ML20137V288
ML20137V288 | |
Person / Time | |
---|---|
Site: | 05000083 |
Issue date: | 11/27/1985 |
From: | Vernetson W FLORIDA, UNIV. OF, GAINESVILLE, FL |
To: | Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8512090514 | |
Download: ML20137V288 (1) | |
Text
,
'""5 * " * = " a ' NUCLEAR FACILITIES DIYlSION t.G. VERNET 50N,REACTORtsAhAGER' l
NUCLEAR REACTOR BUILDING UNIVERSOY OF FLORD\ . .
GAlhESVILLE, FLORIDA 3M!! . .
'eret PN08eE (904) M2-1429 TELE 4 56330 November 27, 1985 Chief, Operator Licensing Branch Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 20555 Re: FACILITY LICENSE R-56 DOCKET NO. 50-83
Dear Sir:
Enclosed is one copy of the 1984-1985 University of Florida Training Reactor Annual Progress Report for your information and disposition.
Please advise if further information is required.
Sincerely, 4t .
William G. Vernetson Acting Director of Nuclear Facilities i
WGV/ps Enclosure cc: P.M. Whaley Acting Reactor Manager f
f I
f k
i 1
8512090514 851127 l l g PDR ADOCK 05000083 R PDR l
l touet orvoaf0NITY/AFFIR484tivt ACTION f tEPLOYEa
g Contract # DE-AC05-76ER04014 Report # ORO-4014-15 I
I ANNUAL PROGRESS REPORT OF THE UNIVERSITY OF FLORIDA TRAINING REACTOR g
l September 1,1984 - August 31, 1985 By g
Dr. William G. Vernetson l Associate Engineer and Acting Director of Nuclear Facilities l
l Y ;
g-.
I I NUCLE /A FACILITIES DIVISION I
DEPARTMENT OF NUCLEAR ENGINEERING SCIENCES
-l g College of Engineering gA University of Florida
$$ Gainesville I
'I . . . .
Contract #DE-AC05-76ER04014 Report #0RO--4014-15 ANNUAL PROGRESS REPORT OF THE UNIVERSITY OF FLORIDA TRAINING REACTOR September 1, 1984 - August 31, 1985 Submitted to the Department of Energy Nuclear Regulatory Commission and University of Florida By Dr. William G. Vernetson Associate Engineer and Acting Director cf Nuclear Facilities I
Department of Nuclear Engineering Sciences College of Engineering University of Florida I Gainesville, Florida November, 1985
_ _ _ . _ _ _ _ _ - _ _ ~ -
I TABLE OF CONTENTS Page Number I. INTRODUCTION 1 II. UNIVERSITY OF FLORIDA PERSONNEL ASSOCIATED WITil ;
THE REACTOR 8 {
l FACILITY OPERATION
~
III. 11 IV. MODIFICATIONS TO THE OPERATING Cl{ARACTERISTICS OR CAPABILITIES OF THE UFTR FACILITY 34 I V. SIGNIFICANT MAINTENANCE, TESTS AND SURVELLIANCES OF UFTR REACTOR SYSTEMS AND FACILITIES 40 I VI. CHANGES TO TECHNICAL SPECIFICATIONS, STANDARD OPERATING PROCEDURES AND OTHER DOCUMENTS 48 VII. RADIOACTIVE RELEASES AND ENVIRONMENTAL SURVEILLANCE 55 VIII. EDUCATION, RESEARCH AND TRAINING UTILIZATION 60 I IX. THESES, PUBLICATIONS, REPORTS AND ORAL PRESENTATIONS OF WORK RELATED TO THE USE AND OPERATION OF THE UFTR 68 I APPENDIX A: UFTR FACILITY LICENSEE RESPONSE TO NRC INSPECTION REPORT NUMBER 50-83/85-01 APPENDIX B: FINAL
SUMMARY
REPORT TO NRC ON STICKING S-3 CONTROL BLADE PROBLEM: NOTIFICATIONS, CORRECTIVE ACTION, PREVENTIVE MAIN-TENANCE, TESTS AND SURVELLIANCES APPENDIX C: UPTR STANDRARD OPERATING PROCEDURES:
- 1. UFTR SOP-C.1 " ASSEMBLY AND DISASSEMBLY OF IRRADIATED FUEL ELEMENTS"
- 2. UFTR SOP-0.4 "10 CPR 50.59 EVALUATION AND DETERMINATION"
- 3. UPTR SOP-E.7 " MEASUREMENT OF TEMPERATURE COEFFICIENT OF REACTIVITY" I APPENDIX D: UFTR OPERATOR REQUALIFICATION AND RECERTIFI-CATION PROGRAM PLAN (JULY 1985 THROUGil JUNE 1987)
I '
I
I. INTRODUCTION The University of Florida Training Reactor's overall utilization for the past reporting year has maintained the increase noted in the 1983-1984 report-ing year as compared to previous years, continuing to exceed the levels of utilization characteristic of the early 1970's in some areas such as energy generation. The total energy generation (Kw-Hr) for this reporting year has decreased somewhat but is still at the third hig'1est level ever and represents an increase of nearly 300% over the 1982-1983 reporting year which itself had an increase of 50% c,ver the 1981-1982 reporting year. The maintenance of a high level of utilization during this reporting year is all the more notewor-thy when several large forced outages are noted. First, all core outlet line thermocouples were replaced following failure of one thermocouple on September 25, 1984. This outage lasted for 14 days. The second major outage during the year followed the discovery on January 18, 1985 of a sticking control blade (Safety Blade #3) and its failure to drop and fully insert upon demand from the operating position. The maintenance and repair work associated with this failure involved a complete overhaul of all four (4) control blade drive sys-te.ns external to the biological shield. The reactor was returned to operating status en March 7 following 39 days of unavailability. Despite these two major outages, each of which exceeded the total forced outages for any of the five previous reporting years, the UFTR was able to maintain previous high levels of usage in most areas without compromising safe operation of the facility.
An analysis of the facility utilization shows that the maintained usage and energy generation relative to the previous year is attributable to the same supporting conditions as last year. First, this reporting year is the second full year with complete installation of the new rabbit system and im-plementation of the associated Neutron Activation Analysis Laboratory (NAAL) l ,
giving the staff the capability to promote it among University of Florida users and among researchers at other universities and colleges around the State of Florida. As its availability becomes better advertised, its usage I continues to increase.
Second, this reporting year was only the second ever in which the Univer -
sity of Florida Training Reactor was supported as part of the Department of Energy's Reactor Sharing Program. This reactor sharing program is designed to increase the availability of University reactor facilities such as the UPTR to non-reactor owning colleges and universities (user institutions). Basically this grant provides funds against which reactor operating costs may be charged when the facilities are utilized by regionally affiliated user institutions for student instruction / training or for student or faculty research that is not supported by outside funding. In all, seven different academic institu-tions around the State of Florida made use of this program to utilize the UFTR for research, primarily via neutron activation analysis to determine trace element compositions, and for reactor facility demonstrations of various as-pects of operation and training of students in various community college pro-grams such as nuclear medicine technology and radiation protection technology.
At years end, several unsupported research projects were still awaiting avail-ability of the UFTR under the Reactor Sharing Program as UPTR usago attribut-able to this DOE-sponsored program continues to grow. Despite considerable cost-sharing by the University of Florida, all of the reactor sharing funds allocated by the Department of Energy for this supporting year were fully utilized. For this reason, an increase in Reactor Sharing Support is hoped for in the upcoming year.
Reactor use by University of Florida courses and laboratories continues at the substantial level established in the previous two years.. Course and De-partment usages within the University range from the Environmental Engineering 2
Sciences Department in its graduate Health Physics laboratory to the Chemistry Department in a graduate level radiochemistry laboratory courses. Of course, the biggest single user department remains the Nuclear Engineering Sciences Department which uses the reactor facility for both graduate and undergraduate laboratories, research projects and class demonstrations. -
The considerable test, maintenance and surveillance activities required by the facility license Technical Specifications or other controls also con-l tributed significantly to usage. This contribution is larger than in most 1
years because of several large maintenance and surveillance projects.
{
Finally, the acquisition of one three-week and one abbreviated three-day training program conducted for Florida Power Corporation (FPC) has rounded out significant contributions to facility utilization and total energy generation.
Indications are that FPC is pleased with the UFTR staff and facilities and will continue petiodic utilization of the facilities for training its opera-tions staff.
With one training program already scheduled along with continued avail-ability of the NAA laboratory and the remote sample-handling " rabbit" system plus renewal of the Reactor Sharing Program support, facility utilization and energy generation for the upcoming year should be maintained and possibly even considerably augmented. The latter augmentaticn is particularly possible be-cause the UFTR utilizaton under the DOE Reactor Sharing Program has spread publicity on the availability of the UFTR so that a number of investigators on the University of Florida campus and elsewhere around the state have indicated an interest in using the reactor facility and the functional " rabbit" system during the upcoming year. Several other state wida " crs as an outgrowth of the DOE Reactor Sharing Program support, are .tn the process of preparing addi-tional proposals hopefully to provide funded usage of the UFTR within the next two years. All of this provides reasonable expectation of continued growth of 3
l
reactor facility usge dependent on a continued upgrading of facility capabili-ties and staff expertise.
I As noted in the 1983-1984 report, the facility administration' ras consid-erably stabilized by appointment of a fully vested Reactor Manager during that year. In combination with the return of the Director of Facilities, thase con-ditions were all contributing to the considerable broad-based increases in fa-cility usage for education and training of university students and utility op-erators as well as research by faculty at the University of Florida and other schools. The decision of some staff personnel to go on part-time employment at the end of the previous reporting year plus the facility director continuing to be on leave for the entire current reporting year has necessitated limita-tions in the growth of some usage programs since no full-time replacement per-I sonnel have yet been put in place. It is hoped that these limitations will be removed during the upcoming reporting year.
Several significant license-related administrative activities occurred during this reporting year. First, the completely revised and rewritten UPTR Emergency Plan following the guidelines of ANSI /ANS 15.16-1982 was submitted I to NRC for final approval during the previous reporting year on October 14, 1983. Final approval of this Emergency Plan was received from NRC in a letter dated June 4,1984 with a requirement for notification of full implementation of t!'e Plan within 120 days *. Revision 1 updating and clarifying several pages of the Emergency Plan was submitted to the NRC in a letter dated June 25, I 1984 Subsequently, during the current reporting year dated September 25, 1984, the NRC was notifie3 that September 21, 1984, the day on which complete ,
a implementation of the UFTR Emergency Plan is considered to have occurred.
I Secora, as noted previously, the Director of Facilities has exercised his Official notification of full implementation of the Plan was then trans-mitted to the NRC in a letter dated September 25, 1984.
4
I option to continue his leave of absence for the upcoming year. However, the fully qualified Reactor Manager has been designated to act in his place while a fully qualified SRO has been designated as the Acting Reactor Manager. This administrative arrangement meets all regulatory requirements and has enabled the facility to meet all regulatory commitments while continuing to meet fa-cility usage commitments. Third, a revised UFTR Operator Requalification and Recertification Program Plan was submitted in February,1985 and has been ap- l proved for repetitive utilization at two year intervals in a letter received on July 18, 1985.
Finally, several major maintenance and surveillance efforts were under-taken during the year. The three major efforts involved over 50 days of ad-ministrative shutdown during the reporting year. The first major maintenance involved replacement of all primary coolant fuel box outlet thermocouples and thermocouple connections following failure of the thermocouple system on fuel box #4. This work necessitated an extended 14 day administrative shutdown.
Similarly, the biennial fuel inspection of two fuel bundles in January neces-sitated another extended period of forced low power operation of three weeks I primarily to allow cooling of the core. Finally, the failure of control blade safety #3 to drop from its normal operating position on demand involved over five weeks of administrative shutdown. During this time S-3 was restored to normal operation and preventive maintenance was performed on all four control blade drives to include all mechanisms external to the biological shielding.
Although this maintenance was forced by the failure of a blade to drop, the work performed is all part of a required 5 year mechanical inspection of the reactor control blade system. Therefore, the work would have been performed in the next several years anyway. In general, the level of maintenance activity was much higher during this reporting year but it is expected that the efforts dedicated to maintenance should involve increased availablity in the next few l
E 5
I years.*
The UFTR continues to operate with an outstanding safety record and in full compliance with regulatory requirements. An NRC Security Inspection dur-ing the year resulted in only minor recommendations on clarifying an emergency response procedure and general security plan implementation. All recommenda-tions have been fully implemented. An additional NRC Operations inspection during the year resulted in two deficiencies relative to lack of proper docu-mentation of facility modifications and proper implementation of a quality as-surance program as per ANSI Standard ANSI N402-1976, " Quality Assurance Pro-gram Requirements for Research Reactors." In the first case, the modification documentation was assembled and reviewed as per NRC commitment. For the second deficiency a commitment was made to NRC to develop a set of procedures to ad-dress quality assurance program requirements for Research Reactors as de-lineated in guidelines in ANSI N402-1976. In addition, there was a minor item noted that annual facility audits must be sent directly to the Dean of the College of Engineering, and not just to the Associate Dean for Research as has been done in the past. In general, none of these NRC findings involved any actual safety problems but rather involved a lack of supportin7 documenting procedures or other paperwork. Indeed, the modifications cited for lack of re-view was reviewed during the relicensing of the UPTR facility completed in 1982. As indicated, the UPTR continues to operate with an outstanding safety record. Similarly two inspections by representatives of the American Nuclear Insurers resulted in only one minor recommendation relative to frequency of inspections of the newly installed fire alarm system to assure compliance with federal regulations and assure protection of the facility and associated per-
- Unexpectedly, the discovery of the reoccurrence of the sticking S-3 con-trol blade on September 3, 1985 has necessitated a continuing administra-tive shutdown through the first three months of the next reporting year as every effort is being made to preclude this occurrence from happening ll5 l again.
6
sonnel.
The reactor and associated facilities continue to maintain a high in-I state visibility and strong industry relationships. With the DOE Reactor Shar-ing Program to support UFTR-related research by faculty and students at other academic institutions as well as training for various community college und university programs around the state, the reactor facility is also maintaining high in-state visibility with these other institutions of higher learning.
With the renewed statewide usage, the facility is beginning to be in-cluded in proposals to provide for funded usage of the UFTR and the NAA Labor-atory. The Peactor Sharing Program began in late 1983 and is directly respon-sible for the generation of several of these tentative proposals. If one or more of these proposals is submitted and funded, further increases in UPTR usage can be expected. In any case on-campus research usage of the UFTR is also increasing because of the visibility generated via the Reactor Sharing Program.
It is expected that more direct industry training will be accomplished in the upcoming year hopefully accompanied by further increases in research pri-marily through the use of the rabbit system and the associated NAAL facility both under the DOE Reactor Sharing Program and hopefully from research funded from other agencies, some of which has been developed from research begun un-der the Reactor Sharing Program.
l l
I >
II. UNIVERSITY OF FLORIDA PERSONNEL ASSOCIATED WITH THE REACTOR A. Personnel Employed by the UFTR N.J. Diaz - Professor and Director of Nuclear Facilities (continued on leave of absence)
W.G. Vernetson - Assistant Engineer and Acting Director of Nuclear Fa- -
cilities (September,1984 - July,1986) promoted to Associate Engineer in August, 1985.
P.M. Whaley - Acting Reactor Manager (3/4 time) (September, 1984 -
August, 1985)
H. Gogun - Senior Reactor Operator (part-time) (September, 1984 -
August, 1985)
G. Fogle - Reactor Operator (part-time) (September, 1984 -
August, 1985)
C.J. Stiehl - Student Reactor Operator Trainee (1/2 time)
W.M. Cason - Student Reactor Operator Trainee (1/3 time) (February
- August, 1985)
B. Radiation Control Office D. Munroe - Radiation Control Officer (September, 1984 - August, 1985)
H.G. Norton - Assistant Radiation Control Officer (September,1984 -
August, 1985)
G.R. Renshaw - Radiation Control Technician (September,1984 -
August, 1985)
D.E. Perkins - Radiation Control Technician (September,1984 -
August, 1985)
B.M. DesRoches - Nuclear Technician (1/2 time) (September,1984 -
August, 1985)
I R. Fayko - Nuclear Technician (1/3 time) (September,1984 -
December, 1985) l l
- 11 8
C. Reactor Safety Review Subcommittee M.J. Chanian - Chairman and Associate Dean for Research, College of Engineering W.G. Vernetson - Member (Reactor Manager and Acting Director of I J.A. Wethington, Jr.I Nuclear Facilities)
- Member (NE3 Department Chairman) and G.S. Roessler W.E. Bolch - Member-at-large D. Munroe - Member (Radiation Control Officer)
D. Line Responsibility for UFTR Administration M.M. Criser, Jr.2 - President, University of Florida W.H. Chen - Dean, College of Engineering J.A. Wethington, Jr.3 - Acting Chairman, Department of Nuclear En-gineering Sciences (September 1,1984 - April 30, 1985 and June 1, 1985 - Augusst 8,1985)
W.G. Vernetson - Acting Chairman (May 1 - May 31, 1985 and August 9 - August 19, 1985)
G.S. Roessler - Acting Chairman (August 20, 1985 - August 31, 1985)
W.G. Vernetson 4 - Acting Director of Nuclear Facilities P.M. Whaley 5 - Acting Reactor Manager Note 1: G.S. Roessler currently holcis the position of Acting Chairman, De-partment of Nuclear Engineering Sciences replacing Dr. J.A. Wething-ton, Jr. in August, 1985 as a search is underway for a permanent Chairman .
Note 2: Effective September 1, 1984, Mr. Marshall Criser is the now Presi-dent of the University of Florida.
Note 3: Dr. John A. Wethington, Jr. served as Acting NES Chairman for most of the year except for two brief periods when Dr. W.G. Vernetson as-I sumed the position in his absence (May 1 - May 31, 1985 and August 9
- 19, 1985) until August 20, 1985 when Dr. G.S. Roessler assumed the position of Acting Chairman until the search for a new permanent Chairman is complete.
Note 4,5: Dr. N.J. Diaz was on leave for the entire reporting year. In his absence, Dr. W.G. Vernatson continued in his appointment to the po-I sition of Acting Director of Nuclear Facilities with Mr. P.M. Whaley serving as Acting Reactor Manager.
I e
E. Line Responsibility for the Radiation Control Offic3 M.M. Criser, Jr. - President, University of Florida W.E. Elmore - Vice President, Administrative Affairs T. R. Turk - Acting Director, Environmental Health and i Safety (September 1, 1984 - October 7, 19f34 ) l W.S. Properzio 6 - Director, Environmental Health and Safety (October 8, 1984 - August 31, 1985)
D. Munroe - Radiation Control Officer I
I l
l I
I Note 6: The new Director of Environmental Health and Safety (Dr. William S.
Proporzio) assumed this position as of October 8, 1984.
l 10
I III. FACILITY OPERATION I The UFTR continues to experience growth in utilization in rnany areas when compared to the last reporting year, with total utilization continuing near the highest levels recorded in the early 1970's. This increase has been sup-ported by a variety of usages ranging from industry educational and training programs to research and educational utilization by users within the Univer-I sity of Florida as well as other researchers and educators around the State of Florida through the support of the DOE Reactor Sharing Program.
As noted, the development of the Neutron Activation Analysis laboratory has improved research irradiation utilization. With successful implementation of the new remote sample-handling " rabbit" facility, efforts to advertise a-vallability and encourage usage of the UFTR (especially for research) are pro-ceeding favorably. Under the Reactor Sharing Program there has been signifi-cant usage by users from other schools with many more planned and some pro-posals for separate funding in progress. In addition, there have been a number of usages among researchers at the University of Florida with several more noted again this year. With one conmercial research irradiation this year, it is hoped some additional commercial irradiations will be forthcoming during this next year to further complement UFTR operating activities.
The level of administrative work dedicated to regulatory activities is expected to be at an increased level during this next reporting year due to commitments made to NRC following the February 11-15 inspection citing the UFTR licensee for failure to properly control a modification and to implement a Quality Assurance in accordance with guidelines in ANSI Standard N402-1976.
The facility response to the NRC inspection report is contained in Appendix A.
The NRC notified acceptance of this response in a letter dated May 6, I 1985.
Shown in Table I is a summary breakdown of the reactor utilization for 11
I this reporting period. The list breaks UFTR utilization down into the 47 dif-ferent research projects, various tests, teaching and training activition. The total reactor run-time was about 608 hours0.00704 days <br />0.169 hours <br />0.00101 weeks <br />2.31344e-4 months <br /> while the various experiments and other projects used over 1336 hours0.0155 days <br />0.371 hours <br />0.00221 weeks <br />5.08348e-4 months <br /> of facility time. The run time represents a decrease of ~15% from last year though there were many more concurrent usages during the current year to optimize utilization of available personnel.
In contrast the experiment time represents an increase of nearly 15% without accounting for over 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> of concurrent experiment time. In summary these figures indicate continued growth in facility usage over the last three years despite the dramatic increases of over 300% noted last year.
Table II summarizes the different categories of reactor utilization: col-lege and university teaching, research projects, UFTR operator training and requalification, utility operator training, testing, maintenance and surveil-lance activities, and various tours and reactor operations demonstrations which is a final category to account for all other planned usages. College course utilization involved 16 different courses, some more than once to ac-count for over 130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> of actual run time. The research utilization con-sisted of 13 projects using about 429 hours0.00497 days <br />0.119 hours <br />7.093254e-4 weeks <br />1.632345e-4 months <br /> of actual reactor run-time. Again both these usages had considerable concurrent usage. As noted, there are in-creases in several areas from the last reporting year, enpocially in the re-search and training supported under the DOE Reactor Sharing Program. This pro-gram plus the two com:rercial utility training programs and the large amount of maintenance, testing and surveillance activities are primarily responsible for the total facility utilization continuing to be one of the highest in UFTR history especially since growth in UF course usage has leveled off. With utility training and outside research activities already scheduled for the up-coming year, this next year promises to produce facility utilization at a similar or even higher level. With the reoccurrence of the sticking S-3 con-I 12
I trol blade, this expected usage is very optimistic especially in the areas of college courses and research, though Category 4 may well increase substan-tially.
Table III contains a breakdown delineating the 7 schools and their 66 usages of the UFTR facilities which were sponsored *2nder the Department of Energy Reactor Sharing Program grant. These sponsored usages account for about 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of run time in Category I in Table II and over 190 hours0.0022 days <br />0.0528 hours <br />3.141534e-4 weeks <br />7.2295e-5 months <br /> of run time I in Category II and have resulted in much improved visibility for the UFTR a-round the State of Florida and also among researchers and other users at the University of Florida. In all, the 66 usages represent a doubling from last year; while the total of 13 faculty is only a slight increase, the 100 stu-i dents involved is nearly a 200% increase. Obviously this Program is the driv-ing force behind the renewed utilization of the UFTR facility. With several l
proposals for funding in progress and one funded usage of the facility based on reactor sharing research results, the UFTR facility is gradually building a base for long-ter.n permanent growth of facility utilization with the Reactor Sharing Program serving as the catalyst for this growth.
Detailed in Table IV are the monthly and total energy generation, as well as the hours at full-power per month and totals for this past year. ' The UPTR generated 35.38 Mw-hrs during this twelve month reporting period, down some l
1 l
2% from last year but still the third largest value in UPTR operating his-r tory. This decrease is primarily due to more concurrent usage to optimize staff availability and due to much more time spent in experiment preparations where there was considerable growth as noted. Of course, there were several research usages such as for the Cerenkov Detector Development Project where the usage was lengthy but at relatively low or fluctuating power levels. The same low power operation applied during January in preparation for fuel in-spection activities. Finally the 80% availability factor for the year did ac-I ,,
count for some considerable lost power generation and run time.
Described in Table V is the monthly breakdown of usage and availability data. As was noted in Section II of this report, extended forced outages for maintenance were responsible for low availability in October, February and March. Similarly, though available most of the month of January, the reactor was limited to low power operation in preparation for fuel inspectior. activi-ties carried out in that month. Similarly, Table VI cont ains a detailed break-down of days unavailable each month with a brief description ~ the primary cause. The overall availability of 80% is one of the lowest values in recent years as a considerable amount of major maintenance was performed.
Described in Table VII-A are the reasons and dates for four unscheduled trips for the reporting period. Table VII-B contains a similar tabulation for 14 scheduled trips. All safety systems responded properly for all trips. Sev-eral reportable incidents occurred during this reporting year. Table VIII con-tains a descriptive log of fourteen (1) unusual occurrences with brief evalua-tions of each. Each is described in some detail as several were promptly re-portable while the rest are reported in this report and in several cases do not need to be reported at all.
No uncontrolled releases of radioactivity have occurred from the facility and controlled releases are well within established limits. The personnel ra-diation doses were somewhat above the usual low level primarily due to the thennocouple maintenance project in October as delineated in Section VII. En-vironmental radioactivity surveillanco continues to show no detectable off-site dose attributable to the UFTR facility as also noted in Section VII.
.I l
I 14 <
1
TABLE I
SUMMARY
OF FACILITY UTILIZATION (September,1984 - August , 1985)
NOTE: The projects marked with a
- indicate irradiations or neutron activa-tions. The projects marked with an ** indicate training / educational use. The projects marked with an *** indicate demonstr'ations of reactor operations. "Zxperiment Time" is total time that the facility dedicates to a particular use, it includes "Run Time." "Run Time" is inclusive time commencing with reactor startup and ending with shutdown and securing the reactor.
__ RUN EXPERIMENT TIME TIME PROJECT AND USER TYPE OF ACTIVITY (hours) (hours)
- ENU 4905/6937 - Independent Reactor Operations 103.32 184.;88 Dr. W.G. Vernetson/ Laboratory Course for Under- (23.52) (20.96)
Reactor Staff graduate and Graduate Nuclear Engineering Students I *Fla. Foundation for Future Scientists (NAA Research) -
Continuation of Summer 1984 Student Research Program: NAA of Potential Hogtown Creek 46.77 (19.55) 51.35 (20.51)
I Dr. W.G. Vernetson/
John Carswell Contaminants
- NAA Research - Dr. G.
I Chiu/Dr. Ranga Rao -
University of West Evaluation of Uptake of Heavy Metals in a Seagrass Community 141.32 (50.85) 147.60 (54.92)
Florida - Reactor Sharing
- Operator Training - Reactor Operations Training 31.34 91.37 Dr. W.G. Vernetson/ for Reactor Operator Candidates (20.68) (45.54)
Reactor Staff (C.J. Stiehl and W.M. Cason)
Transient Simulation Verification of DSNP Simulator 2.15 2.83 Research With DSNP - Calculations of Various UFTR Dr. E.T. Dugan Transients
- Radiation Surveys / Radiation Surveys of UFTR Cell 16.60 20.18 RadCon Training - and Environment at Steady-State (14.90) (10.73)
Radiation Control Full Power Plus Training of Ra-I diation Control Personnel (Inclu-ding Second Person Qualification)
- NAA Research on Elec- Analysis of Silver Diffusion in 20.68 21.93 tronic Components - Silicate Glass Slides for Micro- (14.75) (15.15)
Dr. V. Ramaswamy, UF chip Applications Elec. Eng. Dept.
