MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
=. ._ ... . - . - ~ _ . .
j-
,. ' /, NARRATIVE
SUMMARY
OF
6 110NTHLY OPERATING EXPERIENCE UNIT I FEBRUARY, 1988 February 1 ~ The Unit remained -shutdown for refueling.
through February 4 February 5 At 1255 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.775275e-4 months <br />, the Unit entered Mode 5.
February 6 The Unit remained in Mode 5.
through February 22 February 23 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> , the Unit entered Mode 4.
February 24 At 0736 hours0.00852 days <br />0.204 hours <br />0.00122 weeks <br />2.80048e-4 months <br />, the Unit entered Mode 3.
, February 25 The Unit remained in Mode 3.
through February 27 february 28 At 1332 hours0.0154 days <br />0.37 hours <br />0.0022 weeks <br />5.06826e-4 months <br />, the Unit entered Mode 2.
February 29 The Unit remained in ibde 2.
I'
(
I
~~
p n ry j 68033OO32ces3fo34 ADOCK 050 s
{DR DCD f
, AVERAGE DAILi UNIT POWER LEVEL f
DOCKET NO. 30-33'~
UNIT 3'.~' S t.*ni: Jl DATE March 10, 1988 COMPLETED SY M.A. Winge n TELEPHONE (412) 643-1825 MONTH February, 1988 DAY AVERAGE DAILY POWER LIVEL DAY AVERAGE DALLY POWER LIVEL IM We, Net) (MWe-Net:
I O g7 0 2 0 ;g 0 3 0 0 39 4 0 0
- 0 I O 0 21 ,
n 6
n 0 1 0 0 y
8 0 o 24 9 0 o 10 0 0 26 O 0 lI y 12 0 o 13 0 0 39 14 0 N/A 30 13 0 3{ N/A 16 0 j
l l
INSTRUCTIONS On this format. !at the average hiv anit power le.et :n MWe Net yr esch day .n the reentrine month. C.onnuie na the nearest unule mepwait.
14I77) i
_m. . . _,
UNIT SilUIDOWNS AND POWER REDUCTIONS IMKKE T NO. 314 UNIT NAME 8VPS U881L Il DATE - March 10 1988 REPOR T .'f0NIH February, 1988 COMrLETEla ny M.A. Winger TELLFIlONE (412) 643-18_25 c^
"s.
s' ".O oa ci No.
c 0St 1.icensee ,,
Date "a %o 3U2 Event 0e o Cause & Corrective S
H Q
$5 "
I sS* Report # =g 0 Action to j"$ m o Prevent Recurrence o
ca 2 880201 S 696 C 4 N/A ZZ ZZZZZZ The Unit remained shutdown the entire month of the Unit's Sixth Refueling e
Outage.
u i
1 2
. I I a.ed Reas*"' 3 4 5 Si hcJu c l 8
A F.guipmens f~ailuse (I spliint Hethod: 1.shebes G - Insisus si.=is 1-Manual l'" PacI'38 J8k"' "8 DJ8J B Maintenante e.e Test 2-Manual Scree I naes Sliccas I.u I mesisec r RefuelinK 3-Automatte scram
- 1) Regulataeg Hesiskti."' I sen Rq we e! I H s I sic t NtINI G I th.ceae u Tealning A lesense I sananatioet 4-Continued Fros Previous Month (1891) i AJuunasse.nesvc 5-metuction
- t. Ogicsate.nul I es.u ll mgilanel 9-Other 5 .
l'8/ U ) II(hiecsiI spla .I Isinhos1 Sann-N.ne.c a
=___. .__ ,- . __ . __ . -
y.- .
OPERATING DATA REPORT DOCKET NO.: 50 334 REPORT DATE: 03/10/88 COMPLETED BY: M.A. WINGER TELEPHONE: (412) 643 1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: FEBRUARY 1988
- 3. LICENSED THERMAL POWER (MWt): 2660
- 4. NAMEPLATE RATING (Grose MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860.
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 696.0 1440.0 103728'.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 0.0 59184.2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE: 0.0 0.0 57654.2
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 0.0 0.0 136917319.5
- 17. GROSS ELECT. ENERGY GEN. (MWH): 0.0 0.0 43865720.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): -7720.0 -10920.0 40914773.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 0.0 57.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 0.0 0.0 57.9
- 21. UNIT CAPACITY FACTOR (MDC): PCT 0.0 0.0 51.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0 0.0 50.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 19.7 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
N/A
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: MAR 2.1988
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED :
INITIAL CRITICALITY N/A N/A l INITIAL ELECTRICITY N/A N/A i COMMERCIAL OPERATION N/A N/A 1
F=-
1 NARRATIVE
SUMMARY
OF b
MONTHLY OPERATING EXPERIENCE UNIT II FEBRUARY, 1988 February 1 'The Unit remained shutdown for maintenance.
through February 9 February 10 The reactor was taken critical at 1123 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.273015e-4 months <br />.. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, the reactor was shutdown to repair Pressurizer PORY Isolation Valve (RCS-MOV537).
