Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000286/LER-2003-002, From Indian Point Unit 3 Regarding Manual Reactor Trip for Fire in Main Turbine Insulation Due to Rearing Oil Leak +
- ML17328A889 +
- ML18058A436 +
- BSEP 13-0045, Request for Notice of Enforcement Discretion (NOED) Technical Specification 3.7.3, Control Room Emergency Ventilation (Crev) System, Technical Specification 3.8.1, Technical Specification 3.8.4 and Technical Specification 3.8.7 +
- ML19203A018 +
- ML19203A016 +
- L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG +
- L-2019-153, Exigent Technical Specification Amendment Request Supplemental RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG +
- L-2019-149, Exigent Technical Specification Amendment Request RAI Reply One-Time Allowed Outage Time Extension for Inoperable EDG +
- ML19203A166 +
- ML19148A744 +
- NL-05-005, December 2004 Monthly Operating Report for Indian Point, Units 2 & 3 +
- ML20053E680 +
- NL-03-100, May 2003 Monthly Operating Report for Indian Point 3 +
- NL-03-083, April 2003 Monthly Operating Report for Indian Point 3 +
- ML20062H559 +
- ML20090K053 +
- ML20092M904 +
- ML20148J589 +
- PNO-I-85-057, on 850812,facility Began Shutdown Due to Unusual Event.Caused by Inoperable LPCI Loop a Due to Diesel Generator E3 Out of Svc for Annual Insp & RHR-LPCI Outer Isolation Valve (MO-154A) Not Opening During Surveillance +
- ML20207C330 +
- IR 05000073/1993001 +
- 05000461/LER-1987-050, :on 870825,turbine Generator Tripped on Low Condenser Vacuum Resulting in Reactor Scram.Caused by Nonlicensed Operator Error Resulting from Deficient Valve Lineup Procedure.Procedure Revised +
- 05000387/LER-1986-029, :on 860816,initiations of Standby Gas Treatment & Control Room Emergency Outside Air Supply Sys B Occurred.Caused by Defective GE Electrical Protection Assembly Board (Epa).Board Replaced +
- 05000311/LER-1986-005-02, :on 860715,during Reactor Startup,Voltage Spike Occurred on Vital Instrument Inverter 2B.Caused by Technician Connecting Leads Incorrectly.Technician Counseled.Procedure Revised +
- 05000454/LER-1999-003-02, :on 990513,automatic Reactor Occurred Due to Human Error During Surveillance Procedure.Appropriate Mgt Action Taken with Instrument Maint Involved & Sp Bsir 3.1.6-200 Revised.With +
- IR 05000348/1988005 +
- 05000341/LER-1985-080, :on 851128,operator Failed to Place Radiation Monitor in Svc While Releasing Liquid Effluent.Caused by Operator Error & Supervisor Failure to Follow Procedures. Staff Counseled.Standing Order Issued +
- ML20053E685 +
- 05000413/LER-1990-008, :on 900203,discovered That Insulation Removed from Main Steam Auxiliary Equipment Piping to Auxiliary Feedwater Pump Turbine.Caused by Design Oversight Due to Unanticipated Interaction of Sys +
- ML20092N454 +
- 05000272/LER-1992-007, :on 920306 & 0429,radiation Monitoring Sys Channel 1R11A Spiked High,Resulting in ESF Signal Actuations.Caused by Design,Const,Mfg & Installation Error. Channel Calibr & New Detector Ordered +
- 05000272/LER-1989-032, :on 891109,during Turbine Volumetric Flow Test, power-range Channels Could Not Be Adjusted to 100% Power Due to Bottoming Out of Fine Gain Potentiometer.Caused by Personnel Error.Directives Reviewed +
- IR 05000255/1980013 +
- IR 05000315/1984020 +
- ML20090J115 +
- 05000293/LER-1994-006, :on 940917,unplanned Actuation of Portion of Channel B Core Standby Cooling Sys Logic Circuitry Occurred.Caused by Inadequate Plant Impact Reviews for Activity Performed.Procedure Revised +