15
1 TABLE I (CONTINUED) l RUN EXPERIMENT TIME I
TIME PROJECT AND USER TYPE OF ACTIVITY (hours) (hours)
- Santa Fe Community Lectures, Tours and Demonstra- 3.16 7.67 College Nuclear Med- tion of UFTR Operations with icine Radiologic Radiation Surveys and NAA Technology Prog am - Training Exercises S. Marchionno -
Reactor Sharing Cerenkov Detector Reactor Radiation Measurements To 48.95 117.79 Development - Test and Calibrate a New Cerenkov (7.95) (10.17)
Dr. E.E. Carroll Radiation Detector System
- ENU-5005 - Lecture, Tour and Demonstration 0.42 1.42 Dr. A.M. Jacobs of Reactor Operations for Non-Nuclear Engineering Students
- Central Florida Com- Lectures , Tours and Demonstra- 2.58 6.25 munity College Radia- tions of Reactor Operations tion Protection Tech- and NAA Exercises With Radia-nology Program - G. tion Surveys and NAA Training Stephenson Exercises
- ENV 4201 - Dr. Lecture, Tour and Reactor Fa- 1.82 4.84 C.E. Roessler cility Instrumentation and Op- (0.75) erations Demonstration
- ENV-6211 - Dr. Lecture, Tour and Demonstration 1.00 2.08 C.E. Roessler of Reactor Facility Capabilities and Reactor Operations
- Dr. W.G. Vernetson Candidates
- Reactor Operator Hot Training Course for Florida 73.23 110.05 License Candidate Power Corporation Crystal Training - River 3 Hot License Operator Dr. W.G. Vernetson Candidates
- UF Freshman Honors Lecture, Tour and Demonstra- 1.15 3.42 Program - Bert tion of Reactor Operations Hickman Argon-41 Effluent De- Argon-41 Stack Concentration 13.20 20.25 terminations - Dr. Measurements and Evaluation (2.38) (2.97)
W.G. Vernetson/
Reactor Staff 11 l
l 16
TABLE I (CCNTINUED)
RUN EXPERIMENT TIME TIME PROJECT AND USER TYPE OF ACTIVITY (hours) (hours)
- Licensed Operator NRC Requalification Training 0.89 28.45 Requalification Requircments Including Lec-Training - Dr. W.G. tures, Demonstrations and Vernetson/ Reactor Startups and Reactivity Mani-Staff pulations as Necessary
- CFCC Radiati on Pro- Two Reactor Operations-Based 16.33 111.62 .
tection Technology Radiological control and Pro- (8.61 ) (10.52)
Program - Mr. G. tection Training Programs of Stephenson - Reac- Cooperative Work Exercises tor Sharing
- ENU 4505L - Senior Level Nuclear Engineer- 19.03 28.50 Dr. E.E. Carroll ing Laboratory Exercises and (1.90 ) (2.00)
Experiments
- NAA Research - Dr. T. Evaluation of Effects of Oil- 84.42 88.02 D'Asaro - University Related Drilling Fluids on Sea- (16.91 ) (17.60)
I of West Florida -
Reactor Sharing Grass Communities
- Florida Regional Ju- Lecture, Tour and Demonstration 0.00 5.50 nior Science, Engi- of Facility Capabilties neering and Humanities Symposium - Dr. W.G.
Vernetson/ Reactor Staff
- IEEE Local Student Lecture, Tour and Demonstration 0.80 2.50 Section Meeting - of UPTR Operations and NAA Lab Dr. W.G. Vernetson Operations Sticking S-3 and Other Repair and Preventive Maintenance 1.35 76.92 Control Blades - on all UPTR Control Blade Drive Dr. W.G. Vernetson Systems External to Biological Shield
- NAA Research - Dr. Irradiation of Virgin Teflon 10.90 11.78 G. Smith /Dr. R. Tube for NAA of Constituents (5.45) (5.60)
Byrne - University and Evaluation of Radiation I of South Florida, St. Petersburg -
Reactor Sharing Damage Limits
- ENU 4104 - Lecture, Tour and Demonstration 1.28 3.17 Dr. A.M. Jacobs of Reactor Facility Operations (0.92*)
and NAA Lab Use for Junior Level Nuclear Engineering Students ll 1>
TABLE I (CONTINUED)
RUN EXPERIMENT TIME TIME PROJECT AND USER TYPE OF ACTIVITY (hours) (hours)
- Physics of Materials Investigation of Thermal Neu- 31.55 33.80 Research - Dr. Hans tron Induced Lattice Distur- (3.27) (3.67)
Plendl, Florida bances in Dielectric Materials State University -
Reactor Sharing
- St. Augustine High Lecture, Tour and Demonstra- 1.00 2.50 '
School Science tion of Reactor Facility Class - Ms. E. Doyle Operations and NAA Methods Reactor Sharing
- ANS Eastern Regional Lectures, Tours and Demonstra- 1.77 4.42 Student Conference - tions of Reactor Facility Op- (1. 77) (0.75)
M. Houts erations
- ENU 3002 - Lecture, Tour and Demonstration 0.83 2.17 Dr. R.T. Schneider of Reactor Operations (.83)
- Hillsborough Com- Lecture, Tour and Demonstration 1.50 2.75 munity College Nu- of Facility Operations with clear Medicine and Radiation Surveys and NAA Radiation Therapy Lectures and Training Exercises Technology Program -
Dr. M. Lombardi/Ms.
Diane Fricks -
Reactor Sharing
- Physics of Materials Evaluation of Neutron-Induced 95.58 98.17 Research - Dr. P. Color Centers in Dielectric (63.10) (64.73)
Gielisse, LTE Ltd. Topaz Materials
- ENU 65i6L - Graduate Level Nuclear Engi- 6.88 11.90 Dr. John Cox neering Laboratory Exercises and Experiments
- Florida Foundation Lecture, Tour and Demonstration 0.00 2.00 of Future Scien- of Reactor Facility Operations tists - Dr. W.G. and Experimental Capabilities Vernetsen for Two FFFS High School Students Reactor Research - Dr . Preliminary Analysis of Experi- 3.35 25.82 I G. Smith /Dr. R.
Byrne - University of South Florida, mental Conditions (Cd-Ratios)/
Design and Manufacture of Ex-periment !! older for NAA Research (0.67) (1.00)
I St. Petersburg -
Reactor Sharing
- NAA Research - Dr. UPTR Primary Coolant Baseline 15.07 20.80 W.E. Bolch/Dr. W.G. Activity Analysis and Evalua-Vernetson tion 18 .,a
I TABLE I (CONTINUED)
RUN EXPERIMENT TIME TIME PROJECT AND USER TYPE OF ACTIVITY (hours) (hours)
- Physics of Materials Investigation of TherTnal Neu- 31.55 33.80 I Research - Dr Hans Plendl, Florida State University -
tron Induced Lattice Distur-bances in Dielectric Materials (3.27) (3.67)
Reactor Sharing
- St. Augustine High Lecture, Tour and Demonstra- 1.00 2.50 '
School Science tion of Reactor Facility Class - Ms. E. Doyle Operations and NAA Methods Reactor Sharing
- ANS Eastern Regional Lectures, Tours and Demonstra- 1.77 4.42 Student Conference - tions of Reactor Facility Op- (1.77) (0.75)
M. Houts erations
- ENU 3002 - Lecture, Tour and Demonstration 0.83 2.17 Dr. R.T. Schneider of Reactor Operations (.83)
- Hillsborough Com- Lecture, Tour and Desronstration 1.50 2.75 munity College Nu- of Facility Operations with clear Medicine and Radiation Surveys and NAA I Radiation Therapy Technology Program -
Dr. M. Lombardi/Ms.
Lectures and Training Exercises I Diane Fricks -
Reactor Sharing
- Physics of Materials Evaluation of Neutron-Induced 95.58 98.17 Research - Dr. P. Color Centers in Dielectric (63.10) (64.73)
Gielisse, LTE Ltd. Topaz Materials I **ENU 6516L -
Dr. John Cox Graduate Level Nuclear Engi-neering Laboratory Exercises and Experiments 6.88 11.90
- Florida Foundation Lecture, Tour and Demonstration 0.00 2.00 of Future Scien- of Peactor Facility Operations tists - Dr. W.G. and Experimental Capabilities Vernetson for Two FFFS High School Students Reactor Research - Dr. Preliminary Analysis of Experi- 3.35 25.82 I G. Smith /Dr. R.
Byrne - University of South Florida, mental Conditions (Cd-Ratios)/
Design and Manufacture of Ex-periment Holder for NAA Research (0.67) (1. 00 )
I St. Petersburg -
Reactor Sharing
- NAA Research - Dr. UPTR Primary Coolant Baseline 15.07 20.80 W.E. Bolch/Dr. W.G. Activity Analysis and Evalua-Vernetson tion 18
TABLE I (CONTINUED)
RUN EXPERIMENT TIME TIME PROJECT AND USER TYPE OF ACTIVITY (hours) (hours)
- Florida Foundation of Summer 1985 Student Research 16.40 17.50 Future Scientists Program: Comparative Analysis (8.97) (7.25)
(NAA Research) - of Hair Samples for Zine Con-Dr. W.G. Vernetson/ tent Using NAA and Atomic Ab-Marc Adams sorption Methods
- Florida Foundation Summer 1985 Student Research 1.13 3.75 '
of Future Scientists Program: Absolute and Relative (Reactor Physics) - Fluux Mapping of UFTR Experi-Dr. W.C. Vernetson/ mental Ports Philip Sakornsin
- ENV-4241 - Dr. C.E. Lecture, Tour and Demonstration 1.42 2.25 Roessler of Reactor Facility Operations Emphasizing Radiation Protection
- ENV-6211L - Dr. W. Graduate Level Health Physics 1.67 7.50 Properzio/Dr. W.G. Laboratory Exercises and Ex-Vernetson periments
- Gainesville Eastside Lectures, Tours and Demonstra- 0.33 2.58 I High School Science Students - Dr. G.
Williams tions of Facility Operations
- CHS 5110L - Lecture, Tour and Demonstration 11.92 18.75 Dr. K. Williams Reactor and NAA Lab Operations / (3.82) (4.00)
NAA Utilization for Radiochemistry Research Laboratory Course
- ENU 5005 - Dr. R. Lecture, Tour and Demonstration 0.48 2.00 Pagano of Reactor Operations for Non-Nuclear Engineering Students I ** University Police -
Dr. W.G. Vernetson Training Program of Lectures, Tours and Demonstrations of Special Emergency and Security-0.00 15.00 Related Facility Features Con-ducted for University Police Response Personnel to Include Responses to Alarms (Fire and Security) 19
I TABLE I (CONTINUED)
RUN EXPERIMENT I PROJECT AND USER TYPE OF ACTIVITY TIME (hours)
TIME (hours)
Miscellaneous - Dr. NRC Inspection and Enforcement 3.00 17.33 W.G. Vernetson Region II Inspections (Opera- (3.00) (.75) tions and NMSS), ANI Inspec-tions (2), Miscellaneous Tours I Involving Facility Demonstra-tions for Potential New Staff Members, Film Interviews and Picture Taking Sessions Technical Specifica- UFTR Facility Component and 30.68 109.41 tion Requirements - System Testing, Surveillance, (6.35) (15.23)
I Reactor Staff Calibration and Related Mea-surement and Verification Activities Required By Tech-I nical Specifications, Pro-cedures or NRC Commitments Maintenance Activities Preventive and Corrective 2.39 77.07
- Reactor Staff Maintenance and/or Replace-ment of UFTR Facility Com-ponents Excluding Minor Items I and Those Listed Individually To Include System Testing as Necessary I TOTAL 1,2 888.02 1650.34 (280.90) (314.05)
TOTAL ACTUAL 607.95 1336.29 NOTE 1 : Values in parentheses represent multiple or concurrent facility uti-lization (Run or Experiment time); that is, the reactor was already being utilized in a primary run or activity for a project so a reac-I tor training or demonstration utilization could be conducted concur-rently with a scheduled NAA irradiation, course experiment, or other reactor run. Thus , the actual reactor run time for the 1984-1985 re-porting year is 607.95 hours0.0011 days <br />0.0264 hours <br />1.570767e-4 weeks <br />3.61475e-5 months <br />, a decrease of ~17% over the previous I year. In contrast, the actual experiment time for the 1984-1985 re-porting year is 1271.24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> , an increase of over 17% indicating more effective utilization of staff time.
NOTE 2: Exp. Time is run time (total key on time minus checkout time) plus set-up time for experiments or other reactor or facility usage in-I cluding checkouts, tests and maintenance involving the reactor facility.
I 20
I TABLE II UFTR UTILIZATION
SUMMARY
Run Time Experiment Time (hours) (hours)
- 1. 173.64 (40.35)
College Courses and Laboratories (16) 397.75 (37.48) .
- 2. Research Activities (13) 518.27 (191.47) 641.14 (200.60)
- 3. UFTR Operator Training and Re-I qualification (2) 32.23 (20.68) 119.82 (45.54)
- 4. Utility Operator Training (2) 91.61 135.00
- 5. UFTR Maintenance, Testing and Surveillance Activities (6) 64.22 (23.63) 303.83 (28.93)
- 6. Reactor Tours and Demonstrations (8) 8.05 (4.77) 55.25 (1.50)
TOTAL 888.02 (280.07) 1652.79 (314.05)
I NOTE 1: The same meaning is attached to values in parentheses as in Table I.
NOTE 2: The first two categories of College Courses and Laboratories as well as Research Activities include significant usages sponsored under the Department of Energy UFTR Reactor Sharing Program which allowed seven (7) schools to have 66 usages of the UFTR facilities as delineated in Table III.
NOTE 3: In some cases the assignment of items to one of the six categories is somewhat arbitrary especia'ly for non-college tour groups for whom lectures and other training is conducted.
Console checks are excluded from this Utilization Summary. In addi-I NOTE 4:
tion, non speciallized and usually non-scheduled tours for one or a few persons are not tracked in this Utilization Summary. These types of activities typically involve about 5-10 hours of additional time per month and are offered on an as-available basis depending on staff availability.
I I
.I r
21 1
I TABLE III 1984-1985 I REACTOR SHARING PROGRAM
SUMMARY
USAGE OF UFTR FACILITIES Users School Usages
- Faculty Students Central Florida Comunity College (CFCC) 26 2 35 Florida State University 7 2 3 Hillsborough Comunity College (HCC) 1 2 28 Santa Fe Comunity College (SFCC) 3 1 22 St. Augustine High School (SAHS) 1 1 9 University of South Florida, St. Petersburg (USF-SP)
I 5 2 1 University of West Florida (UWF) 23 3 2 TOTAL 66 13 100 I
Usage is defined as utilization of the University of Florida Training Reac-I tor for all or any part of a day. In many cases a school can have multiple usages but all related to the same research project or training program.
I I
I l
l l 22
I TABLE IV MONTHLY REACTOR ENERGY GENERATION j
(September, 1984 - August, 1985)
I Monthly Totals Kw-Hrs Hours at Full Power' September, 1984 2523.39 25.03 October, 1984 2533.04 24.50 November, 1984 3044.72 27.72 December, 1984 2031.23 14.23 January, 1985 2338.47 22.30 February, 1985 00.00 00.00 March, 1985 3813.46 37.23 April , 1985 5524.84 53.87 May, 1985 3270.83 32.55 June, 1985 3095.47 30.90 July, 1985 4874.31 48.11 August, 1985 1929.17 19.25 YEARLY TO'rAL 35,878.93 2 345.69 I
I Note 1 : Kw-Hrs yearly total for the 1984-1985 reporting year represents a 24%
decrease over the previous reporting year while the hours at full power represent a similar 24.516 decrease over the previous year. Al-I though the 24t6 decrease is significant, this decrease ic calculated relative to the highest values ever recorded during the 1983-1984 re-porting year. In actuality the energy generation was very good con-I sidering the loss of two full time staff members the previous year who now work part-time but without replacement in the staff. In addi-tion, the total run time for the facility was actually higher for this reporting year indicating more low power usage for several pro-
.E 3 jects such as the Cerenkov Detector Development. Finally, several large maintenance projects during the year prevented still larger hours of facility utilization.
Note 2: The 35,878.9 Kw-Hrs of energy generation is the third highest one year total energy generation for the 26-year history of the UFTR.
23
TABLE V MONTHLY REACTOR USAGE / AVAILABILITY DATA (September, 1984 - August, 1985)
Monthly Totals Key-On Time Exp. Time l Run Time Availability.
September, 1984 46.60 hrs. 64.30 hrs. 40.95 hrs. 83.3%
October, 1984 50.50 hrs. 104.11 hrs. 42.87 hrs. 71.0%
I November , 1984 70.40 hrs. 141.49 hrs. 65.22 hrs. 86.7%
December, 1984 107.00 hrs. 172.82 hrs. 98.75 hrs. 83.9%
January, 1985 34.40 hrs. 107.34 hrs. 28.04 hrs. 83.9%
February, 1985 5.90 hrs. 110.75 hrs. 0.60 hrs. 0.0%
March , 1985 77.30 hrs. 134.04 hrs. 74.90 hrs. 80.9%
April , 1985 94.70 hrs. 131.96 hrs. 86.32 hrs. 100.0%
May, 1985 51.90 hrs. 92.50 hrs. 43.24 hrs. 100.0%
June, 1985 43.80 hrs. 90.93 hrs. 38.24 hrs. 90.0%
July, 1985 70.00 hrs. 140.40 hrs. 65.04 hrs. 93.5%
August, 1985 26.20 hrs. 47.68 hrs. 22.95 hrs. 83.9%
i TOTALS: 678.70 hrs. 1338.32 hrs. 607.12 hrs. 79.8% 2 I NOTE 1 : Experiment Time is Run Time (Total Key-On Time minus Checkcut Time) plus set-up time for experiments, tours, or other reactor usage in-cluding checkouts, tests and maintenance involving reactor running or facility usage.
NOTE 2: Monthly Average availability is 79.8%; on the basis of days of the year, the availability is 82.3% as indicated in Table VI.
I I 24
TABLE VI UPTR AVAILABILIT'
SUMMARY
(September, 1984 - August, 1985)
I Month Availability Days Unavailable Primary Cause of Lost Availability September, 1984 83.3% 5 days Thermocouple / Thermocouple Lead Failure October, 1984 71.0% 9 days Thermocouple Replacement November , 1984 86.7% 4 days Repair / Replacement of Failed Core Vent Fan and' Repair of Temperature Recorder December , 1984 83.9% 5 days Staff Vacations I January, 1985 83.9% 5 days Discovery of sticking S-3 Con-trol Blade I February , 1985 0.0% 28 days Maintenance and Repair of S-3 and Other Control Blades March, 1985 80.9% 6 days I Completion of Maintenance and Overhaul on Centrol Blade Drive Systems External to Dio-logical Shield April , 1985 100.0% 0 days -------------
May , 1985 100.0% 0 days -------------
June, 1985 90.0% 3 days Staff vacations July, 1985 93.5% 2 days Failure and Feplacement cf E-vacuation Siren Motor and Work on Core Vent Fan Motor August, 1985 83.9% 5 daye General Maintenance / Staff Va-cations TOTAL ANNUAL UNAVAILABILITY: 72 days I TOTAL ANNUAL AVAIL ABILITY: 291 days = 80.3%
NOTE 1: This availability summary neglects all minor unavailabilities for
> I NOTE 2:
periods smaller than a half-day. In most cases these periods are for less than an hour.
As indicated elsewhere, the therrrocouple repair work and the mainte-l lg nance and repair work on the Control Blade Drives accounts for most
'3 (53 days or nearly 3/4) of the unavailability.
25
TABLE VII-A UNSCHEDULED TRIPS
- I Date Description of Occurrence September 25, 1984 Reactor tripped at 100 kw on high primary temperature indication on temperature recorder for point #4 (Exit' of Fuel Box #4) due to faulty thermocouple and/or thermocouple connection. The trip evaluation showed that all safety systems responded to perform their intended safety function. All core exit line thermo-
. couples and lead wires were subsequer;tly replaced with no further problems noted.
June, 1985 At 1429 the operator (P.M. Whaley) noted an electri-cal transient that caused a trip during a reactor startup conducted as a training operation. The cause was determined to be the electrical transient as noted by the operator, by other personnel in Building
- 557 and as supported by a substation operator who reported to utility services that a 69 kv breaker had shifted. The trip evaluation showed that all safety systems responded as designed.
June 20, 1985 At 1249 the operator (W.G. Vernetson) noted a trip due to loss of secondary cooling while on well water cooling. The pump loss was caused by fuse failure, I apparently due to poor connections. All connections were cleaned and fuses were replaced. The trip eval-uation showed that all safety systems responded as designed.
July 2,1985 At 1316 while taking logs, the operator (W.G. Vernet-son) noted a trip on loss of secondary flow caused by loss of the well pump following nearly 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of full power operation to irradiate samples for subse-quent neutron activation analysis. The pump loss was caused by fuse failure, apparently due to poor con-nections causing overheating of the fuse assembly.
All connections were cleaned and 60 amp fuses were replaced. The trip evaluation showed all safety sys-tems responded as designed.
All safety systems responded as intended for the trips listed in this Table.
ll 2e
I TABLE VII-B SCHEDULED TRIPS Date Description of Occurrence September 13, 1984 Experimental trip designed to provide transient tem-perature data for application in analysis work with the Dynamic Simulation for Nuclear Power Plant (DSNP)
I code; the reactor was tripped by securing secondary water at 100 kw as part of run request 84-30. -
November 29, 1984 Training trip where reactor was tripped on si.nulated loss of secondary coolant flow.
December 17, 1984 Training trips (two) where reactor was tripped on re-duced secondary coolant flow.
December 18, 1984 Training trips (two) where reactor was tripped on simulated loss of diluting fan flow.
December 19, 1984 One training trip where rea-tor was tripped by manual intermittant operation of the evacuation alarm.
December 20, 1984 Training trips (two) where reactor was tripped on simulated loss of diluting fan flow.
December 20, 1984 One training trip where reactor was tripped on simulated loss of secondary coolant flow.
December 21, 1984 One training trip where reactor was tripped on simulated loss of diluting fan flow.
December 21, 1984 One training trip where reactor was tripped on simulated loss of secondary coolant flow.
May 23,1985 Two experimental trips were used as part of an effort to develop a standard alternate method for verifying that the UFTR void coefficient is negative. As ap-proved on Run Request 85-18, the UPTR w?s manually tripped from 1 watt power level two times. The first time the scram bar was used to provide a blade drop trip; the second time the console switch was cycled to provide a full trip involving a blade drop plus dumping of the primary water. All systems responded as expected for this exercir.e. More data is needed to complete the development of this method to verify a negative void coefficient.
NOTE: There were a total of fourteen (14) scheduled trips performed for training or experimental purposes during this reporting year.
27
1 ll TABLE VIII LOG OF UNUSUAL OCCURRENCES During this reporting period there were no events which compromised the health I and safety of the public. Several events, classified as unusual occurrences, are described below as they deviated from the normal functioning of the facil-ity and are included here as the most important such deviations for the re-porting year.
25 September 1984 - Reactor tripped at 100 kw on high primary temperature in-I dication on temperature recorder for point #4 (Exit of Fuel Box #4) due to a faulty thermocouple and/or thermo-couple connection. There was no compromise of safety as all safety systems responded properly. Inspection showed several of the thermocouple connections at the fuel box outlets, especially those on the North side of the core I (temperature recorder points #4, #5 and #6) to be de-graded due to high radiation fluence. All six thermo-couples at the fuel box outlets were replaced and new connections made with fresh wire with no further problems noted.
19 November 1984 - Failure of the vent fan system (fan motor failure) was I discovered at shutdown conditions on the af ternoon of Novertber 18, 1984. The failure was caused by excessive vibration which had in turn caused the vent fan motor to I come loose from its mounting and fail. The motor bearings were replaced and the entire motor remounted. There was no compromise of safety as all safety systems responded properly; the vent fan system trip specifically was still operable so this event would have tripped the reactor if the reactor had been operating at the time of failure. In addition, the fan motor failure caused the vent damper to I ,
close as designed. Therefore, there was no compromise of safety features and all safety systems responded properly for this occurrence.
26 November 1984 - Failure of the vent fan system occurred again at shutdcwn conditions and was again due to motor failure caused by excessJve vibration. This time the entire motor was re-worked including bearing replacement; in addition the motor mounting was reworked and the impeller rebalanced to reduce vibration to levels below those prior to the I original failure. Since all safety systems responded properly, there was no compromise of safety.
I l
28
LOG OF UNUSUAL OCCURRENCES (CONTINUED) 9 December 1984 - Mr. H. Gogun (a senior reactor operator) was discovered to have performed licensed activities during the previous week without meeting one of his license conditions (sub-mitting a 6-month blood sugar test). Evaluation of this occurrence by the Reactor Safety Review Subcommittee and UFTR Pacility administration indicated there was no com-I promise of safety; however, since potentia) violation of the UFTR Technical Specifications was involved, prompt notification of NRC was made and followed up by a special' report. Mr. Gogun was removed from licensed duties until notification of license renewal was received from NRC. In addition, administrative controls were implemented to prevent recurrence of this event.
I 11 December 1984 - Following intermittant failure of the red pen to track properly during a daily checkout, the red pen was found I to have a floating ground causing the inte rmittant prob-lem; compensating voltage power supply ground was jumper connected to chassis ground to assure proper ground with no further problem evident.
26 January 1985 - Following a brief de:nonstration power run and a normal shutdown, the effect of a rod drop for a large negative reactivity insertion was being demonstrated. One of the UPTR control blades (Safety Blade #3) was removed to a-bout 300 units and the clutch current interrupted but the I S-3 blade failed to drop fully into the core as it hung up at about 270 units withdrawn. This failure (sticking at about 27% removed) was discovered during a demonstra-I tion when the reactor was shutdown except for the control blade removal in question. The S-3 blade was subsequently driven in with no further problems encountered to secure the reactor. The blade was found to be sticking primarily in the 270-350 units withdrawn position when dropped from less than the fully withdrawn position. At full with-drawn, the int ertion time was still within the <1 second I Tech Spec limit. Evaluation of this occurrence by the Reactor Safety Review Subcommittee and UFTR Facility ad-ministration indicated there was no compromise of safety; however, since potential violation of the UFTR Technial Specifications was involved, prompt notification of NRC was made and followed up by an interim and a final spe-cial report as required by the UFTR Technical Specifica-tions.
.I 29
I LOG OF UNUSUAL OCCURRENCES (CONTINUED)
I 26 January 1985 (continued)
Inspection of the control blade right angle drive system produced one badly worn right angle shaft bearing and de-formed shim on the clutch housing. The cork shim on the clutch housing was replaced with aluminum shim to control deformation and both of the bearings on the right angle shaft were replaced with identical bearings. This mainte-nance restored proper operation to the S-3 control blade; the other three blade systems were subjected to the same inspection and preventive maintenance work with clutch -
housing shim deformation found in all and some wear show-ing on the other bearings. All gears were also greased and the reactor placed back in service following a com-plete set of tests to include measurements of control blade controlled insertion, controlled removal and full out drop times as well as verification of full insertion upon interruption of clutch current from a series of
, blade heights.
20 February 1985 - The primary coolant loop rupture disk was broken due to operator error. The operator was approved to perform a daily checkout but work in progress on Safety Blade #3 (disconnected from shaft) resulted in water being dumped (dump valve opened) when S-1 was withdrawn ~25' units and tripped for interlock checks. When the operator then re-started the pump, the disk was broken by the water hammer produced by the dump valve closure prior to full draining of the system. Primary coolant sample was surveyed by I Radiation Contrcl and the pit entered for normal cleanup and replacement of the rupture disk. The system was re-stored to normal operation without further incident; in addition, all operators were warned of the effect of a disconnected blade acting logically like a removed blade.
I 7 March 1985 - During a positive period measurement of reactivity worth based on 10 second (controlled) withdrawal of the S-1 control blade with power about 10 watts, the S-1 position indication went to 000 with no change in period. Although there was no change in reactivity, the operator shut down and secured the reactor and notified the Reactor Manager of the unscheduled shutdown; the suspected cause was a problem with a loose and partially oxidized cable connec-tor which was disconnected and cleaned to remove corro-sion deposits. Subsequent movement of the S-1 blade fer full withdrawal and full insertion was satisfactory. 'll four (4) cables for the four (4) control blades were sub-sequently checked for proper seating in the connectors I with no further problems noted as the reactor was re-turned to service.
ll >o
LOG OF UNUSUAL OCCURRENCES (CONTINUED)
I 20 June 1985 - At 1249 hours0.0145 days <br />0.347 hours <br />0.00207 weeks <br />4.752445e-4 months <br />, there was a trip of the UPTR from full power following about five hours of full power operation.
The trip was caused by failure of the fuse on the well I pump motor "b" phase due to contact degradation on the "b" phase contact. The loss of the pump caused the loss of secondary cooling and resulted in the trip (Safety Blades S-1, S-2, S-3 dropped from 640 units, Regulating Blade from ~578 units). The subsequent evaluation deter-mined that no safety limits were exceeded and all safety systems responded as designed. All well pump fuses were removed, the overheated connection reterminated, new fuses installed and the well pump tested and demonstrated to be operating properly. The trip evaluation was com-I pleted and restart was recommended providing the daily checkout was satisfactory.
I During the subsequent daily checkout prior to restart, the Safety #2 control blade (S-2) would not withdraw upon demand. Subsequent investigation was carried out to de-termine the cause. After several checks, the clutch was I suspected to be slipping; therefore, the clutch voltage was increased from 53 volts to 56 volts with the blade then found to be properly responding to a demand for re-I moval. These two voltages are both well within the 40-90 volts range recommended in the technical manual for the clutch voltage. The voltage was then reset back to the original 53 volts for checkout of the system.
