT 2 JANUARY 1993 January 1 he Unit cor.tinued to operate at a reduced output of throegh approximately 48% in accordance with the planned fuel cycle January ' length extension.
January 4 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> the Unit -ecsi a power increase to 100%
output. A nominal value of 100% output was achieved at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />.
January 5 h e Unit operated at a nominal value of 100% output.
January 6 At 0951 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.618555e-4 months <br /> the Unit commenced a reduction in output to approximately 89% to remove the "B" Separator Drain Receiver Drain Pump from service for repacking cf the pump. An.
output of approximately 89% was achieved at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />.
January 7 he Unit continued to operate at approximately 89% output throucA while repacking of the "B" Separttor Drain Receiver Drain-January 8 Pump continued.
January 9 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the . Unit acatracreed a power . increase to 100% -
output follwing ocrapletion of repairs to the "5" Separator Crain Receiver Drain Punp.
January 10 A ncaninal ?lue of 100% output was achieved at 0005 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
January 11 he Mit crerated at a nminal value of 100% output, through Janu m/ 21 January 22 At 2126 hours0.0246 days <br />0.591 hours <br />0.00352 weeks <br />8.08943e-4 months <br /> the Unit cerrenced u vtduction in output to approxinsely 45% in accordanc9 with ths 31annext fuel c/cle length extension.
January 23 he Unit continued to operate at app h.tely 45% output in-accordance with the planned fuel cycle le:qth extension.
January 24 At 0825 hour0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br />s- the Unit began to' increase power to'100%
output. At 1152 nours the pwer increase was placed on hold -
at approximately- 88% output to investigate a problem'with the "B" Separator Drain Receiver Drain Pump.
January 25 he Unit continued to operate at approxinately 88% output through_ while r'; airs to the "B" Separator Drain Receiver Drain Pump January 26 continued.
_ . _, ._ .. . _ . . . ~ _ _ _ - _. .._ -- -- . ~ . .--- _ _. _
y
,e , _,
-,, NARRATIVE SLMRRY:OF-: ,
i 20NIELY' OPERATING EXPERIDKE LNIT 2 JANUARY _1993 (continued)
January 27 Power output was slowly inczmad fran approxhnately 88% to '
approximately_ 92% :while_ repairs to the_."B" Separator Drain.
Receiver Drain Punp ccotinued. -
January 28 'Ibe Unit continued to operate at approximately 92% output !
through while repairs to the "B" Separator Drain Receiver' Drain Pung -
4 January 29 continued.- q.
January 30 At 0124 hours0.00144 days <br />0.0344 hours <br />2.050265e-4 weeks <br />4.7182e-5 months <br /> the reactor autanatically tripped' and a_ safety, injection occurred when two out of three low sta=1ine pressure signals were received in the '"A" loop.' . ' This occurred when the Channel III low pressure ccmparator card failed while the Channel II. bistables were tripped during a .
channel surveillance test and transmitter replacement. ~ '
, Jarnary 31 'Ibe Unit entered Mode 2' at 0755 hours0.00874 days <br />0.21 hours <br />0.00125 weeks <br />2.872775e-4 months <br />. 2he reactor was-taken critical at 0928 hours0.0107 days <br />0.258 hours <br />0.00153 weeks <br />3.53104e-4 months <br /> and' Mode _1 was entered =at:1055 ,
hours, :'Ihe Unit was syndtronized to the electrical grid andi the: Main Unit Generator output breakers were. closed at 1651 ;
, hours. '7he Unit began to increase power towards an output _ ~
r of appruximately 92% -for continued repairs -to:-the-S"B" Separator Drain- Reveiver Drain Punp. 'Ibe Unit was at an ou'put of approximately 30% at the end of the: report period.-
w
' T i
i l , --
l l'
i-
. . y
- k , ,
_ . - .. - , , ,v-4 , , , , - - . v -
t: .