All subsequent checks showed a normal response and the reactor was returned to service following RSRS approval I on June 21 and after discussions with Paul Frederickson at NRC on June 21 recommending only that a report be filed. (See NRC report dated 1 July 1985.) The UFTR staff, the RSRS and NRC Region II all agreed this event did not compromise reactor safety nor did it compromise the health and safety of any personnel or the public.
2 July 1985 - At 1316 hours0.0152 days <br />0.366 hours <br />0.00218 weeks <br />5.00738e-4 months <br />, there was a trip of the UPTR from full power following about 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of full power operation.
The trip was caused by the failure of the fuse on the well pump motor "b" phase due apparently to contact de-gradation leading to fuse failure by overheating. The loss of the pump caused the loss of secondary cooling and I resulted in the trip (Safety Blades S-1, S-2, S-3 dropped from 640 units, Regulating Blade from ~589 units). The subsequent e' valuation determined that no safety limits were exceeded and all safety systems responded as de-signed.
ll 31
LOG OF UNUSUAL OCCURRENCES (CONTINUED) 2 July 1985 - Since this same type of trip had occurred on 20 June (continued) 1985, after which Safety Blade #2 would not withdraw upon demand, the trip evaluation recommended concluding the irradiation in progress using the alternate city water cooling system provided the required check of the city water scram logic was successful and provided the tem-I perature trip, period trip, safety channel #1 and #2 trips and calibration checks on Safety Channel #1, Safety Channel #2, Log N, Period and Linear Pen were all satis- -
factory. The city water was recommended so the work to clean the pump contacts and replace the fuses could be carried out independently. The subsequent restart noted that Safety Blade #2 withdrew on demand under conditions and in a time frame nearly identical to those of the June 20 occurrence when the S-2 blade initially did not with-draw upon demand. The subsequent reactor operation was concluded without further incident.
Following completion of the cleaning of the pump contacts and replacement of all fuses, it was noted that the failed fuse was not the same one as the one fuse that failed on June 20 to cause a similar trip. The deep well secondary cooling system was returned to service on July 3 and determined to be working satisfactorily. However, the box containing the fuse holders was later checked and found to be very warm following extended operation of the deep well pump for secondary cooling. As a result, va-rious currents and voltages inside the cell and inside the fuse box were checked and found to meet specifica-tions. Because the fuse box was hot during running appa-rently indicating contacts degraded beyond the point of simple cleaning as a fix, it was decided to replace the entire fuse box assembly holders and switch plus tighten I all connections in both switch boxes and contactor. This maintenance was completed on July 8, 1985. Subsequently the fuse box was checked several times and found to be much cooler during running of the secondary cooling sys-tem (deep well pump). As a result of this work and eval-uation, a source of several reactor trips over the past year is considered to be eliminated.
l 32
LOG OF UNUSUAL OCCURRENCES (CONTINUED) i i
17 July 1985 - At 0755 hours0.00874 days <br />0.21 hours <br />0.00125 weeks <br />2.872775e-4 months <br />, following a successful pre-operational checkout in which loose contacts on the chopper coil of the red pen were tightened, the Acting Reactor Manager I ( P.M. Whaley) commenced a reactor startup. However, at 0800 the linear (red) pen was noted to stop functioning so an unscheduled shutdown was performed and the reactor secured. The chopper was removed and its contacts and others on the two pen recorder were cleaned. The two pen recorder was returned to service following checks showing' satisfactory operation. Reactor operation te full power was satisfactory. However, at 0918 the operator ( G.W.
Fogle) commenced another unscheduled shutdown when the operation of the linear (red) pen became excessively noisy and intermittent.
The source of this intermittant operation was traced to I the suplifier circuit where a leaking capacitor was re-placed. In addition, all solder joints and runs were in-spected with several found to be possiblu sources of the I intermittant failure. All were repaired. Subsequent tests showed satisfactory operation. Subsequent operation of the two pen recorder to the end of August has been with-outfailureasthesourceofthisintermittkntfailure has been removed.
or e.
22 August 1985 - While the reactor was shutdown for quarterly scram I checks, the primary coolant storage tank was overfilled resulting in wetted core vent filters. Although the ra-diation and radioactivity levels were somewhat elevated above background during the maintenance work to replace them, the entire filter replacement and cleanup project were completed without problems under RWP 85-7-II.
22 August 1985 - The flow scram switch in the primary coolant return line was found to be failed during routine checks associated with the quarterly scram function checks. The reed switch contacts were welded shut due to a short circuit. The switch itself was removed and an identical spare in-stalled and checked out. Subsequent checks of the return line flow scram showed proper actuation on loss of flow.
This failure was discovered during a scheduled surveil-lance check by the Acting Reactor Manager who indicated he caused a short by making an incorrect accidental con-I nection prior to the check. In addition, this trip func-tion has a redundancy since there is also a 30 gpm flow scram on the core inlet line which was found to be func-I tioning properly. Therefore, based on technical specifi-cations defining prompt reportability requirements, no prompt report was made.
33
I I IV. MODIFICATIONS TO THE OPERATING CHARACTERISTICS OR CAPABILITIES OF THE UPTR I A number of modifications were made to the operating characteristics or capabilities of the UFTR facility during the rcporting period. These modifica-tions were all subjected to 10 CFR 50.59 evaluations and then determinations as necessary to assure no unreviewed safety questions were involved. In gen-eral, these modifications are subdivided into two categories - temporary or permanent - and are addressed in chronological order in the following listing and associated description. -
I 1 Replacement Modification of Annex Evacuation Siren Motor (Temporary) 7 January 1985 - 5 August 1985 After the original motor in the annex evacuation siren burned up follow-ing extended continuous operation for an emergency drill, a series of ac-I ceptable but temporary substitutes were utilized until the same motor could be obtained for replacemen',. On 7 January, the series wound evacua-tion siren motor was replaced with a synchronous motor which burned out.
On April 8, an induction motor was installed but it later burned out al-s o. On 22 July a solid state device was installed temporarily after checking to assure the resulting siren would be effective. Since no tric-kle current could be used to assure operability in the control room as part of the daily checkout, the siren was checked by running it as part of the daily checkout until a duplicate replacement for the original motor was obtained and installed on 5 August 1985 to close out this modi-I fication.
- 2. UFTR Building #557 Automatic Fire Alarm System Upgrade (Permanent) 11 February 1985 I Following extensive reviews of automatic fire alarm system requirentents in the UFTR building, the existing two zone system (Reactor Cell, Remain-der of Building) was replaced with a four zone system (Reactor Annex, Reactor Cell , Controlled Access Area, Remainder of Building). In addition to an increase in pull stations, smoke detectors were added for the Reac-tor Annex and for the UFTR Staff Office Area outside the reactor cell as recommended in several reports by American Nuclear Insurer Inspectors.
! Work on the fire alann system installation at the UFTR was completed ir.
February. All checks of the systems on February 11 by W.G. Vernetson, I P.M. Whaley, Keith Stephens (Engineering) , Dyke Dutra (Physical Plant) and Ray Knowles of Total Securities, Inc. showed the system to be com-plete and functional. The four-zone UFTR system is completely operational with no overnight downtime as required to avoid fire watches including a dedicated telephone line to UPD.
I 34
I On February 20, 1985, Mr. G. Nuce along with P.M. Whaley and a Centrex Fire Alarm Maintenance Engineer rechecked the system for operational capability and found it to be complete. The existence of several imper-fect solder connections in one of the plug-in modules of the UFTR system were noted; these connections do not affect current operation but could cause the system to give an alarm after less than normal usage. There-fore, the installing company is being requested to replace the module.
The UFTR administration considers the UFTR system operational; it repre-sents additional fire protection over that specified in the PSAR.
- 3. Control Blade Clutch Housing Shim Modification (Permanent) 26 February - 2 March 1985 As part of the corrective and then preventive maintenance performed on all four control blade drive systems external to the biological shield, the compressed and decomposing cork material comprising the shim material between the two halves of the clutch housing was replaced with relatively incompressible aluminum metal shim between the halves of all four clutch housings. The objective was to replace the compressible cork material subject to gradual decomposition with aluminum which would prevent exces-sive force on the clutch by assuring proper spacing. The details of this modification were evaluated not to involve an unreviewed safety question I will full implementation incorporated as part of the corrective and pre-ventive maintenance performed on the control blade drive systems. The full final summary report to NRC on the sticking S-3 control blade prob-I lem to include notification, corrective action, preventive maintenance including the shim modification, and final tests and surveillances is contained in Appendix B of this report.
- 4. Installation of Vent /Dilutant Fan Interlock With Evacuation Alarm (Permanent) 16 May 1985 I This modification was actually performed in October 2,1982. However, in response to the notice of deviation cited in NRC Inspection Report No.
I 50-83/85-01 dated 18 March 1985, a complete recheck was made of the de-sign and installation of the interlock. This complete documentation in-cluded checking the interlock circuit as implemented and producing a fi-nal drawing of the interlock circuit as installed on 15 May 1985. No I changes were made during this effort. Finally, a complete evaluation and determination was made of the modification to assure proper documentation existed to assure no unreviewed safety questions were involved with final closeout of the modification completed on 16 May 1985. As noted in the re-sponse to the NRC Inspection Report contained in Appendix A, the UPTR li-censee had performed these reviews in 1982 but some of the documentation I was found to be incomplete during the February, 1985 inspection. The fi-nal drawing of this modification is contained in this Section as Figure 1 I
I I '
-. - . . ~ - . . . - -
- 5. Vent Fan Motor (3450 rpm)/Padclle Impeller Rotor Replacement With 1725 rpm Motor and Squirrel Cage Rotog (Permanent) 19 July 1985 Maintenance was performed on the vent fan motor, mounting assembly and paddle impeller rotor on several occasions during the reporting year (21 November 1984, 26 November 1984, 15 July 1985). On the basis of this periodically recurring problem caused by excessive vibration, a modifica-tion was designed and installed. Basically a new three phase moter of lower speed (1725 rpm versus 3450 rpm) was installed on 19 Jr.ly 1985 a-long with a lighter squirrel cage rotor assembly to reduce ti.a likelihood of vibration-induced failures. Since vent flow rates are maintained at unreduced levels, as verified following installation, this modification was evaluated and found to involve no unreviewed safety questions. Opera-tion to date has been ..ithout failure.
- 6. Clamp Stop Installation on Vent Fan Damper (Temporary) 22 July - 25 July 1985 Following installation of the modified vent system fan motor and squirrel cage rotor, the damper motor / operator assembly was found to be malfunc-
.I'- tioning by opening past its stop when closing. A clamp stop was installed temporarily'on the vent fan operator housing to prevent excessive motion of the operator to reopen the damper following shutdown of the system.
I The temporary clamp on the vent fan damper was removed on 25 July 1985 as a new damper motor / operator assembly was installed. This temporary modi-fication was evaluated and found to involve no unreviewed safety ques-tions.
- 7. Annex Basement Lab Installation (Permanent)
In progress at year's end.
, - Part of the reactor building annex basement is being converted to a mate-
.I rials microscopy laboratory for the Materials Science and Engineering De-partment. Installation of this laboratory will affect the internal con-tents of the basement primarily to include isolating one half of the an-I nex basement from the Reactor Support Shop Facility. This building modi-fication was found to represent no unreviewed safety questions as it is essentially a passive change to the internal arrangenent of the annex basement with one exit added. This modification was not complete at the end of the reporting year but is expected to be complete; during the up-coming reporting year.
I I
i 3e
I
- 8. Center Vertical Port Graphite Multiple Sample Holder (Temporary)
Availabic at year's end but not used.
On 2 July 1985 a m w modification designed for use within the center ver-tical port area was cpproved from drawings and a detailed Reactor Run Re-quest completed as per requirements of UFTR SOP-A.S. The device was then manufactured and is now avsilable for multiple sample irradiations in the center vertical port area. The holder consists of a piece of reactor grade graphite with holes drilled to hold 10 small samples for long-term I irradiation. The sample holder will actually replace the one piece of graphite with the single centar vertical hole in it that is currently used when irradiations for NAA of rare earth samples are performed.
At the end of the reporting year the device was manufactured but no cha-racertizing measurements had yat been run on it. This temporary modifica-tion, when in place, will not be movable and has been evaluated and found to involve no unreviewed safety questions. It will be thoroughly charac-terized for reactivity effects prior to experimental usage. A drawing of this assembly is included in Figure 2 at the end of this Section. The I implementation of this tempcrary experimental modification will be com-pleted during the upcening year.
I I
I lI I
I n
Sme>< cc,.u$ ~PAci.~]
I s',ne rtsu-46 l s- 't'
<<. a>> n ase, r> <.oc g l ,
_ am
- s ,i -
I Ree se,or d. 1 I,*'*,,
s- g I,
T R etc
- f' hl "
g
@+1eT*t@ -
s O'a"
ev G
- Wl.
- W
% 'b t l s i
, T rs.* '
. _ - - - -h --- c -(n)- h --(r)--(e) y@ - b {r ; ,.,, ,*,*.., , , , ,, ,, g;,,, ,3-
, y b , s-,. .. s an u~so,r- v o e a w -
~?, 'I
- a A r.< a nce
% c.,
" , 3, 'i m~4-
_'ro du~re s re .
,\ - ,
t
~ r fo +
si e ls ? e l
5 Uf H ] {[,'f, '
... 1 9 ~. .. .
su 9 -
i Ve*- k ', S h
'" <Q,f, 5("I gi a,arvit co t
./< 7G r.nere v4 8
t I" */st4 ,,
4 l v v ... v v i k 15 i
vp*7/2 1
5 g / V l 5mer,
{g*
I y ,e:r .~ l s, s,,un.v I
c wrai.
5 g 7 * <3 g ca.reva v *.7 lc--
g.
4F+5 l ses a s P4 t__ _ _ - _ - -_Q9-._g - - - - I.
A 6 a 4Yl' >^~)
ora r so4 t /se - -
r,. , t,,resus.tV~.1
, , , - --~ q se.cs, o aro,mo Terse.Rss><,
Y on sj;a y D ar l
un ro I
n & <1 g , . % irt I2*
. ses s>
e
~ , * !' ' 'y%
- In. dil gne,s clu. -
' 0***"' h n
.ry g ,, /.y _
l -. - -- ~ w.1* D * "it*Le g aus er s'o n V!"
s,orr.G q l m, j b ef * '
lyg., [
.) * \ n ytwsus 3
I @
Rt. , tr. I g y.
"s."
)
Vv AC l
I
. _j.12'."N .> *
=
2r ,e b
I (o 5 *ea. C.* '
I T .
[
,brr,., ae r e~ , *.'t < . . rn , 4,3 c o [
H V~') ,V"; (,'*
l },l n o.. en ;
- . yu, ..e.
...n, _
L<21-.y), . s
, > ,,".",t- k'~ . 2
- l .
3 L,g *'*I
- % ,s.r . i l O'8 D
. \,[.i*" p s/ a,* I
- a. _ _ ,
~.- -
. < ,, ,,1r* O *r , .it __t 'W '-
. . . , - \ ese s.rtsr* cc I
As .
,*.; . ~ s s
~
-se; 1. sc ,,u.
. - - ~ - ~ ~
/
' , ,..; 4_.,
- 3. ': .,y +"---TT~= ^ ' ' 5 *::'.;' Il vr ~n. s.Xce < < ~ r~ s.
nQ -' ' ' . ' , ,; 4,w -~ w . . n . , s.~ ,ce- ~~ o. ~. r ~
,",,,, s . . . .
' ,., ,,,,. o . 3 -1 l C.s? e vf%
J ' ,'. ,,a 1 I
N '
I #.,,.3 e as <eev or a! s, .. ;A4'# '
us, y , , , , ,, n -
2, v -
g l csto cer..-
. *!su <e.c.a.
' s ' '**'
- f. .a w,'. .' - *}, l , g,,,, r,y D s ,xs.; f),a,_
1 l
N [
- ~. .........f c . - . > 4. . u~. n . w se ,
FIGURE 1. Vent /Dilutant Fan Interlock Circuit Approved 16 May 1985 As Installed 2 October 1982 -
1 -
1 1
- e
. . 0"
___ -____ _ _________-_______________./
I g . .
_. . j I
>;,. 4
= 1 I
a I I .
9
- o \,,. u., o '
s,
_______.... _ *d..-___
W e
>4
.--_.____'s,.__s,-_..... *
,. -,,.../....,
~ .
g O O a i Oj !Oj s~_.,.'
a a t ',~_ . . '
< E e f s
.p*
)
l
, ___ .. _____.____.______._____y t
t.. i 4
(
> ,i.__._...._-....._.__.
._______ - -. ___________ -- - -_____ ___4 .
1 FIGURE 2. Center Vertical Port Area Graphite Multiple Sample !! older 39 - -
V. SIGNIFICANT MAINTENANCE TESTS AND SURVEILLANCES OF UFTR REACTOR SYSTEMS AND FACILITIES I Records for the 1984-1985 reporting year show extensive maintenance was performed particularly in such areas as replacement of primary coolant core I outlet thermocouples and lead wires, corrective and preventive maintenance on all four control blade drive systems external to the biological shield, com-plete overhaul and corrective maintenance on the two-pen recorder, corrective maintenance and finally replacement with a modification of the core vent motor I blower system. In the table that follows all signficant mainterance, tests and surveillances of UFTR reactor systems and facilities are tabulated cod briefly -
described in chronological order; this tabulation includes administrative checks as well. Surveillance tests or other checks / maintenance required by the Technical Specifications, NRC commitments or other administrative controls are designated with a prefix letter and a number; otherwise the items listed are I considered maintenance, though in the area of the maintenance on control blade drive systems, this work actually constitutes part of the V-1 Blade System Mechanical Checks required to be performed for the entire reactor control sys-tem every five years as specified in tha UFTR Technical Specifications Sur-l veillance F.equirements, Section 4.2.2, Paragraph 4.
l Date Description I
17 September 1984 Decontaminated the glove box / receiving station for the pneumatic delivery system.
17 September 1984 Q-4/Q-5 Radiation Surveys of Unrestricted and Re- !
stricted Areas.
28 September 1984 Completed overhaul of two-pen recorder to include in-stalling a new slide wire and new bushings.
I 28 September 1984 Q-3 Quarterly Radiological Emergency Drill.
1 October 1984 S-3 Semiannual Inventory of Special Nuclear Material.
5 October 1984 S-6 Semiannual Inventory of Security-Related Keys.
29 October 1984 Q-1 Quarterly Check of Scram Functions.
30 October 1984 Heavy Water Inventory for Department of Energy.
31 October 1984 Q-2 Quarterly calibration check of area and stack radiation monitors.
9 October 1984 Completed restacking of reactor shielding and check-out of reactor following replacement of fuel box out-I let thermocouples and retermination with new lead wire.
8 October 1984 Reconnected and checked out proper operation of pit sump alarm.
I 40
l I
1 Date Description I 9 October 1984 Adjusted microswitch arm on pit sump alarm module in control room to assure proper activation of buzzer.
9 October 1984 Checked out and cleaned contacts on Safety Blade 2 to assure proper withdrawal on demand.
10 October 1984 Retenninated thermocouple #9 on heat exchanger secon-dary side.
I 25 October 1984 Tightened pump valve packing following minor seepage.
29 October 1984 Replaced shield tank filter and added ~20 gallons of demineralized water to shield tank.
I 1 November 1984 Q-2 Quarterly Calibration Check of Stack Radiation Monitor.
9 November 1984 Replaced the compensating voltage power supply for the linear (red) pen on the two-pen.
9 November 1984 S-8 Checked Sb-Be Source for Leakage.
14 November 1984 S-8 Checked Pu-Be Source (M-79) for Leakage.
21 November 1984 Removed failed core vent fan motor and replaced bear-ings as well as adjusted mounting and added addi-tional shock absorber material to limit vibration.
26 November 1984 Removed and reworked failed core vent fan motor and replaced bearings as well as overhauled motor; also reworked mounting to limit vibration.
27 November 1984 Removed and cleaned cam-operated microswitch on tem-perature recorder.
30 November 1984 A-3 Annual Measurement of UPTR Temperature Coeffi-cient of Reactivity.
11 December 1984 Corrected improper grounding of compensating voltage power supply for the red pen on two-pen recorder.
12 December 1984 Replaced bent striker on the East Area Monitor.
12 December 1984 S-2 Annual Reactivity Measurements: Worth of Control I 13 December 1984 Blades.
Repaired bent striker on the replacement spare area 1
l monitor.
I 27 December 1984 S-4 Measurement of Argon-41 Stack Concentration and Measurement of Stack Dilution Air Flow Rate (Pre- l viously A-1 ).
l l l 41
Date Description 27 December 1984 Q-4/Q-5 Radiological Survey of Unrestricted and Re-stricted Areas.
28 December 1984 Q-3 Quarterly Radiological Emergency Drill involving interactions with all outside agencies.
7 January 1985 Replaced the annex evacuation siren motor with a suitable substitute awaiting arrival of a permanent replacement.
8 January 1985 S-7 Semiannual Check (Replacement) of Security System Batteries.
10 January 1985 Replaced all reactor cell ceiling lamps.
16 January 1985 Q-1 Quarterly Check of Scram Functions.
I 17 January 1985 B-1 Biennial Inspection of Incore Reactor Fuel Ele-ments. Both bundles inspected looked to be in good shape.
18 January 1985 Added ~43 gallons of demineralied water to the shield tank following completion of fuel inspection opera-tions.
21 January 1985 S-5 Measurement of Control Blade controlled Insertion Times.
22 January 1985 A-4 Annual Replacement of Control Blade Clutch Cur-rent Light Bulbs.
22 January 1985 S-5 Measurement of Control Blade Controlled Insertion Times.
22 January 1985 S-1 Measurement of Control Blade Drop Times.
24 January 1985 Replaced ink pads on the 12-point temperature re-corder.
24 January 1985 Replaced all three 60 amp fuses on the deep well pump motor.
28 January 1985 Q-2 Calibration Check of Area and Stack Radiation Monitors.
30 January 1985 Adjusted slide wire clamp position on temperature re-corder to assure proper alarm indication.
11 February 1985 Completed overhaul of motor on the purple pen of the 2-pen recorder.
42
I Date Description 13 February 1985 Completed corrective and preventive maintenance on I the 2-pen Brush High Speed Recorder used to perform control blade drop time checks.
13 February 1985 Corrected a jamming problem caused by a protruding screw in the gear mesh system of the purple pen of the two-pen recorder.
I 16 February 1985 Checked feasibility of temporarily installing an am-meter to detect recurrence of sticking safety blade (negative determination).
16 February 1985 Performed visual inspection with the safety blade #3 stuck at ~25% removed to assure sticking blade prob-lem was caused by conditions external to the biologi-cal shield.
20 February 1985 Replaced rupture disk following breakage due to op-erator error; also added ~45 gallons of demineralized water to the primary coolant storage tank.
I 26 February 1985 Disconnected S-3 right angle gear box from drive shaf t and disassembled gear boxes and connections.
Replaced two faulty bearings and installed modified shim material between the two halves of the clutch housing (aluminum versus cork). Completed overhaul of the S-3 motor, clutch, gearbox assembly and checked proper operatloa of blade drive system over full span operating conditions.
1 March 1985 Completed preventive and corrective maintenance on I the S-2 right angle blade drive system external to the biological shield. Replaced the same two bearings on the right angle shaft and installed modified shim material between the two halves of the clutch hous-ing. Completed overhaul of the S-2 motor, clutch, gearbox assembly, raised clutch current and checked proper operation of blade drive system over full span of operating conditions.
2 March 1985 Completed the same preventive maintenance for the S-1 I right angle blade drive system as on the S-2 and S-3 systems to include bearing replacement, shim modifi-cation and raised clutch current.
2 March 1985 Completed the same preventive maintenance on the Regulating Blade (RB) as on the Safety Blades to in-clude bearing replacement and installation of modi-I fied shim material but no adjustment of the clutch current.
43
Date Description 2 March 1985 Completed a final series of tests on all four control blades to include measurement of three full out drop times for each blade, measuremaat of controlled in-sertion and removal times for each blade and assuring I a successful drop from a series of 5-10 random posi-tions over the full range of removal and verifying all clutch currents.
4 March 1985 Cleaned and reterminated all power connections and wires on the deep well pump following failure of -
fuses. Replaced all three (3) 60 amp fuses.
4 March 1985 Replaced Dilution Fan drive belts and filled bearings with oil.
7 March 1985 Cleaned contacts on linear recorder.
7 March 1985 Cleaned contacts on the S-1 blade position indicator following unscheduled shutdown due to position indi-cation coing to zero.
7 March 1985 B-2 Biennial Check to Assure Negative UFTR Void Coef-ficient of Reactivity.
I 7 March 1985 S-2 Annual Reactivity Measurements: Total Excess Reactivity, Reactivity Insertion Rate and Shutdown Margin.
8 March 1985 Cleaned contacts on back of Safety Blade S-3 position indicator inside control console panel.
I 9 March 1985 overhauled temperature recorder print wheel drive system.
12 March 1985 Replaced two 12AX7 tubes in the temperature recorder.
13 March 1985 Q-4/Q-5 Radiological Survey of Unrestricted and Re-I 19 March 1985 stricted Areas.
Added ~20 gallons of demir.eralized water to the i
shield tank. l 27 March 1985 Tightened screws in chart feed of temperature re-carder.
29 March 1985 Q-3 Quarterly Radiological Emergency Drill.
29 March 1985 I A-2 UPTR Instrumentation Calibration Check and Calo-rimetric Heat Balance including partial calorime-tric.
l l
l
\
I l 44
Date Description 4 April 1985 Replaced temporary annex evacuation alarm motor with I a series winding motor to assure sufficient alarm decibel level on the intermittant mode of operation.
I 4 April 1985 Changed out resins in the demineralizers used for makeup.
9 April 1985 Q-2 Calibration Check of Area Radiation Monitors.
25 April 1985 Q-2 Calibration Check of Stack Radiation Monitor.
I 29 April 1985 A-2 UPTR Instrumentation Calibration Check and Calo-rimetric Heal Balance (adjusted the flux control de-mand set point).
30 April 1985 A-2 UFTR Instrumentation Calibration Check and Cal-orimetric Heat Balance (completed the calorimetric heat balance and other adjustments).
7 May 1985 Q-1 Quarterly Check of Scram Functions.
I 15 May 1985 Completed circuit checks for the final drawing of the Vent Diluting Fan Interlock committed to the NRC fol-lowing the February 11-15, 1985 NRC Inspection find-ing drawings not finalized.
16 May 1985 Temporarily switched the leads at the temperature re-I corder for Thermocouples #9 and #10 (Secondary).
20 May 1985 Replaced primary coolant demineralizer resins and ceramic filter cartridges.
3 June 1985 S-4 Measurement of Argon-41 Stack Concentration and Measurement of Dilution Air Flow Rate (Previously A-1).
20 June 1985 Q-4 Quarterly Radiological Servey of Unrestricted Areas.
20 June 1985 Replaced all 60 amp fuses on the deep well pump motor and reterminated motor "b" phase.
I 20 June 1985 Temporarily raised the S-2 control blade clutch volt-age (from 53 to 56 volts) to allow removal following failure to withdraw on demand. Performed successful I series of tests including controlled removal time, controlled insertion time, full out drop time and drop from normal operating position.
21 June 1985 S-1 Measurement of Control Blade Drop Times.
I 21 June 1985 S-7 Semi-ar.nual Check (Replacement) of Security Sys- i tem Batteries.
I 4
l I
l l
.Date Description 24 June 1985 Repaired broken lead wire within the 2-pen recorder switching mechanism to restore the Pu-Be source alarm annunciation.
25 June 1985 Replaced the two-pen recorder balance motor for the red pen.
1 July 1985 Verified withdrawal of S-2 control blade on demand following drop from normal operating position (re-peated 2, 8,16, 22 and 29 July; repeated 5,12, 22 and 26 August).
1 July 1985 Cleaned all contacts of red pen on the two- pen re-corder.
1 July 1985 Replaced two contact brushes on the rotary selector switch of the temperature recorder.
1 July 1985 Cleaned contacts on the S-1 blade position indicator.
2 July 1985 Q-5 Quarterly Radiological Survey of Restricted Areas.
8 July 1985 Reterminated phases and replaced fuses, fuse holders and switches in the fuse box on the deep well pump.
10 July 1985 Replaced selected temperature recorder ink pads.
15 July 1985 Tightened mounting bolts on the core vent fan motor I to reduce vibration.
15 July 1985 Cleaned contacts on chopper for the red y.en of the two-pen recorder.
17 July 1985 Cleaned all contacts on the two-pen recorder follow-I ing cessation of operation forcing an unscheduled shutdown.
17 July 1985 Following a second unscheduled shutdown, replaced a I leaking capacitor and inspected all solder joints and runs as well as repaired several connections as causes of the intermittant failure.
19 July 1985 Installed a new three phase vent fan motor of lower speed and squirrel cage rotor assembly to prevent failures due to excessive vibration.
22 July 1985 Installed a temporaty clamp stop on the vent fan op-erator housing to prevent excessive motion of the op-erator to reopen the damper following shutdown of the system.
I 22 July 1985 Installed a temporary solid state annex evacuation siren until replacement siren is obtained.
46
1 Date Description 22 July 1985 Replaced worn pulley on the diluting fan.
22 July 1985 Repaired and overhauled emergency walkie talkies.
23 July 1985 Q-2 Calibration Check of Area and Stack Monitors.
25 July 1985 Removed the temporary clamp on vent fan damper and installed the new damper motor / operator assembly.
26 July 1985 Replaced fuses in the dilutant fan circuit.
30 July 1985 S-4 Measurement of Argon-41 Stack Concentration.
22 August 1985 S-5 Measurement of Control Blade Controlled Insertion Times.
22 August 1985 Added excessive water to the primary coolant storage tank; replaced core vent line filters.
22 August 1985 Replaced failed flow scram switch in the primary coolant return line caused by connections made during scram checks.
27 August 1985 Replaced the 15 volt power supply for the control blade position indicators.
28 August 1985 Q-1 Quarterly Check of Scram Functions.
47 l
r
VI. CHANGES TO TECHNICAL SPECIFICATIONS, STANDARD OPERATING PROCEDURES AND OTHER DOCUMENTS A. The new Technical Specifications for the UPTR were issued on August 30, 1982 and officially established on September 30, 1982. Two sets of re-quested corrections / changes to the Technical Specifications were sub-mitted to the NRC during the 1982-1983 reporting period. As noted in the 1983-1984 Annual Report, the UFTR facility received approval for Amend-ment No. 14 and No. 15 to the UPTR Technical Specifications during that -
reporting year.
At the end of the 19e4-1985 reporting year, no further requests for changes in the approved Tech Specs are expected for the operation of the UFTR with its present high-enriched fuel at a rated power level of 100 kW th. It is expected that another substantive amendment to the Technical Specifications will be required before the UFTR can be converted from utilizing high-enriched MTR plate-type fuel to utilizing low-enriched SPERT pin-type fuel.
B. Revisions to Standard Operating Procedures All existing UFTR Standard Operating Procedures were reviewed and rewrit-ten into a standard format during the 1982-1983 reporting period as re-quired by a commitment to NRC following an inspection during that year.
As committed to NRC, the final approved version of each SOP (except se-curity response procedures which are handled separately) is permanently stored in a word processor to facilitate revisions and updates which are incorporated on a continuing basis.
Table VI-1 contains a complete list of the approved UPTR Standard Operat-ing Procedures at the end of the previous (1983-1984) reporting year. The latest revision number and date for each non-security related procedure is listed in Table VI-1 During the 1984-1985 reporting year, many changes were incorporated into the UFTR Standard Operating Procedures.
" Technical Change Notices" were issued to correct minor discrepancies or better express the intent of several procedures to include SOP-O.1, SOP-O.4 , SO P- A.6, SOP- D.1 and SOP-C.1.
Fourteen procedures were revised during this reporting year to include I O.2 , A.1 , A. 2 , A. 3 , A.4 , A.7, B.2 , C.1 , C. 3 , D.2 , D.3, D.4 , E.1 and F.7 as a major administrative effort was devoted to updating all SOPS. In some cases the rewritten revision was simply to standarize format and in-corporate several Technical Change Notices. In most cases, there were one or more substantive changes to constitute the revision. All revicions were fully reviewed and approved by the Reactor Safety Review Subcommit-tee as well as facility administration to assure that the operation of the facility and level of protection of the health and welfare of the public are not compromised. Because of the bulk of those revisions of 14 SOPS (over 150 pages) and the fact that they are fully reviewed to assure no reduction of operational safety margins, these revisions are not in-corporated in this Annual Report.
ll 4e
Three (3) new procedures were implemented during the 1984-1985 reporting year. First, in September,1984 af ter review by the Reactor Safety Review Subcommittee, UFTR SOP-C.4, " Assembly and Disassembly of Irradiated Fuel Elements" was approved to document the methods previously used on many occasions but never incorporated into a Standard Operating Procedure.
Second, in March,1985 af ter review and approval by the RSRS, UFTR SOP-D.4 , "10 CFR 50.59 Evaluation anad Determination" was approved to assure proper control of all facility changes and modifications to assure that they do not involve unreviewed safety questions. This O.4 procedure was developed as the first step in responding to the February 11-15, 1985 NRC inspection following which the UFTR Licensee was cited specifically for -
failure to adequately control and document a revision to the reactor con-trol circuit when an interlock was installed which provided for a trip of the diluting fan / vent fan on activation of the evacuation alara, and generally for a failure to adequately implement the guidelines for a Quality Assurance Program as delineated in ANSI Standard N402-1976 ref-erenced in Chapter 17 of the UFTR Safety Analysis Report.
Third, in May,1985 af ter review by the RSRS, UFTR SOP-E.7, " Measurement I of Temperature Coefficient of Reactivity" was approved to document the set method to be used for official temperature coefficient measurements at the UFTR. Previously such measurements were controlled by less de-I tailed instructions. As these three SOP';s ( O. 4 , C.4 and E.7) are all SOP's during this reporting year, the entire text of all three procedures is contained in Appendix B for reference purposes.
Table VI-2 contains a complete listing of the approved UFTR SOPS as of the end of the 1984-1985 reporting year. Again, it is expected that only minor changes will be needed in these SOPS over the next few years. How-I ever, a number of completely new procedures continue under development to address the findings of the February NRC inspection and the requirement that procedures be developed to implement the applicable guidelines of I ANSI Standard N402-1976, " Quality Assurance Program Requirements for Re-search Reactors."
C. Revisions to Other Documents.
First, with regard to the Emergency Plan, following notification of NRC I approval of the revised UFTR Emergency Plan in a letter dated June 4, 1984, a subsequent update of the Plan was submitted to NRC in a letter dated June 25, 1984. The NRC was then notified in a letter dated Septem-I ber 25,1984 that the date on which complete implementation of the UPTR Emergency Plan is considered to have occurred is set as September 21, 1984 Since that date implementation is complete and all requirements I have been imposed.
I I
49
Second, with regard to the Security Plan, no violations or deviations were noted during a routine safeguards inspection on June 24-25,1985 by Region II inspectors. However, as a result of the inspection several l minor discrepancies were noted in the Physical Security Plan (PSP).
. Therefore, in a letter dated July 10, 1985, a proposed Revision 8 of the UFTR Physical Security Plan was transmitted updating quantities of fuel stated to be on hand in several places in the PSP and incorporating the latest versions of all security response procedures. NRC approval and ac-ceptance of this submission as Revision 8 of the UFTR Security, Plan was I
received on July 30, 1985 with only one small portion of a security re-sponse procedure deemed inconsistent and hence rejected and required not to be implemented. Since this inconsistency was only the result of NRC interpretation, there is no problem and the inconsistent portion of the Security Response Procedure in question will be rewritten andd submitted to NRC as proposed Revision 9 to the UFTR Physical Security Plan early in the new reporting year. This proposed change was reviewed by the RSRS and I actually submitted to NRC in a letter dated September 6, 1985. The Plan is withheld from public disclosure.
By letter dated February 16, 1985 the UFTR facility submitted its new I proposed Operator Requalification and Recertification Training Program Plan to replace the one expiring on June 30, 1985. The new program con-tains a provision to repeat training requirements automatically at two I, year intervals to eliminate the need to renew the program every two years. Aside from this change, all other changes were minor from the Pro-gram in use for the previous two years. In an undated letter received on I July 28,1985, notice was received that the new Operator Requalification and Recertification Training Program Plan was accpeted by NRC. The Pro-gram Plan is now being implemented to meet the requirements of 10 CFR 55, Appendix A. This new program is very similar to the previously existing program and is contained in Appendix C for reference purposes.
I I
I I
I ee
TABLE VI-1 LISTING OF APPROVED UFTR STANDARD OPERATING PROCEDURES (August 31, 1984)
O. Administrative Control Procedurev 0.1 Operating Document Controls (REV 0, 2/83) 0.2 Control of Maintenance (REV 2, 4/83)
I A. Routine Operating Procedures I A.1 A.2 A.3 Pre-operational Checks (REV 12,1/83)
Reactor Startup (REV 9, 4/83)
Reactor Operation at Power (REV 9, 10/82)
A.4 Reactor Shutdown (REV 8, 10/82)
A.5 Experiments (REV 3, 4/83)
A.6 Operation of Secondary Cooling Water (REV 1, 10/82)
A.7 I
Determination of Control Blade Integral or Differential Reactivity Worth (REV 0, 3/82)
B. Emergency Procedures B.1 Radiological Emergency (REV 3, 4/8'3)
B.2 Fire (REV 7, 4/83)
B.3 Threat to the Reactor Facility (Expanded into F-Series Procedures) i B.4 Flood (REV 1, 4/83)
C. Fuel Handling Procedures C.1 Irradiated Fuel Handling (REV 3, 4/83)
C.2 Fuel Loading (REV 4, 4/83)
C.3 Fuel Inventory Procedure (REV 2, 4/83)
D. Radiation Controls Procedures D.1 Radiation Protection and Control (REV 3, 4/83)
D.2 Radiation Work Permit (REV 8, 4/83)
D.3 Primary Equipment Pit Entry (REV 1, 4/83)
D.4 Removing Irradiated Samples From UFTR Experimental Ports (REV 2, 4/83)
E. Maintenance Procedures E.1 Changing Primary Purificatien Demineralizer Resina (REV 2, 4/83)
E.2 Alterations to Reactor Shielding and Graphite Configuration (REV 2, 4/83)
E.3 Shici i Tank and Shield Tank Recirculation System Maintenance (REV 2, 4/83)
I E.4 E.5 Withdravn W:.thdraw n i E.6 Argon-4' Concentration Measurement (REV 0, 1/84) 1 I
l l 51 I
1 l
1 F. Security Plan Response Procedures (Reactor Safeguards Material, Disposi- l tion Restricted)
P.1 Physical Security Controls F.2 Bomb Threat i F.3 Theft of (or Threat of the Theft of) Special Nuclear Material )
P.4 Civil Disorder F.5 Fire or Explosion F.6 Industrial Sabotage F.7 Procedure Controls (Original)
I I
I ,
l l
l l
lI l
I 52
TABLE VI-2 LISTING OF APPROVED UFTR STANDARD OPERATING PROCEDURES (August 31, 1985)
O. Administrative Control Procedures 0.1 Operating Document controls (REV 0, 2/83) 0.2 Control of Maintenance (REV 3, 5/85) 0.4 10 CFR 50.59 Evaluation and Determination (REV 0, 3/85)
A. Routine Operating Procedures '
A.1 Pre-operational Checks (REV 13, 6/85)
A.2 Reactor Startup (REV 11, 5/85)
A.3 Reactor Operation at Power (REV 10, 5/85)
I A.4 A.5 A.6 Reactor Shutdown (REV 9, 6/85)
Experiments (REV 3, 4/83)
Operation of Secondary Cooling Water (REV 1, 10/83)
A.7 Determination of Control Blade Integral or Differential Reactivity Worth (REV 1, 6/85)
B. Emergency Procedures B.1 Radiological Emergency (REV 3, 5/83)
B.2 Fire (REV 5, 5/85)
B.3 Threat to the Reactor Facility (Expanded into F-Series Procedures)
B.4 Flood (REV 1, 4/83)
C. Fuel Handling Procedures C.1 Irradiated Fuel Handling (REV 4, 2/85)
C.2 Fuel Loading (REV 4, 4/83)
C.3 Fuel Inventory Procedure (REV 3, 2/85)
C.4 Assembly and Disassembly of Irradiated Fuel Elements (REV 0, 9/84)
D. Radiation Controls Procedures D.1 Radiation Protection and Control (REV 3, 1/83)
D.2 Radiation Work Permit (REV 9, 5/85)
D.3 Primary Equipment Pit Entry (REV 2, S/85)
D.4 Removing Irradiated Samples From UFTR Experimental Ports (REV 3, 5/85)
E. Maintenance Procedures E.1 Changing Primary Purification Demineralizer Resins (REV 3, 6/85)
E.2 Alterations to Reactor Shielding and Graphite Configuration (RFt* 2, 4/83)
- E E.3 Shield Tank and Shield Tank Recirculation System Maintenance (REV 2, E 4/83)
E.4 Superceded i E.5 Superceded l E.6 Argon-41 Concentration Measurement (REV 0, 1/84)
E.7 Measurement of Temperature Coefficient of Reactivity (REV 0, 5/85) 1 53 l
J l
F. Security Plan Response Procedures (Reactor Safeguards Material, Disposi-tion Restricted)
F.1 Physical Security Controls (Confidential, except for UFTR Form SOP-F.1A)
F.2 Bomb Threat (Confidential, except for UFTR Form SOP-F.2A)
I F.3 P.4 Theft of (or Threat of the Theft of) Special Nuclear Material (Con-fidential, except for UPTR Form SOP-F.3A)
Civil Disorder (Confidential) ,
F.5 Fire or Explosion (Confidential)
F.6 Industrial Sabotage (Confidential)
F.7 Security Procedure Controls (REV 1, 9/84) -
l l
t r
ll 54
VII. RADIOACTIVE RELEASES AND ENVIRONMENTAL SURVEILLANCE This chapter summarizes the gaseous, liquid and solid radioactive releases from the UFTR facility for this reporting year. Argon-41 is the primary gas-cous release while there was no measureable liquid release and no solid re-lease at all. Finally, this chapter includes a summary of personnel exposures at the UFTR facility.
A. Gaseous (Argon-41)
The gaseous releases from the UPTR Facility for this reporting year are
~
summarized in Table I. The basis for the gaseous activity release values is I
indicated in Table II. These values are obtained by periodic measurements of stack concentrations as required by Technical Specifications.
TABLE I UFTR GASEOUS RELEASE
SUMMARY
Month Release Average Monthly Concentration September , 1984 9.45 x 106 pCi/ Month 3.33 x 10-9 pCi/ml October, 1984 9.49 x 106 pCi/ Month 3.34 x 10-9 pCi/ml November, 1984 1.14 x 10 7 pCi/ Month 4.01 x 10-9 pCi/ml December , 1984 7.10 x 106 pCi/ Month 2.54 x 10-9 pCi/ml January , 1985 8.18 x 106 pCi/ Month 2.92 x 10-9 pCi/ml 0.00 x 106pCi/ Month 0.00 x 10-9 pCi/ml I
February, 1985 March, 1985 1.33 x 10 7 pCi/ Month 4.77 x 10-9 pCi/ml April, 1985 1.93 x 10 7 pCi/ Month 6.73 x 10-9 pCi/ml May , 1985 1.14 x 10 7 pCi/ Month 4.09 x 10-9 pCi/ml June, 1985 1.76 x 10 7 pCi/ Month 6.27 x 10-9 pCi/ml July, 1985 2.51 x 10 7 pCi/ Month 8.96 x 10-9 pCi/ml August, 1985 9.92 x 10 6pCi/ Month 3.47 x 10-9 pCi/ml TOTAL ARGON-41 Releases................................ 142.2 Ci AVERAGE ARGON-41 Release Concentration...... 4.20 x 10-9 pCi/ml UFTR Technical Specifications require average Argon-41 release concentra-tion averaged over a month to be less than 4.0 x 10-8 pCi/ml. Total releases and average monthly concentrations are based upon periodic Argon-41 release concentration measurements made at equilibrium full power (100 Kw) conditions.
I The results for these experimental measurements used in calculating the gas-cous Ar-41 release data are summarized in Table II.
55
TABLE II UFTR GASEOUS RELEASE DATA BASE Releases Per Unit Instantaneous Argon-41 Months Energy Generation Concentration at Full Power Sept. '84 - Dec. '84 3740.9 pCi/Kw-hr 9.49 x 10-8 pCi/ml Dec. '84 - May '85 3496.8 pCi/kw-hr 9.00 x 10-8 pCi/ml June '85 5674.6 pCi/kw-hr 14.59 x 10-8 pCi/ml July '85 - Aug '85 5144.2 pCi/kw-hr 13.24 x 10-8 pCi/ml B. Liquid Waste from the UFTR/ Nuclear Sciences Complex There were approximately 64,100 liters discharged from the liquid waste holdup tanks to the campus sanitary sewage system during this reporting I period. For this period there was only one single batch discharge as summa-rized here:
I Month Volume (liters)
Concentrations (pci/ml)
February, 1985 64,100 NDA I NDA denotes no detectable activity where the minimum detectable activity (MDA) is 3.5 x 10-9 pCi/ml.
The effluent dischargad into the holding tanks comes from twenty labora-tories within the Nuclear Sciences Center as well as the UFTR complex. The UFTR normally releases approximately 1 liter of primary coolant per week to the holding tank as waste from primary coolant sampling. The average activity I for this coolant was 2.00 x 10~7 pCi/ml (6 - y) and 1.6 x 10-8 pCi/ml (a) for this 1984-1985 annual reporting period.
C. Environmental Monitoring I The UFTR maintains film badge as well as thermoluminescent dosimeter monitoring (new for the 1982-1983 reporting period) in areas adjacent to and in the vicinity of the UPTR complex. The badge and TLD cummulative totals for this reporting period from September 1984 through August 1985 are summarized
, in Table III.
l l
l 56
1 I
TABLE III ,
CUMMULATIVE RESULTS OF ENVIRONMENTAL MONITORING l I
FOR THE 1984-1985 REPORTING YEAR Film Badge Total Yearly Total Yearly Designation Exposure (mrem)III TLDs[2] Exposure (mrem) Ell A1 M 1 M '
A2 40 2 M I
A3 M 3 M A4 M 4 M A5 M 5 M A6 M 6 M I A7 M 7 8
9 M
M M
I 10 11 12 M
M M
Note 1: M denotes minimal (<10 mrem) meaning background only.
Note 2: The first seven TLDs are attached adjacent to the corresponding num-bered film badge monitors.
I D. Personal Radiation Exposure The maintenance vork to replace all six (6) thermocouples and provide new terminated connections in the core coclant exit lines necessitated higher fa-cility personnel exposures than in most years. In all cases workers and work were controlled using Radiation Work Permits to ensure adoquate monitoring of whole body as we?1 as extremity doses using dosimters as well as badges with redundant dosimeters and TLD badges to assure adequate records. UFTR-asso-I ciated personnel exposures significantly greater than minimum detectable dur-ing the reporting period are summarized in the following two tables.
Table IV lists monthly permanent badge exposures recorded above back-ground. Table V lists results c f ring and other specialized badges utilized to record dose, especially to the extremities, during the thermocouple replace-ment and rotermination project.
For visitors, students, or other non-permanent UPTR personnel, no indivi-dual had a non-zero dosimeter exposure measurement above 10's allowable for this reporting period. In most cases, the values of one or two mrem recorded dosimeter exponures are probably due to uncertainty in reading the devices, r
i l
l 57 l
I I TABLE IV I PERMANENT BADGE EXPOSURE REPORTED ABOVE BACKGROUND September, 1984 P.M. Whaley 10 mrem deep /whole body G.W. Fogle 30 mrem deep /whole body October, 1984 .
I P.M. Whaley C.J. Stiehl H. Gogun 340 mrem 180 mrem 120 mrem deep /whole body deep /whole body deep /whole body November, 1984 P.M. Whaley 20 mrem fast neutron January, 1985 H. Gogun 10 mrem deep /whole body G.W. Fogle 10 mrem deep /whole body February, 1985 H. Gogun 10 mrem deep /whole body P.M. Whaley 10 mrem deep /whole body March, 1985 C.J. Stiehl 10 mrem deep /whole body May, 1985 P.M. Whaley 20 mrem deep /whole body W.G. Vernetson 130 mrem fast neutron
- l I
- NOTE: During the month of May when the 130 mrem fast neutron exposure was
- recorded for Dr. Vernetson, he was involved in no activities which l could have produced this dose. Therefore, it is assumed that this re-corded dose was due to scme error in reading the badge. This is espe-cially true since Dr, Vernetson was certainly not exposed to fast neu-trons and there wac no other dose recorded.
lI l
lI I
g ,e
I TABLE V SPECIALIZED TLD BADGE READINGS RECORDED DURING THE THERMOCOUPLE REPLACEMENT PROJECT I Name Date TLD Badge No. Badge Location Radiation Dose (mrem)
I H. Gogun 5 Oct 84 R-1 Left Wrist 313 -
H. Gogun 5 Oct 84 R-2 Right Wrist 863 H. Gogun 5 Oct 84 R-3 Forehead 161 H. Gogun 5 Oct 84 R-4 Right Ankle 91 H. Gogun 5 Oct 84 R-5 Whole Body (Chest) 78.6 P.M. Whaley 5 Oct 84 R-6 Forehead 136 P.M. Whaley 5 Oct 84 R-7 Left Hand 430 P.M. Whaley 5 Oct 84 R-8 Right Hand 499 C.J. Stiehl 5 Oct 84 R-9 Forehead 76 C.J. Stiehl 5 Oct 84 R-10 Right Hand 308 H. Gogun 5 Oct 84 A Left Hand 727 H. Gogun 5 Oct 84 B Right Hand 1976 C.J. Stiehl 5 Oct 84 C Left Hand 657 C.J. Stiehl 5 Oct 84 D Right Hand 588 P.M. Whaley 8 Oct 84 R-1 Left Wrist 237 P.M. Whaley 8 Oct 84 R-2 Right Wrist 196 P.M. Whaley 8 Oct 84 R-3 Forehead 86 P.M. Whaley 8 Oct 84 R-4 Whole Body (Chest) 72 P.M. Whaley 8 Gct 84 R-5 Right Ankle 193 P.M. Whaley 8 Oct 84 E Left Hand 669 P.M. Whaley 8 Oct 84 P Right Hand 830 I 59
VIII. EDUCATION, RESEARCH AND TRAINING UTILIZATION NOTE: The participating students are indicated with an *. Other participants are faculty or staff members of the University of Florida, unless specifically designated otherwise. A ** indicates those students work-ing on theses or dissertations.
NAA Research - Elemental Analysis of Silver Diffusion in Glass Slides, D r. V.
Ramaswamy, I. Najafi**, G. Welch *.
In analyzing and evaluating a novel electrolytic process involving ion-ex-changed waveguides for small signal processing applications, it becomes neces-sary to measure the profile of silver diffused in glass slides and also to determine the elemental composition of the glass slide. Therefore, NAA is being applied for short and long irradiation intervals and the activity of the slides measured afterwards. This work has proceeded well. Slides have been ac-tivated, thin layers removed and the activity remeasured due to key elements such as the diffused silver. This last step of layer removal is repeated until no silver is detected. This work is producing good results to date and is ex-pected to continue with periodic usage of the UFTR.
I NAA Research - Neutron Activation Analysis of Seagrass Community Components -
Dr. G. Chiu (UWF), Dr. Ranga Rao (UWF), Dr. W.G. Vernetson, D. Morton* (UWF),
L. Hung *, S. Kahook*, Reactor Staf f.
Various seagrass communities have been exposed to used drilling fluids off the gulf coast of northwest Florida. The components of one of these communities consisting of sediments, water samples, grasses, shells and shellfish meats have been subjected to long and short irradiations to monitor the uptake of certain heavy metals, principally barium and chromium, both of which are suit-able for detection using neutron activation analysis. Reactor time for this work is supported under the DOE Reactor Sharing Program. Results to date are encouraging and work is continuing.
NAA Research - Neutron Activation Analysis of Estuary Sediments - Dr. R. Byrne (USF-St. Petersburg), Dr. G. Smith (USF-St. Petersburg), S. Kahook*, Reactor Staff.
Under the DOE Reactor Sharing Grant, Instrumental Neutron Activation Analysis will be applied to estuary sediments from the Tampa Bay reegion of Florida to determine and quantify the spatial distribution of various rare earth metals.
Work to date has been restricted to preparatory work as well as an exercise mapping the spatial variation of the flux in the UPTR vertical ports and an-other exercise to determine accurate values for the cadmium ratios for ports to be used in the activations for this research. These are key parameters be-cause of the resonance absorption characteristics of many rare earth metals.
The NAA work on this project is expected to begin in the upconing reporting l
' year as sample preparations are now completed and a new sample holder to hold multiple samples in the UFTR center vertical port care region has been manu-factured. In addition, virgin teflon tube sample holders have been demon-strated to withstand extended reactor runs and have been analyzed for impurity content using NAA.
Il ee
I NAA Research - Neutron Activation Analysis of Hogtown Creek Samples - Dr. W.G.
Vernetson, P.M. Whaley, J. Carswell**, S. Kahook*, Reactor Staff.
Hogtown Creek flowing through Gainesville is subject to various pollution sources. Neutron Activation Analysis is being applied to evaluate and quantify the presence of certair. suspected elemental pollution indicators (chlorine, copper and chromium) at various points in the Hogtown Creek flow system. NAA I is being performed on water samples as well as selected soil and plant samples at various stages in the creek's drainage system. Results to date do show ele-vated levels of some elemental indicators, especially chromium but this work is incomplete. Additional work will be required to determine the source of the contamination after quantification. Work to date formed the basis for training a high school student in research methods under the 1984 Florida Foundation of I
Future Scientists summer high school student research program. The results ob-tained to date were presented as a science fair project which reached the state regional finals.
NAA Research - Neutron Activation Analysis of Marine Sediments - Dr. J.H.
Trefry, S. Metz*, R. Trocine*, Dr. W.G. Vernetson, Reactor Staff.
Under the DOE Reactor Sharing Grant, instrumental neutron activation analysis is being applied to marine sediments from the Gulf of Mexico and the Florida Atlantic Coast to obtain the spatial distribution of selected metals. Results of the work conducted at the UFTR facility under the Reactor Sharing Program are encouraging and the work is expected to continue with journal publications to follow at intervals.
I NAA Research - Comparative Analysis of Zinc Content In Human Hair, Dr.
Vernetson, M. Adams *, P.M. Whaley, S. Kahook*.
W.G.
Various human hair samples were irradiated for neutron activation analysis and referenced to NBS standards. The same human hair was also analyzed using an-other method, atomic absorption spectroscopy. This project involved a compara-tive evaluation of the two methods of trace element analysis to determine I which would be most advantageous for such human hair evaluations. Work to date formed the basis for training a high school student in research methods under the 1985 Florida Foundation of Future Scientists summer high school student research program. The results to date were presented at the Summer FFFS ses-sions and are good enough to be invited to be presented at the 1986 Junior Science, Engineering, and Humanities Symposium.
NAA Research - Neutron Activation Analysis of a Seagrass Bed Exponed to Dril-ling Fluids, Dr. C.N. D'Asaro (UWF), Dr. T. Duke (UWF), R. Montgomery ** (UWF),
S. Macauley* (UWF). D. Morton* (UWF), S. Kahook*, L. Hung *, Reactor Staf'.
This project involves moving cores from a seagrass bed to the laboratory where they are exposed to various drilling fluids to determine possible effects on seagrass community structure and biomass. Barium and chromium are present in the drilling fluids and are known tc impact negatively on animals and plants.
However, knowing the correct concentrations of these metals In critical in or-I der to correlate observed effects with metal concentrations to explain the phenomena involved. Use of the UFTR facility for the irradiation and subse-quent NAA provides an ef fective means of performing the chemical analyses.
61
I I NAA Research - Neutron Activation Analysis of Various Treated and Untreated Water Sources, Dr. K. Williams, Dr. W.G. Vernetson, Z. Molosevick*, S.
Kahook*, Reactor Staff.
Neutron activation analysis of various treated and untreated water sources was undertaken as part of a radiochemistry laboratory course. A more careful analysis of city water, well water and various other demineralized and other-I wise purified water sources will be undertaken as this work is continued pe-riodically. The objective will be to quantify trace element contaminants in these water sources for general usage in chemical analysis.