AVERAGE DAILY INIT TO4ER LEVEL DOCKEI' NO. 50-412 UNIT BVPS tilit 2 =
DATE Feb.- 2, 1993 CI24PLEIID BY Dwid T. Jones TELEPHONE (412) 393-7607 1DTIH January 1993 DAY AVERAGE DAILY F0WER LEVEL DAY AVERAGE DAILY IOGR LEVEL (Mie-Net) (M4e-Net) 1 372 . 17 833 2 371 18 837 3 366 19 836 4 733 20 834 5 829 21 830 6 792 22 820 <
7 757 _ 23 359 8 749 24 570 9 -758 25 738 10 834 26 _ 745 11 836 27 770 12 833 28 777-13 829 29 783 14 836 30 '19 15 835 31 23 16 834 Z
INSIEUC.TIONS On this fanat, list the average daily unit power level'Mie-Net for each day'in -
the reporting month. Compute to the nearest whola megawatt.
. 1 OPERATING DATA REPORT 1
DOCKET No.: 50 412 REPORT DATE: 02/03/93 COMPLETED BY: DAVID T. JONES i TELEPHONE: (412) 393-7607 l
OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY TOWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JANUARY 1993 1
- 3. LICENSED THERMAL POWER (MWt): 2652 .)
- 4. NAMEPLATE RATING (Gross MWe): 923 i
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836 l
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870 -
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820 -
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD: 744.0 744.0 45663.0
- 12. No. OF HRS. REACTOR WAS CRITICAL: 711.9 711.9 39213.1
- 13. REACTOR RESERVF SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATC JAS ON LINE: 704,6 704,6 38929.9
- 15. UNIT RESERVE M.JTDOWN HOURS: 0.0 0.0 0'. 0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 1635667.0 1635667,0 95182308.4 17, GROSS ELECT. ENERGY GEN. (MWH). 542713.0 542713.0 30686517.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): '512205.0 512205.0 -28962012.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 94.7 94.7 85.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 94.7 94.7 85.3 21 UNIT CAPACITY FACTOR (MDC): PCT 84.0 84.0 76.7
- 22. UNIT CAPACITY FACTOR (DER): PCT 82.4 82.4 75.9
- 23. UNIT FORCED OUTAGE RA"E: (PERCENT) 5.3 5.3 3.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A-INITIAL ELECTRICITY N/A __ N/A COMMERCIAL OPERATION N/A N/A
e a
UNIT SHOTDOWNS AND POWE9 RtDUCTIchs (120%) Docket me. 50-4??
Unit Name BVPS Unit #2 Date February 4 1993 -
Completed By David t. Jones REPORT MONTH JANUA8Y 1993 Telephone t412) 303-7607 Method of Licensee Cause & Corrective Shutting Event System Component Action to Duration Down Reactor 3 Report # Code 4 Code 5 erevent Recurrenes No. Date TypeT (Hours) Reason 2 ,
w
! The Unit continued to operate et a 1 930101 S C n 4 m/A ZZ ZZZZZ2 l
reduced cutput of approximately 48%
' in accordance with the planned fuel l cycle tength extension.
5 N/A ZZ ZZZZZZ The Unit reduced output free 100%
2 930122 S 0 M to approximately 45% in accordance with the planned fuel cycle tength entension.
3 93-002-00 IA INSTRU The Unit automaticatty tripped and 3 930130 F 39.4 A a safety injection occurred when 2/3 tow steemtine pressure signats I
were received in the "A" toop.
This occurred when the Chrinet III tow pressure comparator card feited white the Channel 11 bistables were t r i pped duri ng a ch anne t turveitiance test and transmitter l
r ept oc ement .
i l
3 4 i i 2 '
F-Forced Reason: Me th od: Exhibit F-Instructions for A-Equipaent Failure (Explain) 1-Manual Preparation of Data Entry Sheets S-Schecuted for Licensee Event Report (tER) file B-Maintenance or fest 2-Manual Scram C-Refueting 3-Automatic Scram (nUREG0161).
D-Regulatory Restriction 4-Cont'd. frce Previous Month E-operator Training & License Exam 5-Reduction 5 8-Administrative 9-Other Exhibit M-Saee Source.
G-Operational Error (Explain)
N-Other (Explain)
I
_ _ _ - -