NAA Research - Trace Element Analysis of Human Blood Scrum and Bone Marrow .
Samples, Dr. G.S. Roessler, Dr. W.E. Bolch.
Blood and serum samples have been analyzed for trace element concentrations from sick as well as healthy patients relative to Leukemia. Results have also been compared with standards. The objective is to correlate trace element con-I centrations (high or low) with certain diseases. The initial project in this series has been completed and a proposal was submitted to support continuing work during the last reporting year; future studies in this area are planned with the level of effort dependent on response to the proposal.
NAA Research - Analysis of Hair Samples for Trace Elenents, Dr. G.S. Roessler, Dr. W.G. Vernetson, P.M. Whaley, L. Hung *, S. Kahook*.
Human hair samples are irradiated for various time periods. The activated sam-I ples are then spectral analyzed using minicomputer methodology to determine and identify abnormal and elemental composition. Following several irradia-tions as part of a laboratory experiment and demonstration of neutron activa-tion analysis techniques, this project has been proceeding at a very slow pace I awaiting additional funding based on development of better analytical and ex-perimental techniques.
I UFTR Core Redesign (LEU Program) - Neutronics Analysis for UFTR Core Redesign
- Dr. E.T. Dugan, Dr. W.G. Vernetson, Dr. N.J. Diaz, P.M. Whaley, S. Baker.
I As part of the DOE Low Enriched Uranium Conversion Program, investigations have been performed on the UFTR to determine the feasibility and desirability of replac-ing the 93% enriched MTR plate type fuel with 4.8ts enriched, cylin-drical SPERT fuel pins. For this redesign, the only permanent structural modi-I fication is the insertion of new grid assemblies into existing fuel boxes. Ac-ceptable neutronic criteria (Possible keff range, maximum flux and degree of undermoderation) have been determined using industry-accepted, 4-group cross I cections in one, two and three-dimensional diffusion theory calculations of k,gg, flux profiles, pcwer peaking factors and coefficients of reactivity.
First order perturbation calculations have been used to determine key kinetic
- parameters. Neutronic results to date indicate that the UPTR/SPERT core rede-sign can be acconunodated to meet requisite neutronic criteria with an actual increase in peak thermal flux levels which will be very useful for NAA and l other research projects requiring high thermal flux levels.
I i e2
I UFTR Core Redesign (LEU Program) - Thermal-hydraulic Analysis for Core Rede-sign - Dr. E.T. Duga1, Dr. W.G. Vernetson, Dr. N.J. Diaz.
As part of the DOE LEU Conversion Program, thermal-hydraulic analysis related to redesign of the UFTR core using SPERT fuel rods has been performed. Com-puter analysis has been undertaken to evaluate the UFTR/SPERT design for steady-state conditions as well as transients arising in response to a step insertion of reactivity, a loss of coolant flow, and a loss-of-coolant acci-dent. Results to date indicate required safety margins and transient response conditions can be maintained with the UPTR/SPERT core design.
UFTR Transient Analysis - Implementation of DSNP Program Language to Analyze -
UFTR Operational Trarisients - Dr. E.T. Dugan, Dr. W.G. Vernetson, J. Samuels**.
The Dynamic Simulator for Nuclear Power (DSNP) Plants programming language is being implemented to analyze selected UPTR heat up and cooldown transients.
Results from DSNP calculations are being compared and evaluated relative to existing and new transient UFTR output recorded on various output devices.
This analysis will serve as a teaching aid for the DSNP programming language and will hopefully allow fast-running analysis of UPTR transients for class exercises and other similar applications within the Nuclear Engineering Sciences Department.
I UFTR Reactor Operations and NAA Lab Exercises - Dr. W.G. Vernetson, G.
Stepheason/R. Rawls (CFCC), Dr. M. Lombardi/D. Fricks (HCC), Dr. S. Marchionno (SFCC), P.M. Whaley, S. Kahook*, Reactor Staff.
Mini-courses have been developed and presented as part of the UFTR DOE Reactor Sharing Program to provido practical reactor operations and health phycies I
training as well as NAA laboratory experience for groups of students from Cen-tral Florida Community College Radiation Protection Technology program, Santa Fe Community College Nuclear Medicine Technology / Radiologic programs and the Hillsborough Community College Nuclear Medicine / Allied Health Technology pro-grams.
Cerenkov Noise Detector Development - Development of a Detector of Reactor Core Perturbations - Dr. E.E. Carroll, Prof. G.J. Schoessow, H. Carvajal**,
C. Levy *, N. Yunessi*, D. Lin*, Reactor Staff.
A new design Cerenkov detector is being developed and tested using the prompt-I gamma radiation deriving from the reactor core. The detector is being located in the thermal column entrance port with shielding plugs removed and substi-tuted by lithiated paraffin plugs made for the purpose of reducing the neutron flux to acceptable values when the reactor is running at power. Samples of these lithiated paraffin plugs were irradiated to assure that no unexpected activation products would be formed were the plugr. to see a large flux. Other work has involved spectroscopic analysis of the gamma energies emitted from the thermal column where the detector will be placed. The Cerenkov detector has been moved at various angles for various power levels with the ultimate objective to develop a detector system that is able to detect reactor pertur-bations at various power levels through largo thicknesses of material by means of high-energy, penetrating, fission-produced gamma rays. The work to date has produced a doctoral dissertation and results are encouraging.
Il es
I Reactor Physics - Determination of Relative Flux Profiles In Several UFTR Ports, Dr. W.G. Vernetson, P. Sakornsin*, P.M. Whaley, S. Kahook*.
Several UFTR ports for which currently accurate flux profiles were not avail-able were mapped using bare and cadmium covered foils. The results of this work are of interest because of a research project scheduled to use the mapped I ports in the near future for NAA of rare earth samples. This work formed the basis for training a high school student in research methods under the 1985 Florida Foundation of Future Scientists summer high school student research program.
Optical Physics Research - Analysis of Thermal heutron Induced Lattice Distur-bances in Dielectric Materials, Dr. H. Plendl (FSU), Dr. P. Gielisse (FSU), J.
Rink * (FSU).
Various types and cuts of dielectric materials, primarily topaz, have been I subjected to various thermal neutron fluences in the UFTR. The objective of this work is to analyze the response of the material lattice to the distur-bances caused by the various components of the radiation field to include thermal neutrons, f ast neutrons and gamma rays. Comparisons are being made with previous results of irradiations with x-rays and electrons and with ther-mal neutrons, all in isolation. The purpose of the work is to gain a compre-hensive understanding of how certain dielectrics such as A1 (SO4)(OH) 2 and similar lattices respond to different types of radiation in the generation and destruction of color sites.
Optical Physics Research - Dr. P. Gielisse, LTE Ltd.
Various types and cuts of Toper dielectric material are being subjected to re-latively high fluence in the UPTR and to a pure Co-60 source. The objective is to provide predictive explanations of how and why color centers are generated, why some are more lasting than others, and hopefully how to use basic physics of irradiations to enhance and conserve selected color centers.
I UFTR Risk Assessment - Dr. W.G. Vernetson, R. Griffith*.
A preliminary probabilistic risk assessment of the University of Florida Training Reactor has been conducted. This project has determined an estimato of the probability of occurrence of a set of postulated maximum credible UFTR accidents. The results will be used to show that the UPTR poses no significant risk to the general population and environment around the UPTR and has demon-strated proficiency in PRA analyses as additional PRA projects are undertaken.
Specifically, research is continuing to obtain better data for the maximum credible accidents and extend the methodology to examine risk associated with less serious but higher probability UFTR-related accidents. This project is active on a reduced level at present.
l I
64
I l
UFTR Operator Training and Requalification - Dr. W.G. Vernetson, Reactor Staff. l Lectures and hands-on operations on the reactor are necessary to license oper-I ators for the UPTR. The requalification pgogram establishes a required number of startups, weekly checks, daily checks, drills, practical exercises and lec-tures for each operator. Operator participation is mandatory in order to main-tain assurance of proficiency levels and to be able to deranstrate the requi-site operator skills. Operation proficiency is assured by :ritten and oral tests as well as observed practice exercises.
Utility Operator Training - Hot License SRO Candidate Training for Florida Power Corporation, Dr. W.G. Vernetson, M. Penovich (FPC), P.M. Whaley, Reactor Staff.
A correlated set of ten reactor operations exercises was conducted at the UFTR console for two (2) degreed FPC personnel preparing for tha SRO examination.
I This abbreviated program is only conducted for degreed SRO condidates and as-sures each trainee of the requisite 10 startups and 10 shutdowns during the course of an intensive 20 hour2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> (2-3 days) trainine course. All records are maintained pennanently and were also supplied to PPC to support the licensing I of these twa SRO candidates.
Utility Operator Training - Hot License Candidate Reactor Operator Training I for Florida Power Corporation, Dr. W.G. Vernetson, Whaley, G. Welch *, Reactor Staff.
M. Penovich (FPC), P.M.
I A three week intensive course consisting of a correlated set of lectures, reactor operations exercises and hands-on practice at the UFTR console is uti-lized as one of the training segments in the licensing of reactor operators for the FPC Crystal River 3 nuclear power plant. All trainees receive credit I for performing a minimum of 10 startups and 10 shutdowns of the UPTR during the course. All records are maintained permanently and were also supplied to TPC to support the licensing effort.
Reactor Operations Course Instruction and Demonstrations Course Instructor ENU-3002 Dr. R.T. Schneider ENU-4104 Dr. A.M. Jacobs ENV-4201/5206 Dr. C.E. Roessler ENV-4241 Dr. C.E. Roessler ENU-5005 Dr. R. Pagano I ENU-5005 CHS-5110L ENV-6211 Dr. A.M. Jacobs Dr. K. Williams Dr. C.E. Roessler ENV-6211L Dr. W.E. Properzio I e
NAA Research - Rabbit System Remote Handling Facility Development and Imple-mentation - Dr. G.S. Roessler, Dr. W.G. Vernetson, Reactor Staff.
Radiation and contamination surveys are performed in the radiochemistry labo-ratory where the new NAA Instrumentation and Counting Facility has been uti-lized. Periodic checkouts are conducted of the " Rabbit" facility to assure of-ficient rapid transfer for remote sample insertion and removal from the UPTR core region especially when new rabbit capsules are first utilized. To handle the sample volume more ef ficiently for Neutron Activation Analysis, ef forts are currently directed to obtaining and implementing a better computer-based analyzer system.
Gaseous Release Determinations - Argon-41 Stack Measurements - Dr. W.G.
Vernetson, Dr. W.E. Bolch, P.M. Whaley*, Reactor Staff.
A cobalt-60 Standard Sample has been applied in standardized controlled mea-surements of radioactivity (Ar-41) in stack effluent. A direct detailed stan-dard operating procedure (UPTR-SOP-E.6: Argon-41 Concentration Measurement) has been developed and approved as the best practicable evaluation of Ar-41 releases from the UPTR facility as required by UFTR Technical Specification on Effluents Surveillance in Section 4.2.4, Paragraph (2). Application of this SOP continues to obtain a statistically significant number of data points and eventually to investigate the effect of variable core vent flow on total Ar-41 I releases. Other commitments during this reporting year have limited progress on this project.
Nuclear Engineering Laboratory I - (ENU-4505L) - Dr. E.E. Carroll , Jr. , Reac-tor Staff.
ENU-4505L is the nuclear engineering laboratory for undergraduate senior level students in Nuclear Engineering Sciences. The UPTR is used for a variety of exercises and experiments, including radiation dose measurements, measurement of induced radioactivity and reactor physics parameters as well as operational measurements.
Nuclear Engineering Laboratory II - (ENU-6516L) - Dr. J. Cox, Reactor Staff.
ENU-6516L is the main laboratory course for Nuclear Engineering graduate stu-dents. It involver; radiation and reactor-related measurements and experimenta-tion on a more advanced level than ENU-4505L particularly in applying compu-ters for acquisition of data and subsequent analysis of that data as part of the laboratory report requirements. During the current year one project in this course involved development of a pile oscillator with which preliminary core characteristics were determined with followup planned the next time this course is taught.
66
ll I Reactor Operations Laboratory (ENU-4905/6937L) - Dr. Vernetson, Reactor Staff.
Students of the Reactor Operations Lab spent about three (3) hours weekly at the controls of the UFTR performing reactor operations under supervision of licensed reactor operators. The lab encompasses training in reactivity manipu-lations, reactor checkouts, operating procedures, standard and abnormal opera-tions and all applicable regulations. Specific exercises directed toward de-velopment of understanding of light water power reactor behavior are included as this laboratory course serves as basic preparation for students entering the utility industry in the test and startup as well as plant operations areas. When this course is not interrupted by outages, students perform a series of exercises designed to assure them of conducting 10 startups and 10 shutdowns. A special effort is made to correlate UFTR exercises with various aspects of LWR operations.
Reactor Operations - (ENU-5176L) - Dr. E.T. Dugan, Dr. W.G. Vernetson , Reactor Staff.
Students in the reactor operations course spend about two hours weekly at the controls of the UPTR performing reactor operations under supervision of li-censed reactor operators. The lab encompasses training in reactivity manipula-tions, reactor checkouts, operating procedures, standard and abnormal opera-tions and all applicable regulations. Specific exercises directed toward de-I velopment of understanding of light water power reactor behavior are included as this laboratory course serves as basic preparation for students entering the utility industry in the test and startup area as well as plant operations.
I A special effort is made to correlate UFTR exercises with the classroom lec-tures on various aspects of LWR operations. This course was not offered during the current reporting year.
Radiation Protection Training - Reactor Operations Based Radiation Protection Health Physics Cooperative Work Training Program, Dr. W.G. Vernetson, G.
Stephenson (CFCC), R. Rawls (CPCC), Reactor Staff.
A set of reactor operations based radiation protection health physics coopera-tive work training exercises have been developed to meet the cooperative work I needs of Radiation Protection Technology students at Central Florida Community College (CFCC). Two of these courses were conducted during this reporting year with great success. Students who take these courses are well suited to work as radiation control technicians and health physics assistants at nuclear power plants. The exercises are also extremely adaptable and some of them have been upgraded and used in the graduate health physics laboratory course at the Uni-versity of Florida. The development of this course and its subsequent presen-I tation to CFCC students has been partially supported under the UFTR DOE Reac-tor Sharing Program and has been a valuable rescurce in the effort to increase reactor utilization.
( Radiation Protection and Control Health Physics Field Exercises - (ENV-6211L)
- Dr. C.E. Roessler, Dr. W.E. Properzio, D. Munroe, H. Norton, M. DesRoches.
l Reactor Staff.
1 This course provides students in various disciplines with practical experience in radiation protection and control such as performing radiation surveys in and around the UPTR cell and environs, calibrating area radiation monitors, etc. These exercises also serve as training for radiation control technicians.
67
l I IX. THESES, PUBLICATIONS, REPORTS AND ORAL PRESENTATIONS OF WORK RELATED TO THE USE AND OPERATION OF THE UFTR I 1 "Out-of-Core Gaseous Cerenkov Detector for Reactor Noise Analysis," H.
Carvajal-Osorio and E.E. Carroll, Trans. Amer. Nucl. Soc. , 47, p. 427, November, 1984
- 2. " Reactor Operations Training Program Manual for Florida Power Corporation SRO Candidates ," W.G. Vernetson , November, 1984.
3 " Annual Progress Report of the University of Florida Training Reactor for '
September 1, 1983 - August 31, 1984 Reporting Year," W.G. Verretson, November, 1984 4 " Ion-Exchanged Waveguides for Small Signal Processing Applications - A Novel Electrolytic Process," V. Ramaswamy and I. Najafi, proposal sub-mitted to various agencies, September - December, 1984.
- 5. " Nuclear Reactor Operations Training Manual for Florida Power Corporation Hot License Reactor Operator Candidates," W.G. Vernetson, December, 1984.
6.
I " Effects of Drilling Fluids on an Experimental Seagrass (Thalassia testudinum) Community: Potential for Bioaccummulaton of Barium and Chrortium ," Dana Morton , Masters' Thesis in Biology Department, University of West Florida, Pensacola, degree expected December,1985*.
- l. " Summary and Certification Report for the Florida Power SRO Reactor Opera-tions Training Program Conducted November 27-29, 1984," Nuclear Facili-ties Division, University of Florida, January 4, 1985.
8 " Winter Semester Reactor Operations Laboratory Manual for ENU-4905/6937L,"
W.G. Vernetson, January, 1935.
- 9. " Summary Evaluation Report of the Florida Power Corporation Reactor Opera-tions Training Program Conducted December 3 - December 21, 1984," Nuclear Facilities Division, University of Florida, February 15, 1985.
- 10. " Application of Neutron Activation Analysis to Determine the concentration of Copper, Chromium and Chlorine in Environmental Samples," John E.
Carswell, Science Fair Project based on work as participant in summer, 1984 Florida Foundation of Future Scientists research program, Nuclear Facilities Division, University of Florida, February, 1985.
- 11. " University of Florida Reactor Sharing Program," W.G. Vernetson, proposal submitted to Department of Energy, March, 1985.
- 12. "A Neutronics Study of the Core Conversion From HEU to LEU Fuel For the University of Florida Training Reactor (UFTR)," R. Scott Baker, paper presented at the Eastern Regional Nuclear Science and Engineering Student Conference, Univereity of Florida, April 4-7, 1985.
- It is expected that the results of this work will be published in a jour-nal article at a future date under Dr. Ranga Rao, Biology Department, University of West Florida, Pensacola.
68
I
- 13. " Control Blade Maintenance Experience at the University of Florida Train-ing Reactor," P.M. Whaley. paper presented at the Eastern Regional Nu-clear Science and Engineering Student Conference University of Florida, April 4-7, 1985.
- 14. " Final Report on the Spring Semester Reactor Operations-Based Health Phy-I sics Cooperative Work Training Program," conducted for Radiation Protec-tion Technology Program Students at Central Florida Community College, W.G. Vernetson, April, 1985.
- 15. " Development of an Out-of-Core Cerenkov Radiation Detector for Nuclear
~
Reactor Diagnostics," H. Carvajal-Osorio, Doctoral Dissertation in Nu-clear Engineering Sciences Department, University of Florida, May, 1985.
- 16. " Spring Semester Reactor Operations Laboratory Manual for ENU-4905/6937L,"
W.G. Vernetson, May , 1985.
- 17. "A Reactor Operations Based Radiation Protection Health Physics Labora-to ry , " W.G. Vernetson, Trans. Amer. Nucl. Soc. , 49, p. 33, June, 1985.
- 18. " Comparative Methods of Composition Determination," M. Adams, summer re-search project report submitted as a participant in Florida Foundation of Future Scientists 1985 Summer Research Program (prepared also for use as I a High School Science Fair Project), Nuclear Facilities Division, Univer-sity of Florida, August 5, 1985.
I 19 " Determination of Thermal Neutron Flux in Special Experiments Using Gold Foils at the University of Florida Training Reactor," P.C. Sakornsin, summer research project report submitted as a participant in Florida I Foundation of Future Scientists 1985 Summer Research Program (prepared also for use as a High School Science Fair Project), Nuclear Facilities Division, University of Florida, August 6, 1985.
- 20. " Expanded Scope of Training and Education Programs at the University of Florida Training Reactor," W.G. Vernetson and P.M. Whaley, ROD Topical Meeting, Trans. Amer. Nucl. Soc. , 49, (Suppl. 2), p. 36, August, 1985.
21 " Final Report on the Summer Semester Reactor Operations-Based Health Phy-sics Cooperative Work Training Program," conducted for Radiation Protec-tion Technology Program Students at Central Florida Community College, W.G. Vernetson, August, 1985
- 22. " Implementation of DSNP (Dynamic Simulator of Nuclear Plants) and Applica-I tion to the Analysis of Transients for the UFTR," J. Samuels, Masters' Thesis Project in Nuclear Engineering Sciences Department, University of Florida, degree expected May, 1986.
I 23. " Physical Basis of Heat and Radiation-Induced Color Changes in Topaz:
AL p(SiO )(OH,F)p," J. Rink, Masters' Thesis in Physics Dspfftiitent, 4
Florida State University, degree expected May, 1986,
- 24. "Deterinination of Parameters for a UPTR Primary Coolant Fission Product I Activity Model," R. Knecht, Masters' Thesis Project in Environmental En-gineering Sciences Department, University of Florida, degree expected August, 1986.
69
--- _- 2 ._.. 4--___- _s_,4m , . .. . .-.-s. a m -ag . - -
e O
APPENDIX A l
UPTR FACILITY LICENSEE RESPONSE TO
! NRC INSPECTION REPORT NUMBER 50-83/85-01 I
i I
I
I a u s. u.oc uron ec.vsanarson.r.tacton ur=4caa NUCLEAR FACILII ES DlVISION
%_ f.g.
I NUCLEAR REACTOR DUILDING cA)NESYtLLE, float 04 32611 @ggg g Q pg *
- PHON $ (904)392-1429 TELEX $6230 , ,
,,,,,,s b I
March 26, 1985 I Nuclear Regulatory Commission Suite 2900 101 Marietta Street, N.W.
A tlan tt. , Georgia 30323 Attention : J. Nelson Grace Regional Administrator, Region II Re: University of Florida Training Reactor Facility License: R-56, Docket No. 50-83 I Pursuant to the reporting requirements of paragraph 6.6.2(3)(c) of the UFTR Technical Specifications, a description of a potential abnormal occurrence as defined in the UPTR Technical Specifications, Chapter 1 is described in this I final report to include NRC notification, occurrence scenario and occurrence solutions as well as actions taken to prevent recurrence of this problem. The potential blades abnormal (Safety Bladeoccurrence
- 3) involved the failure of one of the UPTR control to drop on demand from a 27-30's withdrawn position.
NRC Notification The Executive Committee of the Reactor Safety Review Subcommittee reviewed this occurrence on January 28, 1985 and concluded that it is a potential ab-I normal occurrence as defined in UFTR Technical Specifications, Chapter 1. The Specs. then instructed NRC notification as per Section 6.6.2 of the UPTR Tech RSRS telecopy This notification (Attachment was I) on carried28, January out by both telephone and a following I the 14 day followup report as required in UFTR Tech Specs,1985.
6.6.2(3)(c) was submitted on February 9, Paragraph An interim report 1985 ( Attachment II). The current final report records closure of consideration of this occurrence as the prob-lem leading to the occurrence has been shown to be fully resolved.
It should be noted that NRC Region II through Inspector A. Ilardin has been I kept fully updated as to the progress on the resolution of this problem through telecoms on January 28, January 29, February 19, March 1 and finally on March 6 to advise the final resolution of this problem.
I Hardin was present for an unrelated inspection on February 11-15, 1985 and was advised of the status of the sticking blade at that time.
In addition, Mr.
l lI l
sovat cercarumrvrnewat'vt erimes rien nvs a
I I NRC Page Two March 26, 1985 Occurrence Scenario As indicated in the telephone conversation with Mr. Austin Hardin, NRC Inspec-tor, Region II, and a following telecopy on 28 January 1985 (Attachment I),
the UFTR had been shutdown (all blades fully inserted) following a brief full power demonstration run on January 26, 1985. As part of a UFTR demonstration exercise following shutdown from full power, Safety Blade #3 was removed to approximately 300 units (30% withdrawn) and the clutch current interrupted to I demonstrate the effect of rapid insertion of a large negative reactivity at a far suberitical configuration following shutdown from full power. The blade dropped a few units and failed to drop further. At this point, the operator manually fully inserted the control blade into the UPTR core and notified the I Reactor Manager.
Later checks by the Reactor Manager showed that safety Blade #3 exhibite3 this I sticking phenomenon only over a narrow range from about 27-35% withdrawn. Sub-sequent checks in the ensuing two weeks showed this sticking phenomenon occur-ing over a relatively narrow range from about 15-35% withdrawn and not to oc-I cur on some occasions. When at the normal position (64% withdrawn) the blade continued to drop properly upon interruption of the clutch current. The same is true of full withdrawal where the drop time continued to be well within the
<1 see technical specification limit in all checks.
As indicated to Mr. Hardin, the need to let the core cool for a period pre-vented a final report within the '.4-day period as it was originally thought I that full unstacking of the core could be required to determine the cause of the sticking phenomenon and to resolve the :coblem if it was within the con-trol blade shrouds inside the core. However, Mr. Haruin did advise the submis-I sion of an interim report and recommended including the results of checking all four UFTR control blades to determine whether there was sticking at any other positions. Unfortunately these results were not yet available on Feb-I ruary 9 for inclusion in the interim reporti (Attachment II) due to a failure in a chart recorder required to withdraw blades.
Evaluation I Evaluation and determination of the methods for alleviating this problem of a sticking control blade as well as preventing recurrence were discussed at a staff meeting on January 31, 1985.
Since the UFTR core was unstacked for removal of two fuel bundles for inspec-I tion on January 16, 1985, it was thought likely that some slight misalignment of the control blade shaft or the shroud was caused by the activities involved in restacking the shielding. On January 22, 1985, prior to returning the UPTR I to service on January 22, all blade drop times were measured and found to be well within tech spec limits. However, Safety Blade #3 did have an increased drop time of slightly over 0.1 sec, not thought to be significant at the time because all blade drop times vary up or down from one check to the next. In addition, the cell radiation levels were surveyed at full power on January 22 prior to returning the UPTR to service. These also were found to be normal.
a
I l
l NRC Page Three March 26, 1985 At the January 31 staff meeting it was decided that potential blado drag points would include:
- 1. Inside gear boxes
- 2. Inside the blade shrouds
- 3. Shifted blade shaft / pedestal or bearing
- 4. Shifted blade shaft / drive unit or bearing ,
Also the possibility of mechanical failure due to failed rivets holding the cadmium absorber in the aluminum plates of the control blades was ccasidered but the nature of the sticking made this unlikely. Points 2 and 4 were thought I to be most likely in view of the recent shielding removal and work in the core area.
I The original work plan involved checking all the above possibilities to deter-mine the cause of sticking in S-3 and to restore proper blade function. As the first stages of ex-core checks on the gear boxes were undertaken, it quickly became evident that the source of binding in the S-3 Control Blado was outsida the core region somewhere in the right angle gear box /shaf t arrangement. This was initially demonstrated by visually observing the right angle gear box with the blade stuck and noting that load was transmitted at least as far as the I gear box indicating the problem was not within the shroud or core area but rather was confined to the right angle shaf t-gear box clutch areas.
Review of General Workplan (Corrective Action)
Due to the condition of the bearings on the right angle shaf t of control blade I S-3 (as well as perceived needs for gear and bearing lub<ication and replace-ment of shim / gasket material at the mating surface of the split-clutch hous-ing) all gears, motors, and clutch assemblies were the subject of a similar maintenance, testing and checkout program following successful completion of all essential work on control blade S-3.
For each of the four control blades, the following general tasks were accom-plished:
- 1. Disconnection of the right-angle gear box from the control blade shaf t with the reactor shutdown;
- 2. Disassembly of the gear box and motor-clutch assembly;
- 3. Complete cleaning and' lubrication of the system components;
- 4. Replacement of both bearings on the right angle motor drive shaft; al-I though only one bearing on the S-3 shaft was actually malfunctioning,
' good preventive maintenance dictated replacing both bearings;
I l NRC Page Four March 26, 1985 I 5. Replacement of the (cork) shim between the two halves of the clutch as-sembly housing with aluminum shims to reduce potential compression over time and to assure proper clutch and clutch friction plate clearances; this compression leading to reduced clearances is thought to have contri-buted to the binding problem;
- 6. Re-termination of all electrical connections in the shaft housing assem- '
bly with new leads to prevent the potential development of contact /corro-sion problems;
- 7. Re-assembly of the right angle gear _ box and clutch and motor assembly;
- 8. Re-setting blade drive position potentiometers to read approximately zero for a low level blade position;
- 9. Re-setting of all limit switches.
Test and Checkout Program Following completion of the previously referenced tasks for the S-3 Control Blade, a series of tests was performed to assure correction of the problem of I the sticking S-3 blade and proper operation of the blade drive control systems to include:
- 1. Measurement of controlled full removal time;
- 2. Measurement of controlled full insertion time;
- 3. Measurement of drop time from full out position; 4.
Check for successful drop from five (5) c,r more intermediate positions.
Initially, control blade S-3 was found to have some clutch slippage during early stages of withdrawal. Investigation of the control blada technical lit-erature indicated that the control blade clutch voltage was rated for use with one-hundred (100) volts across the clutch, or for faster control blade drop times, fifty (50) volts. Practice at the UFTR has been to set the clutch cur-i rent, not the voltage, allowing circuit impedances to control clutch voltages; clutch voltages were all found to be below technical manual specifications.
l Evidence indicates that clearances within the clutch of control blade S-3 woro such that some mating friction for control blade motion was provided by the mechanical tolerances. Subsequently, applied voltages were raised to the ranges specified in the technical manual, causing significant current in-I creases (~15%) over previous readings. No further slippage problems were noted. To conform with the specificatons of the technical manual and thus pre-clude any problems with the remaining control blade drive systems, clutch vol-I tages for Safety Blades S-1 and S-2 were also raised to the ranges specified.
Since the clutch voltage for the Regulating Blade was already within the spe-cified range, it was not adjusted.
I
l l
NRC Page Five March 26, 1985 Test Results All control blades were found to have drop times well within the limits of technical specifications and in the case of control blade S-3, the value has I dropped to a value intermediate between that recorded in July 1984 and in Jan-uary 1985 with an average value of 0.644 seconds for three drops. The con-trolled insertion / removal times are also consistent with normal values - indi- ,
cating normal operation after setting clutch voltage to specified values. Con-I trol blade drops from various positions were also successful in all cases.
Test results are summarized in the attached Table 1. Similarly, for comparison purposes, historical data on the controlled removal, controlled insertion and I full out drop times for all blades is presented in Table 2. This work was com-pleted on March 2, 1985.
Recommendation The UFTR Management presented the results of this work completed on March 2 I 1985 to the RSR3 for approval on March 5,1985 to declare the sticking safety blade (S-3) occurrence as a closed issue with resumption of normal UPTR opera-tions allowed. The only potential modification involved in the work is the re-placement of the shim material in the split-clutch housing. This potential I modification was reviewed relative to its constituting an unreviewed safety question as defined in 10 CFR 50.59 and determined not to constitute an unre-viewed safety question by facility management as well as the RSRS Executive I Conmittee. Therefore, the Executive Committee of the RSRS approved restart of the UPTR on March 5. A memorandum from the Director of Nuclear Facilities of-ficially removed the UPTR from Administrative Shutdown on March 7, 1985.
Preventive Action I The UFTR Technical Specifications surveillance Requirements, Section 4.2.I Paragraph (4) states, "The mechanical integrity of tht- control blades and drive system shall be inspected during each incore inspection but shall be fully checked at least once every 5 years." This requirement dates from UPTR I relicensing in 1982 and is considered sufficient to provide reasonable assur-ances that this binding in the gear / clutch system will not recur since the bearings used are " lifetime" bearings and the gear box and right angle bearing systems have not previously undergone such maintenance.
Consequences i
As concluded by the Reactor Safety Review Subcommittee, this potential abnor-mal occurence did not compromise the health and safety of the public. In addi-tion, with RSRS approval of this report conveyed to NRC, this problem is con- -
sidered to be fully resolved.
I .
I .
NRC Page Six March 26, 1985 Postscript It should be noted that several surveillances which were not performed due to the administrative shutdown since January 28, 1985 following discovery of the '
sticking blade on January 26, 1985, were required to be performed before nor-mal operations were resumed. These included completion of the annual reac-tivity measurements as well as an experimental verification that the UFTR has '
a negative moderator coefficient. This was completed prior to beginning normal operations. In the case of the annual reactivity measurements, +5e regenera-tion of control blade integral worth curves was accomplished usii g the rod drop method in increments of 100 units resulting in up to 10 add; tional drops for cach of the control blades. All were successful. Operations since March 7, 1985 have been normal.
/ YK L 6 William G. Vernetson
~ 2 MDateJ ws' Actihg Director of Nuclear Facilities WGV/ps Enclosures I cc: Reactor Safety Review Subcommittee P.M. Whaley, Acting Reactor Manager I
O TABLE 1 TEST RESULTS FOLLOWING UFTR
' l CONTROL BLADE MAINTENANCE l ON 2 MARCH 1985 )
A. DROP TIMES FOR 3 DROPS (Seconds) --
Lt <.
I J-1 S-2 S-3 Reg Blade -
0.400 0.525 0.650 0.408 0.408. A 0.525 0.625 0.475 I \
0.400 0.517 4.658 0.51 7 B. CONTROLLED REMOVAL AND INSERTION TIMES S-1 S-2 S-3 Reg Blade Top Position 1015 1004 10,08 1009 Bottom Position 003 003 001 001 I Removal Time (sec)
Top Positon Bottom Position 1015 020 105.9 1004 020 106.3 1008 018 108.3 1009 108.6 018 Insertion Time (sec) 103.7 103.7 105.8 106.0 I C. CLUTCH VOLTAGES AND CURRENTS BEFORE AFTER VOLTAGE (v) CURRENT (ma) VOLTAGE (v) CURRI:NT (ma)
I S-1 49.49 49.0 56.59 56 S-2 45.8 45.4 54.99 54 S-3 46.9 42.7 64.2 52 Reg Blade 66.92 67.0 . No Change -
Note: Tech Manual Specifies 50-90 v.
s A w/a A s-c-rr
~
i l
/
Resctoi- Manager Date I -
l l
TABLE 2 IIIS1DRICAL BLADE TIMING DATA A. FULL OUT DROP TIMES (Seconds)IlI Date S-1 S-2 S-3 Reg Blade 2 Mar 85 .403 (avg) .522 (avg) .644 (avg) .467 (avg) 22 Jan 85 .450 .583 .753 .450 24 Jul 84 .450 .580 .525 .575 26 Jan 84 .475 .550 .433 .517 25 Aug 83 .425 .600 .400 .483 I 21 Mar 83 14 Oct 82
.475
.475
.658
.658
.458
.417
.467
.483 B. CONTROLLED WITHDRAWAL TIMES (Seconds)(2)
Date S-1 S-3 I
S-2 Reg Blade 9 Oct 84 105 105 107 107 I 15 22 29 Oct Oct Oct 84 84 84 106 106 105 107 106 107 108 108 108 106 106 107 5 Nov 84 105 106 106 107 11 Nov 84 105 106 108 108 21 Nov 84 105 106 107 108 26 Nov 84 106 106 106 108 I C. CONTROLLED INSERTION TIMES (Seconds)(3)
I Date S-1 S-2 S-3 Reg Blade 22 Jan 85 104 104 106 106 21 Jan 85 104 106 107 108 I 31 Jul 84 26 Jan 84 25 Aug 83 104 104 104 104 104 104 106 106 105 107 107 107 Note 1: Data taken from S-$ Surveillance File. ,
Note 2: Data taken from Weekly Checkout File. .
Note 3: Data taken from S-5 Surveillance Pile.
u i. u.o.acm r.c.vta crso~.m.cro mmcta NUCLEAR FACILITIES DMSION L
/ I.. g
'[
~
4UCLEAR REACTOR DUILDING '
AmtsvlLLE,Ftom 04 32619 UNIVERSITY OF FLORIDA . -
PHONt (904) 392 8429 TELEX 56De '"
A'ITACHMENT I January 28, 1985 I .
Nuclear Regulatory Commission Suite 2900 101 Marietta Street, N.W. .-
Atlartta, GA 30303 I Attention: James P. O'Reilly Regional Administrator, Region II Ee: University of Florida Training Reactor (UFTE)
Facility License: R-56, Docket No. 50-83 '
As per telephone call of 28 January 1985, we are reporting the failure of one of the reactor control blades (Safety-3) on the I University of Florida Training Reactor to drop on demand from a 27-30% removed position. This failure (sticking at about 27% re-moved) was discovered during a demonstration when the reactor was shutdown except for the control blade removal in question. The I- blade was subsequently driven in with no further problems encoun-tered to secure the reactor.
I The 5:xecutive Committee .of the Reactor Safety Review Subcommittee har reviewed the occurrence and concluded that it is a potential abrormal occurrence as defined in UFTR Technical Speciffcations, I Chapter 1. The RSRS has instructed NRC notification as por Sec-tion 6.6.2 of the UFTR Tech Specs.
I Analysis of the' problem is underway with corrective action to follow based upon inspection results. Based on previous experi-ence with a failure of a safety blade (Safety-1) to drop when clutch. current was interrupted, February 19, 1975, Jte problem is I probably caused by some misalignment of the control blade system.
}!/ , h I .
William G. Vernetson Acting Director of Nuclear Facilities January 28, 1985
~
I- cc: RSRS Committee I .
. ...w. . .. ~ . - . . . . - .,. J.- ' - . .i V
mu im.'"=*
W.G. Vt3ET50N, R E ACTOR MANAG(R NUCLEAR FACILITIES DIVISION .l F ll NUCLEAR REACTOR BUILDING CAMSYELE, FLORID 4 hm WMEW G Rm * .
, , (
enoas possi,2442, retix 3633o ,,,,,,,** i April 19, 1985 Directcr, Division of Reactor Projects United States Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Atlanta, Georgia 30323 Attention: Roger D. Walker Re: Inspection Report No. 50-83/85-01 I by Inspector A.K. Hardin D' ear Mr. Walker:
This response to Inspection Report No. 50-83/85-01 is divided into two parts. The first part (Attachment A) addresses the sepcific Notice of Devia-tion citing the UPTR facility licensee for " failure to adequately control and document a revision to the reactor control circuits when on October 2,1982, an interlock was installed which provided for a trip of the diluting fan / vent fan on activation of the evacuation alarm." Included in this first part of the I response is our procedure to assure that modifications are reviewed to deter-mine there are no unreviewed safety questions.
I Discussions with Dr. N.J. Diaz (Facility Director) who is on leave this year indicate that this interlock was consider,:<1 and analyzed on several occa-sions prior to installation foll, wing the June <<, 1980 PuBe source incident referenced in the inspection report (Page 5, Paragraph 14 on Design Changes and Modifications). As a result this modification was considered important enough to be included in the new Tech Specs. As a result the modification was added to the new Tech Specs and in the FSAR on which the new license was is-sued in August, 1982. As a result this change underwent review and approval within the RSRS as part of the new FSAR aqd the new Tech Specs. In addition, the modification was reviewed by the SAR site review inspection team in Spring 1982. For these reasons, a 10 CFR 50s59 Evaluation and Determination was not considered necessary; that is, instW cf a 50.59 review, the change was in-cluded under renewal of the UFTR R ',6 Liet.ise. Therefore, the modification was I considered to be adequately reviewed as part of the license renewal process.
Nevertheless the documentation of these reviews and the modification itself is not complete and proper corrective action is addressed in Attachment A.
The second part of this response (Attachment B) addresses the procedures and program elements which are used to implement applicable guidelines of ANSI Standard N402-1976. This response describes how the existing UPTR progrant meets or proposes to meet applicable sections of ANSI Standard N402-1976 and how corrective action is planned to address areas requiring changes such as augmented or nc.w proceudres or other documentation to meet applicable ANSI N402 requirements. All 17 sections ( 2.1 through 2.17) of the ANSI-N402 Stan-dard are addressed. It should be noted that most of the new procedures or sec-tions thereof committed to be produced are simply better documentation of existing requirements and activities within the UFTR QA Program. We do recog-nize the need for this documentation and are proceding at a reasonable pace to produce the necessary procedures.
.c The SOP development required to meet the commitments outlined in Attach-ment B represents a significant allocation of limited manpower resources.
Though we identify specific procedures to be developed to address individual or multiple of the 17 paragraphs of ANSI-N402, better arrangements of SOP con-tents may be evident later in the development and will be used as deemed necessary without omitting commitments. Commitments themselves are summarized I in Attachment c which consists of a table delineating new SOPS or Sections of SOPS to be developed.
The proposed time table to meet these commitments is as follows. As noted in Attachment A, all actions to address the specific cited deviation will be completed by June 30, 1985 with many already completed. The SOP development '
committed in Attachment B will require much more time. We propose to have these commitments completed and implemented by January 31, 1986. It is ex- i pected that this date will provide sufficient time for adequate reviews of SOP !
draf ts to assure development of usable quality procedures.
We trust this response will satisfy the requirements delineated in the inspection report. If there are further questions, please advise.
Sincerely,
~
William G. Vernetson Acting Director of l
Nuclear Facilities WGV/ps Attachments I
cc: P.M. Whaley J.A. Wethington, Jr.
I
).
k
r ATTACIIMENT A NRC INSPECTION REPORT NO. 50-83/85-01 Failure to adequately control and document a revision to the Reactor Control Circuits when on October 2, 1982, an interlock was installed which provided for a trip of the diluting fan / vent fan on activation of the evacuation siren.
Expected Response Content
- 1. Description of corrective actions regarding these devia-tions.
- 2. Actions taken to avoid further deviations.
- 3. Dates when these actions were or vill be completed.
Management Response
- 1. Corrective Actions The diagrams and drawings for this modification are being put into final form by the UFTR staff. The diagrams and drawings for this modification will then be reviewed for completeness and acceptability by the UFTR staff and then submitted for acceptance and approval by the RSRS to review the installation to assure technical adequacy. This review and approval will be completed by May 30, 1985.
- 2. Action Taken to Avoid Further Deviations
- a. Prior to approval, all modifications require a 50.59 declaration as per UFTR SOP-O.4 approved by the Reactor Safety Review Subcommittee on March 26, 1985.
- b. A procedure on Control and Documentation of Design Changes is in preparation with completion expeceed by the end of June with approval by RSRS expected at a regularly scheduled meeting in July, 1985. This SOP L will then be approved and installed in all UPTR SOP manuals by July 31, 1985.
- 3. UFTR SOP-0.4 "10 CFR 50.59 Evaluation and Determination" was approved on March 26, 1985 with official installation into all UFTR SOP manuals expected by April 30, 1985. The basic contents of the SOP have been instituted and utilized begin-ning with concern expressed at the NRC exit interview on February 15, 1985. The SOP was utilized on March 5 in tem-porary form to review the maintenance / repair work performed on the UPTR control blade clutch housings.
-qf us.oE.oaao. r Of ec.vs=Nanom.r :4ctmeanacia NUCLEAR i%CILITIES DMSION s
[qd'3'. ' '
NUCLEAR REACTOR BUILDING l UNIVERSITY OF FLOR!DA . .
dmasvrut.nomior sms PHONE (90s) 392-1429 TELtX 5H30 c.,,*,, n.s
- ATTACIC4ENT II February 9, 1985 Nuclear Regulatory Commission Suite 2900 '
101 Marietta Street, N.W.
Atlanta, Georgia 30323 Attention: J. Nelson Grace Regional Administrator, Region II Re: University of Florida Training Reactor Facility License: R-56, Docket No. 50-83 Gentlemen:
Pursuant to the reporting requirements of paragraph 6.6.2(3)(c) of the UFTR Technical Specifications, a description of a potential abnormal occurrence as defined in the UFTR Technical Specifications, Chapter 1 is described in this interim report to include NRC notification, occurrence scenario and proposed solutions. The potential abnormal occurrence involved the failure of one of the UFTR control blades (Safety Blade #3) to drop on demand from a 27-30%
withdrawn position.
NRC Notification The Executive Committee of the Reactor Safety Review Subcommittee reviewed this occurrence on January 28, 1985 and concluded that it is a potential ab-I normal occurrence as defined in UFTR Technical Specifications, Chapter 1. The RSRS then instructed NRC notification as per Section 6.6.2 of the UPTR Tech Specs. This notification was carried out by both telephone and a following telecopy on January 28, 1985. This interim report represents the required 14 day followup report as required in UFTR Tech Specs, Paragraph 6.6.2(3)(c).
Occurrence Scenario I As indicated in the telephone conversation with Mr. Austin Hardin, NRC Inspec-tor, Region II, and a following telecopy on 28 January 1985 (Attachment I),
I the UFTR had been shutdown (all blades fully inserted) following a brief full power demonstration run on January 26, 1985. As part of a UFTR demonstration exercise following shutdown from full power, Safety Blade #3 was removed to approximately 300 units.(30'h withdrawn) and the clutch current interrupted to demonstrate the effect of rapid insertion of a large negative reactivity at a !
far subcritical configuration following shutdown from full power. The blade dropped a few units and failed to drop further. At this point, the operator '
raanually fully inserted the control blade into the UFTR core and notified the reactor manager. -
Later checks by the Reactor Manager showed that Safety Blade #3 cxhibited this sticking phenomenon only over a narrow range from about 27-35'k withdrawn. When at the normal position (64$.- withdrawn) the blade drops properly upon inter-I ruption of the clutch current. The same is true of full withdrawal where the drop time is well within the <1 see technical specification limit. l l
. i
.. ' d_ ' . i, I February 9, 1985 Page Two As indicated to Mr. Hardin, the need to let the, core cool for a period-pre-vents a final report on this occurrence at this time. However, Mr. Hardin did advise the submission of an interim report and recommended including the re-
- sults of checking all four UFTR control blades to detemine whether there is sticking at any other positions. Unfortunately these results are not yet available due to a failure in a chart recorder required to withdraw blades.
When maintenance on the chart recorder is completed, the drop checks from va-I rious heights will be checked.
Evaluation ,'5 Evaluation and detemination of the methods for alleviating this problem of a !
sticking control blade as well as preventing recurrence were discussed at a l staff meeting on January 31, 1985.
Since the UFTR core was unstacked for removal of two fuel bundles for inspec-tion on January 16, 1985, it is most likely that some slight misalignment of the control blade shaf t or the shroud was caused by the activities involved in restacking the shielding. On January 22, 1985, prior to returning the UFTR to service on January 22, all blade drop times were measured and found to be well within tech spec limits. However, Safety Blade #3 did have an increased drop time of slightly over 0.1 sec, not thought to be significant at the time be-cause all blade drop times vary up or down 'from one check time to the .next. In I addition, the cell radiation levels wero surveyed at full power on January 22 prior to returning the UFTR to service. These also were found to be normal.
At the Janua y 31 staff meeting it was decided that potential blade drag I- points would include:
'E 1. Inside gear boxes E 2. 2nside the blade shrouds
- 3. shif ted blade shaft / pedestal or bearing
- 4. Shif ted blade shaf t/ drive unit or bearing ,
' Also there is n possible mechanical failure due to failed rivets holding the cadmium absorber in the aluminum plates of the control blades. Points 2 and 4 seem most likely in view of the recent shielding removal and work in the core area.
The work plan will involve checking all the possibilities shown above to re- .
store proper blade function; all control system components involving potential drag points will be so inspected with proper corrective action taken as well.
The general work plan will involve measurement of blade drive currents prior to further work to determine if increased motor drag can be detected at the hangup point. The rest of the work plan will involve shielding removal and fuel removal and inspection (as required for mechanical checking of weights of I the blades as they are exercised manually) as well as visual and other checks of possibly affected parts of the control system to include gear boxes, shaf ts, pedestals, shroud and control blades. Alignment and physical integrity will be assured in all cases. Since the core will be unfueled for most of this work, plans are to reload the core and add enough fuel for expected burnup over the next several years.
I .
' e .* ,
February 9, 1985 Page Three Consequences As concluded by the RSRS Executive Committee, this potential abnormal occur-I rence did not compromise the health and safety of the public. This occurrence
- was discovered at a far suberitical configuration and would not prevent ade-quate shutdown margin for.the core since the blade can still be driven in and the sticking is 25-30 s withdrawn, not a normal operating position. ,
Followup .
i since the work described above will involve approximately two weeks, a further report will be supplied as the exact cause of the problem is determined and addressed.
/ h
- Y William G. Vernetson Acting Director of Nuclear Facilities Attachments __
cc: P.M. Whaley Reactor Safety Review Subcommittee I -
I 1
1 I APPENDIX B I
FINAL
SUMMARY
REPORT TO NRC ON STICKING S-3
- CONTROL BLADE PROBLEM: NOTIFICATIONS, I CORRECTIVE ACTION, PREVENTIVE MAINTENANCE, TESTS AND SURVEILLANCES l
I l
i l
l
l ATTACILMENT B UFTR QA PROGRAM 'IO MEET APPLICABLE SECTIONS OF ANSI N402-1976 2.1 Responsibility Existing Program The UPTR Quality Assurance Program is established by management direc-tives and implemented primarily by the FSAR facility license and existing manual of Standard Operating Procedures and additional instructions. The memoranda and directives serve to identify structures, systems and com-ponents covered by the QA program. Essentially all nuclear safety-related I systems, structures and components are covered by the existing Quality Assurance Program.
Corrective Action A specific SOP to formally establish the UPTR QA Program will be Eener-J ated. The responsibility of UPTR management levels for implementing th'is I program will be delineated in the SOP.
2.2 Organization I Existing Program UFTR staff and management personnel are assigned first line responsibili-ty for review, verification and audit functions. The RSRS is assigned fi-nal responsibility for review, verification and audit of all modifica-tions to the facility with Nuclear Safety implicationn. The RSRS is also assigned final audit responsibility for overall facil.ty QA records.
I Corrective Action I The QA organization will be better defined along with the program respon-sibilities in the SOP referenced under Section 2.1 (Responsibility).
2.3 Doc entation Existing Program As required by ANSI N402, the activities affecting the safety-related i-tems to be covered by the UFTR QA Program are considered to be formally identified within the UPTR SOP manual including SOP-0.1, " Operating Docu-ment Controls" and various other SDPs where documentation is delineated.
I As also required, the documentation includes applicable SOPS, reviews and other applicable measures within the SOP system. There is not, however, a single document wherein all the activities affecting the safety-related I
items to be covered by the QA Program are explicitly and formally identi-fled and documented. Essentially to date, all activities required by the Tech Specs, SOPS or other formal documents are considered to be covered by the existing QA program and hence to require documentation.
Ccrrective Action To assure that all activities affecting the safety-related items to be covered by the UFTR QA program are properly documented, a second proce-dure will be developed. This SOP will specifically address a QA Program to include documentation previously unspecified applicable procedures, reviews and other measures. With the generation of the procedure, the proper documentation for the entire QA Program will be addressed.
2.4 Design Control Dcisting Program Adequate design control measures to assure that applicable regulating re-quirements are correctly incorporated into design documents for safety-related items are in place. As required by ANSI-N402, verifications are performed by independent individuals and modificatons relative to safety-related items are subject to proper design control measures. The require-ments of this program element is not well documented. A formal' procedure I addressing Design Control as currently implemented at the UFTR is the one area of the existing QA program for design control which is lacking.
Corrective Action A separate formal document (a third SOP) cddressing applicable design control requirements and recommendations delineated in Paragraph 2.4 of ANSI-N402 will be generated to assure proper design control within the UFTR QA Program. It is not anticipated that this SOP will change UPTR practice in this area - only that it will formalize it to preclude the I occurrence of inadequate design control. Existing design control practice is considered adequate, only formalization via an SOP is needed. This SOP is already in development.
2.5 Procurement Control I bcisting Program The existing UFTR QA Program is considered to have adequate Procurement Control in practice. However, there is no formal SOP to be referenced in this regard. Basically University of Florida procurement control methods I are applied with an independent review process to evaluate procured items.
Corrective Action A formal procedure will be generated in which one section addresses pro-curement control to include measures for addressing requirements in pro-
curement documents for safety-related items as well as adequate quality assurance controls to an extent determined necessary by the safety re-quirements of the final system. This procurement control section of a I procedure will also address changes to procurement documents as well as assurance that procured items or services conform to procurement docu-ments.
2.6 Document Control Existing Program The existing UFTR QA Program contains adequate measures to control the development, revision and use of documents and drawings which define ac-tivities affecting the quality of safety-related items. Howei ar, there is I again no formal SOP to be referenced for overall document control within the QA program. SOPS do exist for controll,ing procedure changes (SOP-O.1 ) , maintenance and modifications (modification part recommended to be expanded and better delineated by NRC Inspector H. Ilardin ). Similar docu-ment controls are delineated for various other safety-related items and activities by other SOPS such as SOP-A.5 (Experiments), A.1 (Weekly and Daily Checkouts), etc.
I Corrective Action A formal distinct procedure will be generated to serve as the overall document control procedure for the QA program. This procedure will es-tablish the overall measures to assure control over the development, re-vision and use of documents and drawings which define activities af fect-I ing the quality of safety-related items.
2.7 Material Control Existing Program Measures established to control the identification, handling, storage, I cleaning and preservation of safety-related material und equipment in-clude segregated and controlled storage in several facility locations, labeling as to identity as well as periodic cleaning and wrapping and packaging of items and materials when such treatment is considered I necessary.
L Corrective Action I only minor changes in the existing program are considered necessary. How-ever, a Quality Assurance procedure will be developed to include a sec-tion formally delineating the measures described in the above existing program to include specific locations and types of items (safety-related) involved. This section will be in the same procedure as the Procurement Control elements of the QA program.
C 2.8 Process Control Existing Program The existing UFTR QA Program contains provisions for establishing and I documenting measures to assure that all use of materials for safety-re-lated purposes is accomplished under controlled conditions in accordance with applicable requirements. The existing program is primarily imple '
mented via SOP-0.:2 (Control of Maintenance). Certain other procedures al-I so address process control but only indirectly.
Correctivo Action No changes to the actual process control part of the QA program at the UFTR are considered necessary. However, a formal distinct procedure will be generated containing a section on process control to serve as the overall process control procedure for the QA Program. This procedure will assure that measures are established and documented to assure quality process control relative to safety-related items and activities in the UPTR facility.
2.9 Inspection Existing Program The UPTR QA Program does contain requirements for inspection of activi-ties affecting quality of safety-related items. As required by ANSI-N402 I the inspection program is applied to procurements, maintenance, modifica-tion and experiment equipment fabrication. The existing UPTR Inspection program is considered adequate in all areas, though formal delineation of I documentation requirements is lacking in the procurement area and to a lesser degree in the modification area. Inspection of experiments is ade-quately addressed and controlled under SOP-A.5 (Experiments) and inspec-I tion of maintenance activities is adequately addressed in SOP-0.:2 (Con-trol of Maintenance) which also addresses Modifications but not in suffi-cient detail. All required aspects of the program are present but formal documentation of requirements is not present via an SOP for areas such as inspection of procurements.
Corrective Action A new UPTR SOP will be developed to establish a formal program for in-spection activities in all areas affecting quality of safety-related items. This SOP will not replace SOPS such as 0.2 (Control of Main-tenance) but will provide overall QA Program Inspection requirements to assure all required areas are addressed with documented results.
I .
I
2.10 Test control Existing Program In practice the existing UFTR QA Program incorporates a test program to I assure that all required tests of safety-related items are identified and documented. Testing is performed in accordance with written procedures and instructions which incorporate reference requirements and acceptance limits as required. However, there is no' single overall test program pro-cedure to assure that all such required tests of safety-related items are identified and documented, though such a check was conducted following relicensing of the UFTR along with issuance of new Tech Specs in 1982.
Corrective Action I A new SOP will be developed to delineate all the required tests of safe-ty-related items and to assure formally the completeness of the list of those identified. Because all required tests are considered to have been identified and are being documented as conducted, this SOP will be a for-mality to assure completeness of the QA Test Program for safety-related items.
2.11 Control of Measuring and Test Equipment Existing Program I The existing UFTR QA Program already contains measures established to as-sure that tools, gages, instruments and other measuring and testing de-vices used in activities affecting the quality of safety-related items are available, properly controlled, properly and adjusted to meet cali-I bration requirements as necessary. Again this program is not formally documented in an SOP.
i Corrective Action Though this program is considered adequate as implemented, a formal pro-I cedure will be generated in which one section addresses the Control of Measuring and Test Equipment within the UFTR QA Program for safety-re-lated items and activities. This section will be within the same proce-I dure as the sections developed in reference to Paragraphs 2.5, and 2.12 of ANSI N402.
L 2.~1, 2.8 2.12 Nonconforming Material and Parts Existing Program The existing UFTK QA Program defined by relevant SOPS and directives etc.
I is considered adequate to provide for control of materials or parts, in-volved with safety-related items, which are nonconforming in order to prevent inadvertent use. T. gain these measures are not specifically ad-I
dressed in a separate procedure but a system does exist for proper con-trol, evaluation and disposition of nonconforming material and parts, primarily through SOP-0.2 (controls of Maintenance).
I Corrective Action I. Though ncnconforming material and parts are considered to be adequately controlled in practice, a formal procedure will be developed in which a section addresses the control of such nonconforming material and parts.
This section trill be within the same procedure as sections developed in reference to Paragraphs 2.5 , 2.7 , 2.8 and 2.11 of ANSI N402.
2.13 corrective Action Existing Program Significant conditions detrimental to the quality of safety-related i-I tems, such as failures, malfunctions and deficiencies are already prompt-ly identified, causes determined and action taken to preclude recurrence.
Through the weekly and daily checkouts delineated in UFTR SOP-A.1, " Pre-Operational Checks" as well as the existing system of tests, checkouts, I inventories and surveillances performed to meet License, Tech Spec and SOP requirements, measures exist to assure that corrections are in accor- !
dance with design requirements are properly reviewed prior to implementa-l I tion and are documented.
Corrective Action
~
l l
The new SOP-0.4 delineates how 10 CPR 50.59 Evaluations and Determina-l tions are made. A formal design control. procedure is to be generated (see discussions referenced in ANSI-402, Paragraph 2.4) and will assure formal measures exist to control corrections relative to safety-related items to assure they are in accordance with design requirements and are documented for proper QA audit.
2.14 Experimental Equipment Cxisting Program.
Experimental Equipment and Experiments in general are adequately con-trolled for reactor safety considerations via existing UFTR SOP-A.5 en-titled, " Experiments."
Corrective Action None required or anticipatea.
I I
2.15 Quality Assurance Records Existing Program The existing UPTR QA Program includes documentation of activities affect-I ing quality of safety-related items. The records include results of sur-veillances, tests and checks delineated in the Technical Specifications and in the UPTR SOP manual as well as the UFTR Security Plan and Operator Requalification Program. In addition records of the independent RSRS audit of facility operations and records are maintained.
Corrective Action I All Quality Assurance records will be organized and delineated under a single standard operating procedure to simplify identification and re-I trieval of records as well as audits to assure ease in tracking complete-ness. This SOP will also establish retention requirements for all quality assurance records including duration, location and responsibility which essentially will duplicate the requirements delineated in the UFTR Tech-nical Specifications Chapter 6.
2.16 Audits Existing Program Audits of facility records are conducted annually by the RSRS. Though not performed specifically to verify compliance with and determine the effec-tiveness of (Quality Assurance Program), these audits do in fact serve this purpose since all facets of facility operation are audited. The audits are performed in accordance with written instructicns developed I yearly by the RSRS Chairman and associated subcommittee members. Results are documented and reported routinely to management; these audits are performed by individuals not having direct responsibilities in the areas being audited. Follow-up action is prescribed where indicated.
Corrective Action A UPTR SOP will be developed and submitted to the RSRS to delineate bet-ter the conduct of UFTR audits specific to the UFTR Quality Assurance I Program. This formal SOP is not expected to involve little actual change in the audit, merely a formalization in SOP format of what currently con-stitutes the yearly audit.
I 2.17 Existing Facilities Existing Program I Since the issuance of the new UFTR license addresses the UFTR facility as built at that point, quality assurance documentation for the facility as existing upon relicensing is not required. Since the QA program is cur-I
I rently undergoing a significant formal Jelineation as described in this document, quality assurance documentation not required prior to formal delineation is nct addressed by this program.
Corrective Action All replacements, changes, modifications and activities relative to safe-ty-related items occurring since i te relicensing will be reviewed and cleared subject to the QA program requirements committed here and to be I addressed via the QA program developments in progress and to be completed by January 31, 1985.
I I
I 3.
I
e
- ATTACIDfENT C ANSI-N402 Corrective Action Paragraphs (SOP Development Commitments)
I 2.1 SOP 1 2.2 SOP 1 2.3 SOP 2 2.4 SOP 3 (Same as SOP com-I mitted in Attach-ment A re the De-viation) 2.5 SOP 4 2.6 SCP 5 2.7 SOP 4 2.8 SOP 4 2.9 SOP 6 2.10 SOP 7 2.11 SCP 4 I 2.12 SOP 4 2.13 SOP 3 2.14 None 2.15 SOP 8 2.16 SOP 9
).
2.17 Review of Changes Summary: A total of nine (9) new SOPS will be developed, pri--
marily documenti , existing QA program elements.
I I
I I
I ,
1 l
I i l
l I
I I APPENDIX C UPTR STANDARD OPERATING PROCEDURES I
i
- 1. UFTR SOP-C.1, " ASSEMBLY AND DISASSEMBLY OF IRRADI ATED FUEL ELEMENTS" l
- 2. U5'TR SOP-O.4, "10 CFR 50.59 EVALUATION AND DETERMINATION"
- 3. UFTR SOP-E.7, " MEASUREMENT OF TEMPERATURE COEFFICIENT OF REACTIVITY" I
I
,I i
I l I l lI l
1 I
g - c., exem , e, ,4 I
UFTR OPERATING PROCEDURE C.1 I 1.0 Irradiated Fuel Handling ..
l 2.o ,ggrove1
/
Reactor tiafety Review Subcomittee . . . . f/ x% 7 8 r# '"
Date I Facility Director . ... . . . . . . . .
/ -
(f . .
/[//{
I I
I I
I I i I
I
, I REV. 4, 2/85 l I I
S0P-C.1 PAGE 2 of 14 3.0 Purpose and discussion I 3 .1 This procedure (UFTR S0P-C.1) addresses irradiated fuel handling not considered to be fuel loading (addressed in UFTR S0P-C.2) including:
3.1.1 Removing one fuel assembly from the core, inspecting it in the shield tank, and returning that fuel assembly unaltered to its original position in the core or to a new location in the spent fuel pit; 3.1.2 Removing one fuel assembly f rom the fuel pit, inspecting the assembly and inserting the assembly into its origi-nal position in the spent fuel pit or another position in the spent fuel pit.
3.1.3 No operation which would insert fuel into a core posi-tion other than that one position from which that fuel had been removed at a previous point in the procedure.
3.2 Personnel Definitions for Irradiated Fuel Handling Operations 3.2.1 " Supervisor-in-Charge" shall be that person designated by the Reactor Manager to have responsibility for dir-I ecting the irradiated fuel transfer operation; the Supervi sor-in-Charge must hold a Senior Reactor Operator's license.
3.2.2 " Radiation Control Personnel" shall refer to that person or persons with the responsibility for perf orming radi-ation field and contamination surveys, establishing and maintaining control points, assuring the provisions of the radiation work permit, and operating radiation detection instrumentation as required to support the operation.
3.2.3 " Equipment Operator" shall be that person or persons I who, at the direction of the Supervisor-in-Charge, operates tools and equipr.ient necessary for transfer operations and shall be further divided into categories specifying the equipment to be operated (e.g. crane operator, tool operator, lifting line operator, etc.).
3.3 The operation of fuel assembly removal from the core, inspection, and return to the same location in the core unaltered is accomplished under this procedure; this operation is not considered as Fuel Loading, which is addressed in UFTR S0P-C.2.
I REV 4, 2/85
SOP-C.1 PAGE 3 0F 14 4.0 Limits and precautions 4 .1 Within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to implementing this procedure, it must be reviewed by all personnel participating in the fuel transfer operation.
4.2 Irradiated fuel transfer operations mu.st be supervised by the Reactor Manager or his duly authorized representative, ,
who shall hold a Senior Reactor Operator License.
4.3 A licensed operator should be at the reactor console at all times during irradiated fuel handling operations; a li-censed reactor operator shall be at the console during f r-radiated fuel handling operations that involve the reactor Core.
4.4 Irradiated fuel handling requires a Level I Radiation Work Permit (UFTR SOP-D.2) to be prepared and on site at the work control point.
4.5 Control room documents shall reflect fuel transfer acti-vity.
4.5.1 Operations must be approved in the operating log.
4.5.2 Operating log entries will reflect the nature and status of the fuel transfer operations in progress.
I 4.5.3 A " Fuel Transfer Log Sheet" (UFTR Form S0P-C.1A) shall be maintained.
4.5.4 An " Irradiated Fuel Handling Duty Assignments Sheet" (VFTR Form SOP-C.1B) shall be maintained in the control room.
I 4.6 A " Core Loading Diagram" and/or a " Fuel Pit Location Diagram," as necessary, will be available to the Supervisor-in-Charge to enable identification of fuel elements or plates.
4.7 Mi r. i ra ua staffing requirements for fuel transfer operations are as follows:
4.7.1 Supervisor-in-Charge 4.7.2 Radiation Control person 4.7.3 Equipment operator 4.7.4 Control room operator (licensed Reactor Operator)
REV 4, 2/85
SOP-C.1 PAGE 4 of 14 4.8 Successful completion of the weekly and daily pre-opera-ti o r.al checkouts.
4.8.1 Must be verified prior to adding fuel to the core.
4.8.2 Should be verified prior to removing fuel for inspection.
4.9 All necessary neutron and radiation monitoring systems must -
be in operation.
4.10 The reactor vent system must be in operation for handling l irradiated fuel.
4.11 Operations to transfer the fuel cask and/or the fuel will always be performed in a cautious manner, with the full attention of the tool operators directed to the operation in progress; special operational precautions to be ad-dressed include the following:
4.11.1 When the fuel handling tool is properly latched onto a fuel assembly, there will be about 1/2 inch of free vertical movement of the tool before it " clicks" against the lifting lug of the assembly.
I 4.11.2 When lif ting a fuel assembly into the fuel transfer cask, the element must be drawn up by the lif ting line until the safety line is taut. Failure to do so can I result in damage to the assembly when the cask drawer strikes against the assembly when being closed.
4.11.3 If the fuel handling tool is properly latched onto an assembly, it cannot be operated to release the element; release can only be accomplished by taking the weight of the assembly of f the tool by setting the assembly down I onto a supporting surface--an attempt to force release may damage the tool.
5.0 References 5 .1 UFTR Safety Analysis Report S.2 UFTR Technical Specifications 5.3 UFTR S0P-A.1 l 5 .4 UFTR SOP-C.2 5.5 UFTR SOP-D.1 I
REV 4, 2/85 lI a
l S0P-C.1 PAGE 5 or 14 l
5.6 UFTR SOP-D.2 5 .7 UFTR Dosimeter Log 6.0 Records required 6 .1 UFTR Form SOP-C.1A (UFTR Fuel Trans fer Log Sheet) 6.2 UFTR form S0P-C.1B (Irradiated Fuel Handling Duty Assignments) 6.3 UFTR Form SOP-D.2A (Radiation Work Permit) 6 .4 UFTR Dosimeter Log 6.5 UFTR Operating Log 7 .0 Instructions 7 .1 Personnel duties and responsibilities 7.1.1 Supervisor-in-charge 7.1.1.1 Directly supervise the transfer of fuel and remain cegoizant of ancillary operations.
7.1.1.2 Verify positive latching of fuel handling tool onto I the fuel.
7 .1. 2 Radiation Control Personnel 7 .1. P. 1 Set up control point boundaries and those radiation warning signs required by 10 CFR 20, UFTR procedures, the Radiation Work Permit (UFTR form S0P-D.1A), or the Supervisor-in-charge.
7 .1. 2 . 2 Maintain the Radiation Work Permit to assure that the requirements set forth in the P,WP are being complied with by all personnel in the area controlled by the RWP.
7 .1. 2 . 3 Serve as Control Point Monitor as required to monitor personnel entering and exiting the controlled area.
7 .1. 2 . 4 Monitor general activity levels as follows:
l REV 4, 2/85
SOP-C.1 PAGE 6 of 14 I 7.1.2.4.1 Conduct beta-gamma surveys in the core area, the vicinity of the shield tank and around the fuel pit area.
7.1.2.4.2 Take e swine of the transfer cask drawer following ,
each transter of fuel; take other swipe surveys as ;;-
necessary.
7.1.2.4.3 Take periodic air samples in the reactor cell to check for airborne activity.
I 7 .1. 2 . 5 Use a hand held survey instrument to:
I 7.1.2.5.1 Verify fuel movement into or out of the transfer cask.
7.1.2.5.2 Verify that the fuel handling / lifting tool has disengaged from the fuel to ensure that the fuel is not being withdrawn from the cask as the tool I 7.1.2.6 is withdrawn.
Maintain radiological records at the direction of the Supervisor-in-Charge.
7.1.3 Equipment operator (s)
I 7.1.3.1 In general the equipment operator will operate equipment specifically necessary for transfer operations at the direction of the Supervisor-in-Charge.
7 .1. 3 .2 (Tool operator) manipulates the f al handling tool ,
and shall verify positive latchi.g and unlatching of the tool from the fuel.
7.2.3.3 (Crane operator) operates the crane as necessary to position and transport the fuel transfer cask.
7 .1. 3 .4 (Lif ting line operator) manipulates the lif ting t ol
, to:
7.1.3.4.1 Support the fuel handling tool (and thus the fuel) when the fuel transfer cask drawer is being opened
. or closed.
7.1.3.4.2 Li f t the fuel handling tool, and the fuel, when l fuel is being drawn up into the fuel transfer l cask.
1 REV 4, 2/85
SOP-C.1 PAGE 7 o f 14 I 7 .1. 4 Control room operator 7 .1. 4 .1 Monitor appropriate neutron and radiation instrumentation.
7.1.4.2 Maintain the UFTR Operating Log, the Fuel Transfer Log Sheet (UFTR Form SOP-C.1A), and the Irradiated -
Fuel Handling Duty Assignment Sheet (UFTR. Form ~
I SOP-C.1B).
7.2 Preliminary operations NOTE: For fuel removal from the core, all steps of this Section 7.2 must be accomplished; for fuel removal I from the spent fuel pit for inspection, Steps 7.2.5 through 7.2.7 may be omitted; for fuel removal from the spent fuel pit to change the location in the spent fuelpit, Steps 7.2.1 through 7.2.1.3, 7.2.3, 7.2.3.2, and 7.2.5-7.2.7 may be omitted.
7.2.1 Prepare the shield tank to receive fuel for inspection.
7.2.1.1 Remove the shield tank cover.
I 7.2.1.2 Clamp a guide bar across the shield tank to prevent operations directly over the horizontal through-port.
I 7.2.1.3 Set up proper lighting to incl ude under-water illumination.
7.2.2 Prepare fuel pits, as necessary, to receive fuel.
I 7.2.3 Install the neutron source in the core to ensure neutron events are being detected by instrumentation, and assure I all necessary radiation monitoring systems are in operation.
I 7.2.3.1 As a minimum, area radiation and ef fluent activity monitoring systems required for reactor operation by UFTR Technical Speci fications will be operational .
7.2.3.2 As a minimum, neutron monitoring systems required by UFTR Technical Specifications for reactor operation will be operational.
7.2.4 Station the reactor operator at the console.
I 7.2.5 Unstack reactor shielding sufficiently to permit access to the core.
I l REV 4, 2/85
SOP-C.1 PAGE 8 of 14 l l
l 7.2.6 Place the steel protector plate atop the core area with the guide pins in place.
l I
7.2.7 Bring up reactor primary coolant and remove the magnet power key from the console. .
I
~
7.2.8 Check that all necessary radiation and neutron monitoring systems are in operation.
7.2.9 I Before attempting to handle fuel with the fuel handling tool; 7.2.9.1 Attach a length of safety line from the fuel handling I tool to the transfer cask with a snap hook, limiting excessive vertical movenent of the fuel .
I 7.2.9.2 Adjust the leng.h of the safety line so that, with the lif ting line pulled taut, a dummy fuel element suspended from the fuel handling tool will hang about 1 inch above the fuel transfer cask drawer.
7.3 Fuel removal from the core:
7.3.1 At the direction of the Supervisor-in-Charge, remove the fuel box shield plug and wedging pin from the fuel box.
I 7.3.2 Perform a radiation survey as the shield plug is removed; this survey should be performed by radiation control personnel.
7.3.3 Transfer one fuel assembly into the fuel transfer cask as follows:
7.3.3.1 Position fuel transfer cask.
7.3.3.2 Make safety line connection.
7.3.3.3 Make lifting line connection.
I 7.3.3.4 Latch tool onto fuel and verify positive latching by checking that the tool has about 1/2 inch free movement before " clicking" against fuel lif ting lug.
7.3.3.5 Raise fuel into fuel transfer cask by operating lifting line until safety line becomes taut.
I
- I REV 4, 2/85
SOP-C.1 PAGE 9 of 14 I '
7.3.3.5.1 Veri fy fuel movement into the transfer cask by radiation survey.
7.3.3.5.1 Veri fy that the fuel bundle is moving freely and I not lifting an adjacent bundle by an interference of the assembly nuts and bolts as the element is being raised from the core.
~
7.3.3.6 Close the fuel transfer cask drawer after verifying that the lifting line is supporting the element so that the safety line is taut--failure to perform this action can result ir. damage to the fuel element.
7.3.3.7 Disengage and remove fuel handling tool from cask.
Verify by radiation survey that the tool disengages.
7 .4 Fuel removal from the spent fuel pit:
7.4.1 At the direction of the Supervisor-in-Charge, remove the shield plug from the spent fuel pit position from which the fuel assembly is to be removed.
I 7.4.2 Position the transfer cask guide over the spent fuel pit location.
7.4.3 Position the plastic guide tube liner on the designated spent fuel pit location.
7.4.4 Position the transfer cask on the guide plate.
7.4.5 Perform Section 7.3.3 of this procedure (UFTR SOP-C.1).
7.5 Fuel inspection I 7.5.1 Lower fuel transfer cask cautiously into the shield tank until acceptable radiation levels are established.
I 7.5.2 Attach safety line from fuel handling tool to shield tank.
Latch the fuel handling tool to the fuel and verify I 7.5.3 positive latching.
7.5.4 Hold the fuel stationary with the fuel handling tool and use the crane to lower the transfer cask into the shield tank to expose the fuel for inspection.
I 7.5.5 Position the fuel element by manipulating the fuel handling tool for inspection as required.
REV 4, 2/85
SOP-C.1 P AG E 10 o f 14 7.5.6 Position the fuel back into the transfer cask by using the crane to raise the transfer cask while manipulating the fuel handling tool to assure positioning the fuel in the cask.
7.5.7 Unlatch the fuel handling tool and remove the tool.
I NOTE: The weight of the fuel element must be off of the tool before the tool can be unlatched.
7.6 Transferring fuel from transfer cask to spent fuel pit:
I 7.6.1 Position the plastic guide tube in the upper part of the designated fuel pit.
7.6.2 Position the steel guide plate over designated pit.
7.6.3 Position fuel transfer cask on guide plate.
7.6.4 Make safety line connection.
7.6.5 Make lifting line connection.
7.6.6 Attach (latch) fuel handling tool to fuel assembly and verify positive latching.
7.6.7 Pull lifting line taut.
7.5.8 Open fuel transfer cask drawer.
7.6.9 Lower fuel slowly into designated spent fuel pit.
7.6.10 Unlatch fuel handling tool from. fuel assembly and remove tool; verify that the fuel handling tool has diseng. aged I by using a radiation detector to check that the fuel does not rise as the tool is removed.
7.5.11 Make a swipe survey of the transfer cask.
7.7 Reinserticn of irradiated fuel into the core after inspection.
NOTE: It is understood that the operation of removing one fuel assembly from the core, inspecting and returning it unaltered to its original location in the core will not produce an unknown effect on the
' reactivity of the core; for this reason, controls, prerequisites, and initial conditions of this procedure may be used as the prerequisites while REV 4, 2/85 l
l
S0P-C.1 PAGE 11 of 14 I
I Section 7.7.2 will be used as the actual procedure for placing an assembly back into its original position in the core following inspection.
7.7.1 Place either the left-handed or right-handed, *--
I spring-lipped wooden chute into the fuel box in the desired position.
7.7.2 Position the fuel transfer cask over the chute.
I 7.7.3 Hake safety line connection.
7.7.4 Hake lifting line connection.
7.7.5 Attach (latch) fuel handling tool to the fuel assembly and veri fy positive latching by checking resistance to upward tension.
7.7.6 Pull lifting line taut.
7.7.7 Open the fuel transfer cask drawer.
I 7.7.8 Use the fuel handling tool to lower the fuel slowly and completely into the fuel box.
I 7.7.9 Unlatch the fuel handling tool from the fuel assembly and remove the fuel handling tool.
Verify that the fuel handling tool has disengaged I 7.7.9.1 from the fuel assembly by using a radiation detector to check that the fuel does not rise as the fuel handling tool is removed.
I 7.7.10 Make~a swipe survey of the fuel transfer cask.
7.7.11 Remove the wooden chute from the fuel box.
I l
t
{
1 REV 4, 2/85
S0P-C.1 PAGE 12 of 14 I
l I
l 1
I APPENDIX I FORMS SUPPORTING FUEL TRANSFER ,
I I
- I l
I lI I
I I
I lE
!E REV 4, 2/85
l 50P-C.1 PAGE 13 of 14 ;
UFlTI FORM SOP-C. I A UFTR FUEL TRANSFER LOG SHEET oATE REACTOR CORE l SHIELD TANK FUEL STORAGE PITS TIME INTO TIME TIME TIME TIME PST TIME Pl.ATC NUMBER CUT IN TIME SHIPPING OUT S t4 NUMBER IN OUT CASK I
I -
I_
I &Gh p=64 em4 I - -
Em m W
Ih 6 i - _
gOff m3
=
r O2n E
T A
D W
O S L T E N D E
M L M
N E G N ;\
,' \
I r , ,
S O 'i,\
S S A R U E I I' F
. T C U D
- D N F"
C G A M C N S I I M L IM R D D N T F A l
l E R V T L I F E T U U C F C F
D F E E T
A T I S D I -
A L -
R -
R I
R O R R RA T T E E O O OE N M A NL NL T T K T R L L I O
E R R I E I E A AN AA E E O O L OE E LV LV RA RA R V V P R IT SG P E E EE ET ET E E R I R O GL GL PR P PI L L LR LO T VA N N OA OD OP N N OT RH E I R I R L OR OR OM R RA B E C N TE TT LE LE LL O P A FP FW CE CE TI TR UN OR OI OE DP DP NN NE J R P O OO OH OU AP AP OC I I SI C LU LL T C TS OP TF RU RU C F CC l m2 u
- N2m.
I SOP 0.4 PAGE 1 OF 7 UFTR OPERATING PROCEDURE 0.4 1.0 10 CFR 50.59 Evaluation and Determination 2.0 1 1 Approval ' -
Reactor Safety Review Subcommittee . . . .
ff M%
Date Facility Director . . . . . . . . . . . . .
) r ,.
I]w #-- 2d/71 [5 Date I
I I
l l
i l
l REV 0, 3/85 I
I S0P 0.4 PAGE 2 0F 7 3.0 This procedure (UFTR S0P-0.4) addresses the proper review of pro-posed changes in equipment, systems, tests, experiments or proce-dures. This procedure assures the proper reviews are obtained in I evaluating and making determinations relative to proposed actions to determine whether or not they involve unreviewed safety ques-tions as described in 10 CFR 50.59 and the UFTR Technical Speci-I fications.
"10 CFR 50.59 Determination" or "Unreviewed Safety Question Eval-uation and Determination."
This review and evaluation will be referred to as a 4.0 Limits and Precautions 4 .1 The originator of a proposed change in equipment, systems, I tests, experiments or procedures should assure that the pro-posed action is described in sufficient detail to allow proper evaluation as to whether an unreviewed safety question is in-vol ved .
4.2 This procedure is intended to address only changes in equip-I ment, systems, tests, experiments or procedures.
dure does not address normal maintenance operations to include repl a c emen t of failed systems or components with identical This proce-items.
A .3 Prior to implementation, the proposed changes in equipment, systems, tests, experiments or procedures require review by:
4.3.1 Only UFTR Management (Level 2 and Level 3)~provided the answers to ell questions in Section 7.3 are negative for two reviewers, both Senior Reactor Operators.
4.3.2 UFTR Level 2 and 3 Management as well as the Reactor Safety I Review Subcommittee if the answer to any evaluation ques-tion in Section 7.3 is positive.
4.4 UFTR Form S0P-0.4A, "Unreviewed Safety Question Evaluation and Determination" should be used for making all 10 CFR 50.59 de-terminations.
I 4.5 The 10 CFR 50.59 Determination shall not be considered complete until all required signatures are obtained on UFTR Form S0P-0.4A along with answers and bases for answers.
4.6 A positive 10 CFR 50.59 determination requires submission of an application to the Nuclear Regulatory Commission for license I amendment as per 10 CFR 50.90 before the proposed action can be impl eme n t ed .
4.7 All outstanding negative 10 CFR 50.59 Evaluations by the UFTR Level 2 and 3 Management shall be reviewed within three (3) months by the RSRS to be considered closed issues.
REV 0, 3/85
S0P 0.4 PAGE 3 0F 7 5.0 References 5.1 10 CFR 50.59 5.2 10 CFR 50.90 5.3 UFTR Safety Analysis Report 5.4 UFTR Technical Specifications "
5.5 UFTR Standard Operating Procedures 6.0 Records Required 6.1 UFTR Form SOP-0.4A (Unreviewed Safety Question Evaluation and Determination) 6.2 Reactor Safety Review Subcommittee Minutes 7.0 II.structions 7 .1 Requirements for a 10 CFR 50.59 Evaluation and Determination I are contained in the documented responses to two sets of ques-tions as delineated on UFTR Form SOP-0.4 A to determine whether a proposed action involves an unreviewed safety question.
I 7.2 Answers to all questions require addressing the basis for the response whether positive or negative. Note that all questions I must be answered as affirmative or aegative; if any doubt ex-1sts, the answer shall be af firmative.
I 7.3 Questions to be answered for making the 10 CFR 50.59 Evaluation are:
Does the proposed action represent a change in the UFTR as I
7.3.1 described by the Safety Analysis Report? (Altering the UFTR facilities, systems, or components enumerated, de-scribed, or diagrammed in the UFTR Sa fety Analysis Report) 7.3.2 Does the proposed action represent a change in the proce-dures described by the Sa fety Analysis Report? (Access and I Key Controi in tne Reactor Cell, Standard Operating Proce-dures, Test and Maintenance Procedures, Security Proce-dures) 7.3.3 Does the proposed action represent a test or other experi-
! ment not described in the Safety Analysis Report and not previously performed? (A new experiment, new surveil-lance) l REV 0, 3/85
S0P 0.4 PAGE 4 0F 7 l
7.4 Questions to be answered in making the 10 CFR 50.59 Determina- l tion are:
7.4.1 Does the proposed action pose an increase in either the probability of or the severity of an accident or malfunc-tion previously evaluated in the Safety Analysis Report?
(Failures and malfunctions of components and systems im-portant to safety, nuclear excursions during operation, nuclear excursions during fuel loading, safety-control blade system malfunctions, loss of coolant accident, fission product releases) 7.4.2 Does the proposed action pose the creation of a previously unidenti fied accident?
7.4.3 Dues the proposed action result in the reduction of a safe-ty margin as defined in the bases for the UFTR Technical Specifications?
7.5 If all answers to the 10 CFR 50.59 Evaluation in Section 7.3 are negative, then the 10 CFR 50.59 Determination is negative.
A positive (yes) response to any of the questions in Section 7.3. requi res that Section 7.4 be completed; a positive (yes) response to any of the 10 CFR 50.59 Determination questions in I Section 7.4 then indicates that the proposed action does present an unreviewed safety question.
I 7 .6 If a proposed action is determined to involve an unreviewed safety question or a change in the Technical Specifications, then the proposed action cannot be approved and cannot be carried out as proposed without NRC permission. In this case, I the Licensee shall submit an application for amendment of the license pursuant to 10 CFR 50.90, " Application for Amendment of License or Construction Permit."
REV 0, 3/85 l
S0P 0.4 PAGE 5 0F 7 I
I
. I :
I I
APPENDIX A UFTR FORM S0P-0.4A i UNREVIEWED SAFETY QUESTION EVALUATION AND DETERMINATION I
I I
I I
I I
REV 0, 3/85
S0P 0.4 PAGE 6 0F 7 UFTR FORM SOP-0.4A UNREVIEWED SAFETY QUESTION EVALUATION AND DETERMINATION I. Responses to Questions Required for 10 CFR 50.59 Evaluation (See Section 7.3):
Response Basis for Response 7.3.1 I 7.3.2
'f l 7.3.3 Reactor Manager Date 7.3.1 ~
7.3.2 7.3.3 I 7 .3 .1 Facility Director Date 7.3.2 7.3.3 RSRS Chairman Date II. Pesponses to Questicr.s Required for 10 CFR 50.59 Determination (See Section 7.4):
Response Basis for Response 7.4.1 7.4.2 l
I 7.4.3 I 7.4.1 Reactor Manager ~Date 7.4.E _
l l
7.4.3 Facility Director Date 7.4.2 7.4.3 i
RSRS Chairman ~ ~ Date I
S0P- 0.4 PAGE 7 0F 7 l UFTR FORM S0P-0.4A 7 <0 INSTRUCTIONS I 7 .1 Requirements for a 10 CFR 50.59 Evaluation and Determination are con-tained in the documented responses to two sets of questions as delineated on UFTR Form SOP-0.4A to determine whether a proposed action involves an unreviewed safety question.
7.2 Answers to all questions require addressing the basis for the response I whether positive or negative. Note that all questions must be answered as affirmative or negative; if any doubt exists, the answer shall be af firmative. ,
7.3 Questions to be answered for making the 10 CFR 50.59 Evaluation are:
7.3.1 Does the proposed action represent a change in the UFTR as described I by the Safety Analysis Report? (Altering the UFTR facilities, sys-tems, or components enumerated, described, or diagrammed in the UFTR Safety Analysis Report) 7.3.2 Does the proposed action represent a change in the procedures de-scribed by the Safety Analysis Report? ( Access and Key Control in I the Reactor Cell, Standard Operating Procedures, Test and Maintenance Procedures, Security Procedures) 7.3.3 Does the proposed action represent a test or other experiment not described in the Safety Analysis Report and not previously performed?
(a new experiment, riew surveillance) 7 .4 Questions to be answered in making the 10 CFR 50.59 Determination are:
7.4.1 Does the proposed action pose an increase in either the probability I of or the severity of an accident or malfunction previously evaluated in the Safety Analysis Report? (Failures and malfunctions of compo-nents and systems important to safety, nuclear excursions during oper-I ation, nuclear excursions during fuel loading, safety-control blade system malfunctions, loss of coolant accident, fission product re-leases) 7.4.2 Does the proposed action pose the creation of a previously unidenti-fied accident?
I 7.4.3 Does the proposed action result in the reduction of a safety margin as defined in the bases for the UFTR Technical Specifications?
7.5 I If all answers to the 10 CFR 50.59 Evaluation in Section 7.3 are nega-tive, then the 10 CFR 50.59 Determination is negative. A positive (yes) response to any of the questions in Section 7.3 requires that Section 7.4 be completed; a positive (yes) response to any of the 10 CFR 50.59 Deter-mir,ation questions in Section 7.4 then indicates that the proposed action ooes present an unreviewed safety question.
I 7.6 If a proposed action is determined to involve an unreviewed safety ques-tion or a change in the Technical Specifications, then the proposed action cannot be approved and cannot be carried out as proposed without I NRC permission. In this case, the Licensee shall submit an application for amendment of the license pursuant to 10 CFR 50.90, " Application for A;rendment of License or Construction Permit."
I
SOP-E.7 PAGE 1 OF 10 UFTR OPERATING PROCEDURE E.7 1.0 Measurement of Temperature Coefficient of Reactivity 2.0 Approval 7 ,
Reactor Safety Review Subcommittee . . . . . . . f '
/m% 1 I batd Director, Nuclear Facilities. . . . . . . . . . .[f
[!T./![{
' Dste I
I l 1
lI
'I
'I I s REV. O, 5/85 I
i--
++
k g3 IMAGE EVALUATION 1es11Anoercur.3)
(([j 9[*/g, <-
,, s ..
ig,g,,c,g+
= g)4,+,$3+ %g l.0 N E24 l5 39 OLE I.I fE I.8 1.25 1.4 1.6 l
4 150mm >
- ff ,y%L #* /4 sp# %hth 4
9 7/ <
O '. 4
- $s*p a
E .
)
4 ko 4 gp,y:3t>4, , _ _1, .
n.
y+p> <+Q;s .
E I l,0 lf m m E im 53m s=u =
M O!!N l,l l.8 1.25 1.4 1.6 4 150mm >
4 6" >
w$>;>!%i A**A
< s>a 4 %
g 0% )) , 7/ +%v*, '
!: _ _n o
5*&
0
- +
O
($bg, t IMAGE EVALUATION [/jp/
4)fy N,y p/ TEST TARGET (MT-3) p [s' ,
a 2
M+fx 44$"%
B 1.0 lf L# Na
'w MmB'=2 =
l,l 1.8 1.25 1.6 14 4 150mm >
< 6" >
Nr *i/Wyj -
4+ s%s -
+ ? v# V AjjF L ++4 ,@,,q gl/
O l,
>4,
.- J _
S0P E.7 PAGE 2 0F 10
'I 3.0 Purpose and Discussion 3.1 General 3.1.1 As a Limiting Condition for Operation, the UFTR Technical Specifications, Section 3.1 on Reactivity Limitations in Paragraph (3) on Coef ficients of Reactivity requires that "the primary coolant void and temperature ,'
coefficients of reactivity shall be nega-I tive."
3.1.2 Furthermore, as a surveillance requirement pertaining to l limiting conditions for operation, the UFTR Technical Speci fica tions , Section 4.2.1 on Reactivity Surveillance in Paragraph (2) requires that "the temperature coefficient of reactivity shall be measured annually at intervals not to exceed 14 months."
3.1.3 The general method of determining Temperature Coefficient of Reactivity is:
I 3.1.3.1 Determine a critical position at I watt with primary coolant temperature in equilibrium.
3 .1. 3 . 2 Heat up the primary coolant to acceptable high tempera-ture for check at a maximum temperature.
3.1.3.3 Cool the reactor down in steps, controlling regulating blade (RB) position to ensure criticality is estab-lished for each temperature step.
3.1.3.3.1 Record stable critical Regulating Blade (RS)
I 3.1.3.3.2 position at each step.
Record the corresponding temperature at each step for each stable critical position. ,
3 .1. 3 . 4 Determine and record the reactivity associated with each change in RB position.
3.1.3.5 Determine and record the relationship between tempera-ture deviation from the reference condition and the reactivity change required to maintain criticality at I the new temperature.
I REV 0, 5/85
I 3.1.3.6 Determine and record the temperature coef ficient of reactivity (aT) -
I NOTE: The previously determined relationship is non-linear, so the value of the temperature coeffi-cient of reactivity will have different values at different temperatures: a will be deter-mined by the slope of a line [angent to the pre-viously established relationship. :-
3.1.4 Acceptable methods of heating primary coolant include:
3.1.4.1 Use of an external electric hot water heater (up to Ib0 I Kw) connected in a closed loop to the coolant storage tank.
I 3 .1. 3 . 2 Cooldown from operation on nuclear heating above the point of adding heat (this method provides higher tem-peratures for a wider range of possible data points).
4.0 Limits and precautions 4 .1 Heasurement of the Temperature Coefficient of Reactivity to meet the requirements of this procedure should not be attempted within two days of running the UFTR at power to avoid inter-ference of decaying Xenon-135 levels.
! 4.2 For external heatup of the primary coolant using an electric hot water heater, 4.2.1 Reactor Manager approval shall be obtained prior to making the connections to the primary coolant system. l l 4.2.2 The Radiation Control Officer shall be notified prior to l
making the connections to the primary coolant system.
4.2.3 A Radiation Work Permit shall be in place prior to making the connection te the primary coolant system.
4.2.4 The electric hot water heater should be flushed with demineralized water prior to making the connections to the primary coolant system.
4.3 For nuclear heatup of the primary coolant, 4.3.1 Heatup should be terminated at 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> or less to prevent significant Xenon-135 buildup.
4.3.2 Measurements should be taken within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> following I termination of heatup to prevent significant Xenon-135 buildup.
REV 0, 5/85
I 4.4 Both methods of heating are equally acceptable for satisfying the Technical Specification, Section 4.2.1, surveillance requirements on the temperature coefficient of reactivity.
However, it is recommended that the methods be alternated in successive years and that both methods be employed for comparison verification purposes at intervals not to exceed I 5.0 four (4) years.
References 5 .1 UF TR Safety Analysis Report 5.2 UFTR Technical Speci fications 5.3 UFTR S0P-A.2 (Reactor Startup) 5 .4 UFTR SOP-A.3 (Operation at Power) 5.5 UFTR SOP-A.4 (Reactor Shutdown) 6.0 Records Required 6 .1 UFTR Daily Operations Log )
6.2 UFTR Form S0P-E.7A, "UFTR Temperature Coeffficient Measurements Summary" l
6.3 UFTR Form SOP-E.78, "UFTR Temperature Coefficient Data Sheet" 7.0 Instructions 7 .1 Heating the primary coolant:
7.1.1 External heat source.
7.1.1.1 Connect the external electric hot water heater.
7.1.1.1.1 A Level I Radiation Work Permit is required prior to making the connection to the primary coolant sys-tem.
7.1.1.1.2 Reactor Manager approval and Radiation Control Officer notification are required prior to making the connection to the primary coolant system.
7.1.1.1.3 Connections are rade through a circulating pump to I the primary coolant storage tank drain and fill connections.
I REV 0, 5/85
7.1.1.2 Locate heater controls at the Reactor Control Console.
7 .1.1. 3 Secure secondary water.
7 .1.1. 4 Energize the heater.
7.1.1.5 When the primary coolant temperature has achieved the desired temperature, secure the heater power.
7 .1.1. 6 Disconnect the heater from the primary coolant system.
7 .1. 2 Nuclear Heatup:
I 7.1.2.1 Shift secondary cooling to the city water mode.
7 .1. 2 . 2 Start up the Reactor per UFTR SOP-A.2.
7 .1.2 . 3 Proceed to 100 Kw per UFTR SOP-A.3.
I 7 .1. 2 .4 Maintain power at 100 Kw for sufficient time (at least two hours) to allow primary coolant system temperature to reach a high temperature.
7 .1. 2 . 5 Shut the Reactor down per UFTR S0P-A.4.
7 .1. 2 . 6 Secure secondary cooling immediately when either:
7.1.2.5.1 The reactor is shutdown, or I 7.1.2.5.2 Power level on the wide range recorder indicates less than 500 watts.
CAUTI0fl l If secondary cooling is secured before returning to logic for low power, non-heating operations, the lack of flow will cause a trip. On city water the trip is immediate; on deepwell cooling, the trip has a ten (10) second h1ay.
I 7.2 Obtaining data for calculation of Temperature Coefficient of Reactivity with the primary coolant at elevated temperatures.
7.2.1 Start up the reactor to 1 watt per UFTR 50P-A.2.
7.2.2 Mark the I watt critical position and temperature on UFTR Form SOP-E.78.
I REV 0, 5/85
S0P E.7 PAGE 6 0F 10 I
7.2.3 With the reactor critical at I watt, initiate secondary cooling for a short period of time (until temperature is noted to be changing on the 12 point recorder) using the well water cooling supply.
7.2.4 Maintain the 1 watt critical condition by manipulating the regulating blade until coolant temperatures stabilize.
7.2.4.1 Record the stable temperature on UFTR Form SOP-E.78.
NOTE: Typically, temperature stability will require at least 5 minutes of delay.
7.2.4.2 Record the critical RB position on UFTR Form 50P-E.78.
7.2.5 Repeat steps 7.2.2 through 7.2.4 until no discernable dif-I ference is obtained in the regulating blade position between iterations.
7.2.6 Shut the Reactor down per UFTR 50P-A.4. !
7.3 Analysis of data.
7.3.1 On UFTR Form SOP-E.7B, record the reactivity associated with each critical regulating blade noted.
E 7.3.2 On UFTR Form SOP-E.78, write in the difference in reacti-
'E vity between the regulating blade position at each one watt critical position and the regulating blade re ference post-tion at the reference lowest value of temperature recorded.
l 7.3.3 On UFTR Form 50P-E.78, write in the difference between the iE temperature at each data point, and the lowest temperature fg recorded.
7.3.4 On linear graph paper, plot the delta-temperature versus the delta-reactivity of each data point.
7.3.5 On log-linear graph paper, plot the delta-reactivity versus I del ta-temperature , and extrapola te the del ta-reactivi ty to determine a value over the lower portion of the operating range.
7.3.6 On UFTR Forn 50P-E.7A, Step 5, record the temperature coef-ficient of reactivity (O T) at approximately 80 degrees,100 degrees, and 120 degrees, as a minimum; record a I many other temperatures as possible. 7 at as I
I RLV 0, 5/85
_ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - -SOP Eo7 PAGE 7 0F 10 I
NOTE: % at a given temperature is the tangent to the curve generated in Step 7.3.5 at that temperature. Values of a 7 can be determined graphically from the plot by estimating tangents to the curve at the temperatures of interest. Alternately, values of a r can be determined analyti-cally by determining an equation that best fits the data points, and dif- ,
I ferentiating that equation with respect to temperature and determining the value of the differentiated equation at the temperature of interest. Either method l 1s acceptable.
7.3.7 Plot the values of the temperature coefficient of reacti-vity on a curve of aT versus temperature.
7.3.8 Evaluate and compare results of the temperature coefficient I of reactivity with previous measurements; record this information on UFTR Form SOP-E.7A.
7.3.9 Assure that all calculations, curves, and Forms 50P-E.7A and S0P-E.7B are complete and proper signatures are included on UFTR Form S0P-E.7A "UFTR Temperature Coefficient Measurements Summary."
i I REV 0, 5/fl5
I I
I '
I I
APPENDIX I I FORMS FOR RECORDING TEMPERATURE C0 EFFICIENT OF REACTIVITY MEASUREMENTS I ,
I
- I 1
I I
I I
I I REV 0, 5/85
S0P E.7 PAGE 9 0F 10 UFTR FORM S0P-E.7A UFTR TEMPERATURE COEFFICIENT MEASUREMENTS
SUMMARY
(A-3)
- 1. DATE OF LAST MEASUREMENT OF TEMPERATURE COEFFICIENT OF REACTIVITY / CURRENT
!!EASUREMENT DATE Previous: Current:
I 2. BRIEFLY DESCRIBE MEASUREMENT TECHNIQUE (Reference one or both methods of heating discussed in this procedure; note any deviations):
I
- 3. _ RECORD TEMPERATURE / REACTIVITY RESULTS (Use FORM S0P-E.78):
- 4. CRAPH TEMPERATURE / REACTIVITY VARI ATIONS (Reference Section 7.3.4 and 7.3.5)
I 5. INITIAL AND DATE TABULAR AND GRAPHICAL RESULTS:
- 6. RECORD TEMPERATURE COEFFICIENT OF REACTIVITY
- a. I
- c. I 4
I ::
d.
h.
- 6. EVALUATE AND COMPARE RESULTS WITH PREVIOUS MEASURENENTS:
I I
I Performed by Date Rx Mgr/ fat Dir Acknowfidgesnent Date REV 0, 5/85 . _.
50P E.7 PAGE 10 Of 10 I
UFTR FORM SOP-E.78 UFTR TEMPERATURE COEFFICIENT DATA S!!EET t Reference Reactivity Assignment: Ak/k Reference Temperature Assignment: 'F Criticai KB heactivity Cnange in Reactivity Temp. Didnge in Temp.
Position Assignment from Reference Value ( F) from Reference (Units)
I (Ak/k) (Ak/k) _ (*F) l I
e FM I
I nEv 0, s,es
I I
l APPENDIX D l
=
UFTR OPERATOR REQUALIFICATION AND l
RECERTIFICATION PLAN (July,1985 through June , 1987)
I I
I I
I UNIVERSITY OF FLORIDA TRAINING REACE R OPERA E R REQUALIFICATION AND RECERTIFICATION PHOCRAN PLAN (July 1985 through June 1987)
O. CENERAL A training program for the periodic requalification of UPTR operators shall be conducted in accordance with the requirements established by this document. The requalification training for UPTR personnel rneeto or exceeds the requirements established by 10 CFR 55 Appendix A and draf t I ANSI /ANS-15.4 standard dated September 15, 1977 entitled, " Selection and Training of Personnel for Research Reactors."
I Responsibility for the administration of the progra:n shall rest with the Director of !!uclear Facilities of the Departraent of Nuclear Enginoering Sciencer and his/her duly designated representative.
All licenced operators are required to participate in all phases of thio progran except where speciflea11y exempted. Pe rsons in training for an operator's license also participato in the requalification program. An
- cperator receiving a license during a requalification period is required
' to complete only those portions occurring af ter the of fective date of the licence received.
The requalification training program in force at the LTTR shall consist g of eight (8) component areas described in the following sections and listed in Table 1. The requirements that rnunt be mot in order to cornplete g the regualification program succenof ully are delineated in these r:ec t. ions.
= Tabic 1 Operator Requ.nlification and Ihcertification Program Requirement Atcan
- 1. Pequalification scheduln
- 2. Lectures, Re *lewn and Examinations
- 3. Operationn an1 Checkouta
- 4. D,orger.cy Dril Is
- 5. Abnnnco from Authorized Activition
- 6. Evaluation of Operatorn
- 7. Hequalification Hecords 0, nequali f icat ion l'acur ent Review I
I ,
I. REQUALIFICATION SCIIEDULE The (JFTR roqualification progr<u shall be conducted over a period not to exceed two years and shall be followed by successive two-year progr.vna.
To assure that the progratn is ef fective, the various requirements shall be executed according to the time schedules outlined in this progra n guide. The current two-year Requalification Training Schedule (July, 1905
- June, 1987) is contained in Appendix A of this progr.w plan.
II. LEC'IURES, REVIINS AND EXAMINATIONS A. Lectures The requalification program chall be divided into the group of top-ics listed below in Table 2, for which preplanned training or prepa-ration is scheduled. The schedule is set up so that the entire pro-gram covering the topics listed in Table 2 in completed over the two year period.
I Table 2 Requalification Training Lecture Progran Topics
- 1. Nuclear Theory and Principles of Operation
- 2. Design and Operating characterictics
- 3. Instrumentation and Control Syste.u
- 4. Reactor Protection System I 5. Normal, Abnormal and 1:mergency Procedures (one por year l minimum, indepundent of emergency drills) 1
- 6. Radiation control and Safety
- 7. Technical Specifications and Applicable Portions of Title 10, code of l'edoral Regulations 11 Exam i na t. ion s An examination r. hall be a'iminiutored at the end of each lectus e non-nion lia.te d in Table 2, no later than twa weekn af ter the lecturn or I review sension. I'or designated canon, a finat examination covering all tcpico may be substituted for individual examinationn. Runults of the cortif led individual'n evaluation f ron thn examinationn and I from the on-tho-job training dcocaibod under section VI, Paragraph A, " Annual On-tho-Job Training," are n' sed t o dotermino the op<tra-tor'n proficionry, weena" or 'deficioney.
Exacination in encouraq<*1l>ut not required for training nonnionu given but not required by thin p r< y ram.
I ?
f I C. Fuel llandling Prior to any refueling operation arrl/or fuel handling operation, a I special training session shall be held discussing / practicing the re-quired operations and reviewing procedures to annure proficiency of all personnel involved, including emergency actions.
D. Procedure / Technical Specifications Chan7es Any changes in procedures, technical specifications, regulations, as I well as any change with safety significance to the facility shall be reviewed by every licensed operator. Furthermore, a written monthly report suwnarizing the activities in the reactor, including modifi-I cation, mair.tenance, resul's of calibrations and tests, as well as any procedural changes will be distributed to all licensed reactor operators and discussed, as needed.
E. Required Reading List Documents, letters and r:'emos pertinent to oporational safety shall I be maintained in the Required Heading List prior to permanent fil-ing. Each operator is responalble for reviewing the list periodical- ,
(
ly and in a timely manner to remain current with the in f or1na t i on I contained in the Required Heading List. This reading list will be indexed with a master linting with spacen provided for initiala of all required readern. This list should be reviewed at. intervals not I to exceed one month; when an item has been roviewed, thn propar ini-t.ials chould be af fixed to acknowledge completion of review. j
- r. Yearly Review A yearly review of facility operations, maintenance, moili f ica tionn ,
etc. is conlucted with the operating ntalf by the Director of Nu-I clear Facilities or the Heactor Manager using the t!TH Annual Hoport as a basin for the review.
III. REQUALIFICATIO;4 OPl:HATIONS AND CHECKOtfrS A. Peactivity Centrol Manipulottonn, Over the two year requalificat100 per10<!, each certified irn!!vidual nhall perform at loant ton reactivity control manipulationn in any coc.bination of reactor starturn, nhutdownn, or nignificant reac-tivity changen.
To innuro operator proficioney over a rango of ordin iry operationa, I tho following richedule of operations atei checkoutn chall bo main-toine'l by all license opnratorn when the reactor it. operable.
H. f;cheduto of Operationu awl checkout n
- 1. I:ach licenred oporator nhol1 porf or7n at trant. onn eactor I 2.
startup quartorly at intervaln not to exceed four rnon t hn.
IMeh licenne'l operator nhall perform at loant onn daily check-t.u t qua r t o r l y a t intervaln not to overed four unnthn.
3
I 3. Each licensed cperator shall perforTn at least one weekly check-out semi-annually at intervals not to exceed eight months.
C. Credit for Reactivity Control Manipulations For the purpose of raeeting requalification requirements, each li-censed operator and senior operator may take credit only for reac-tivity control manipulations which they perform themselves.
D. Records It is the responsibility of each operator to incure that these re-quirements are met and logged in the ope ra to r's Requalification I folder. Each operator shal; also log monthly operating hours in the same folder.
{
I IV. EMERGENCY DRILLS Ehergency drills shall be hold quarterly. At 1 cast once per year theno 1
drills shall involve the participation of the t'niversity police Depart-ment, the Cainesville Fire Department and other emergency assistance teams as appropriate for the drill in question. Each operator is required to participate in two emergency drills per year at intervals not to ex-I cced eight months. A review of the delli and applicable emergency proco-duros shall be performed with all certified individuals within seven days after completion of the drill.
V. ADSENCE FROM AtmlORIZED ACTIVITIES I An operator who han not been actively perforTning certified functions for a pariod in excess of four rnonths nhall be required to demonstrate to the Reactor Manager or duly authorized representative that his/her knowledge an.1 understanding of the operation and administration of tho facility are sat.lsfactory before returning to certified dution. This shall be accom-plichel through an interview and evaluation o_r a written, oral or opera-tional examinition or a suitable combination thereof. Any detleiencica I uricovered functionn. roust be corrected before the individual renumes authorirod VI. EVAL,UATION OP OPERMORS A. niennial Evaluationn An in-depth evaluation of the operating performanco of each lice.nned operator r; hall be perfortrext an i documented blonnially aml/or prior to tho tr re-ccrtification onnivernary t o innuru that they have the I knowledge, competence and dexterity to operat e the reactor safoly and to take appropriate actionu in ronponse to abnormal nituatlong that rnay arico.
The ovaluation shall includo renultn f rom the examinat ionn, t ho an-nual on-the-job evaluat ion of oporational proficioney (ao dolineated I under paragraph D of thin Section), and any other available indica-tionn of tho oporator'n capability to elinchargo hin/ hor dut ion in a nafo and cmpetont rnanner.
4
B. Annual On-the-Job Training Each licensed Reactor Operator and Senior Reactor Operator shall demonstrato satisfactory understanding of the operation of the fa-cility systems, operating procedures and facility procedure license changes during an annual walk-through examination administered by a designated Senior Reactor Operator.
C. Grade Requirements All operators are required to complete each examination natisfac-torily according to the following requirements:
- 1. A grade higher than 80s requires no additional training.
- 2. A grade in the rango of 65%-79% requires additional training in I those areas or topics wheero weaknesses or deficiencies are in-dicated. This training shall be completed within 60 days from the date the examination was adminiatored.
- 3. With a grade of less than 65%, the individual shall be placed in an accelerated retraining program in those areas whern weak-nesses or deficiencies are indicated.
Additional appropri.to training requirements in the form of formal lectures, tutoring, scif-study or on-the-job training l shall be based on the results of examinations conducted.
D. Accelerated Training l
Accelerated training projramn chall be completed within four monthn following tho grading of the examinations, rurthermore, within one month after the grading of the exa-ination, thoro chall be an eval-(
I uation by tho Eeactor Manager or a designated representat.ivo t.o do-tornino if the deficiencies uncovered warrant withdrawal of the in-dividual's certification pending covietion of the accelerated I training program. The evaluation shall considor the individual'a past perfomanco record, the nupervisor's ovaluation and pant test ocoron an well ao current dof telencies. An or al exarn rnay alno be given to aid in the evaluation. Regardless of tho ocore, if thn in-dividual's tent inlicates a defielency in a critical area that af-f cctr, enf ety, a training pro';ran shill t,e ad;ninictored to correct the deficiency promptly.
E. Additional Training itequire-'ents Additional training chall be provided whenever needed to correct, weaknesses or deficienciou uncovered, f;uch additional training shall be comploted prior to t he conctunion of the opocific requalification I program or applicat. ion for renewal of operator'u licenun, whichever occurr- firnt.
I s
P. Additional Evaluation An evaluation shall be made of an operator at any time his/ hor phy-I sical or mental condition appears impaired in a manner that his/her performance of duties as an operator appears to be affected. Any exenplary perfomances or additional duties performed by an operator shall be noted in his/her Requalification Folder to aid later eval-I uations.
VII. RCQUALIFICAiION RECORDS A. Operator Requalification Records I operator requalification records shall be kept to assur i that all the requirements of the "UFTR Operator Requalification and Recerti-fication Progra:n Plan" are met.
Each operator shall have an individual folder containing signature blocks for lectures attended, prepared or assigned scif-study ses-sions, reactivity manipulations perforned, weekly and daily check-outs performed, and quarterly drills participated in by the opera- (
tor. The folder shall also contain copics of written examinations administered, the anwers given by the operator, results of any evaluations and documentation of any additional training adminis-tered in areas in which an operator has exhibited deficiencies. The performance of, or participation in, special activities such as fuel iI handling by the individual operator, shall also be logged in the ap-plicable Requalification Folder.
D. Requalification Training Manual iI A Master Requalification Training Manual will be used to organize training requirements; this manual shall contain a schedule of all
,l required lectures, reviews, emergency drills, and other exercises.
lW The date the item is performed shall be indicated on this schedule.
A section of this manual shall bo designated to contain completed training items, attendance sheets, master copics of tests given and lecture outlines if available.
I A separato section of thin manual shall also indicato licenso amend-mont corvaitr ents and the datea for each including relicense daten for all licensed operatorn,
- c. Facility Recordn _
Required docurnentn and recorda pertaining to the Requalification I Program shall be maintaine! at the UrTR as part of tho facility recordn for a period of five yearn.
I I e
VIII. REQUALIFICATION DOCUMENT REVIFW The individual Requalification Folders shall be reviewed on a semi-annual basis by a designated Senior Reactor Operator and shall be noted by the inclusion of the SRos dated signature. Any deficiencies noted during the review shall be brought to the attention of the Director of Nuclear Faci-lities or the Reactor Manager who will then insure that appropriate ac-tion is taken.
References:
10 CFR 55 A erican National Standard ANSI /ANS-15. - 1977 (N380)
I I
l l
l I
I I
t
I
_ mx, I
I 8
UFTR REQUALIFIs' ATION TRAINING SCIIEDULE 1985 to 1986 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER (L) Design & (L) Nuclear Theory &
- EMERGENCY Operating Principles of DRILL Characteristics ___
Operation EMERGENCY DRILL (S) Annual Report Review JANUARY FEBRUARY MARCH APRIL MAY JUNE (L) Normal Abnormal EMERGENCY (L) Reactor (I) Operator Walk- EMERGENCY and Emergency DRILL Protection throughs DRILL Procedures System o- INVOLVES POLICE, FIRE DEPARTMENT, ETC.
(?) = FRACTICAL TRAINING (S) = STAFF TRAINING (I) = INDIVIDUAL TRAINING (L) = LECTURE M M M M M M M M M m
UFTR REQUALIPICATION TRAINING SCHEDULE 1986 to 1987 JULY AUGUST SEPTEMBER OCTOEER NOVEMBER DECEMBER (L) Instrumen- (L) Radiation EMEPGENCY (L) Technical
- EMERGENCY tation & Control and DRILL Specifica tion s DRILL Control Safety (S) Annual Report Systems Review JANUARY TEBRUARY MARCH APRIL MAY JUNE (I) Operator Walk- EMERGENCY (L) Normal, Abnormal EMERGENCY th roughs DRILL Emergency DRILL Procedures
- = INVOLVES POLICE FIRE DEPARTMENT, ETC.
(P) = PRACTICAL TRAINING (S) = STAFF TRAINING (I) = INDIVIDUAL TRAINING (L) = LECTURE L
g M M M E W W E E E E E E E