February 11 The Unit remained shutdown.
February 12 The reactor was taken critical at 1903 hours0.022 days <br />0.529 hours <br />0.00315 weeks <br />7.240915e-4 months <br />.
February 13 The Unit was synchronized at 0614 hours0.00711 days <br />0.171 hours <br />0.00102 weeks <br />2.33627e-4 months <br /> and power was escala ted to a nominal value of 45% to . permit s team gene ra tor level trip setpoint adjustments. At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, a power escalation toward 95% was initiated.
February 14 The Unit operated at a nominal value of 100% output.
through February 16 February 17 At 2104 hours0.0244 days <br />0.584 hours <br />0.00348 weeks <br />8.00572e-4 months <br />, the Unit's output was reduced to 75% to permit leak testing of the 'D' waterbox of the Unit's main condenser.
February 18 At 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br />, the Uni t's output was increased-to approximately 87%.
February 19 At 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />, leak testing of the Unit's main condenser was complete and a power escalation toward 100% output was i ni tia ted . At 0950 hours0.011 days <br />0.264 hours <br />0.00157 weeks <br />3.61475e-4 months <br />, the Unit's output was reduced to 85% to pe rmi t leak testing of the 'O' waterbox of the Uni t's main condenser. At 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />, power was reduced to 60% tc remove the 'B' Main Feed Pump from service for maintenance.
February 20 The Unit operated at a naninal value of 60%' output.
through February 21 February 22 At 0520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br />, the Startup ' Feed Pump was placed in service and power was escalated to a nominal value of 80%. At 1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br /> , the 'B' Main feed Pump was returned to service and power was increased to a nominal value of 100% output.
Februa ry 23 The Unit operated at a nominal value nf 100% output, through February 29
Ri - AVERAGE DAILY UNIT POWER LEVE1.
DOCKET NO. 50-412
. (JNgr BVPS Unit 2 DATE March 10, 1988 COMPLETED SY M.A. Winner TELEPHONE (412) 643 1825 MONTil February, 1988 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I M W'-N 'il iMWe-Net 1 0 802 17 2 0 668 13 3 0 623 19 4 0 447
. 30 5
0 453 6 0 655
., i 7 _0 :3 823 3 0
- 4 818 9 0 818 is 10 0 814 26 ll 0 27 814 0
12 818 13 290 814 39 14 802 ja N/A is 818 N/A 3 ,
16 822 INSTRUCTIONS On this format.!tst the actne d::ily unit :n ser :r.e!:n Mwe Nei tar esch day in the recurring monen.C..mnute u e the nearest whvie mepwatt.
(4177)
g"-~ q UNII SIIU1 DOWNS AND POWER REIMETIONS DOCKE T NO. 50-412 UNIT NAME BVPS IInit 2 f)A TE March 10, 19ss i REPOR T MONIH February, 1988 COMPLE TEg) gy M.A. Winger IEl EPflONE (412) 643-1825 m
' be
- n % ee o oa **
c 0$% Licensee a Cause & Corrective No. Date ". %$ 2 3UE Event 8
. E R
H A
$3 "
I sS* Report # % kS a
Action to
' j"S m o Prevent Recurrence o
ca i
3 880201 S 229 B 4 N/A CA VESSEL Perform maintenance on a leaking pressurizer manway.
la 4 880210 F 65.2 A 1 N/A CA VALVEX The reactor was shutdown to repair pressurizer PORV Isolation Valve
[RCS-MOV537).
5 880217 F 0 B 5 N/A HC ZZZZZZ Reduced output to 75% to permit leak testing the 'D' waterbox of the Unit's main condenser.
! 6 880219 F 0 B 5 N/A IIC 4
ZZZZZZ Reduced output to 85% to permit leak testing of the 'D' waterbox of the Unit's main condenser.
7 880219 F 0 B 5 N/A Cll PUMPXX Power was reduced from 85% to 60% to permit the 'B' main feed pump's removal from service for maintenance.
I I 2 I I n.cd Reasnes 3 4 5 Ss heJu't.I n,ehad:
A Fquipmens failure (i = plaint 1.sluks G Insiiniti.=es
- a. Menu 11 f.n Pserd8d'8 a' "8 lla'a R Maint anse e r Test C Refiseling 2-Manua1 Scree I ness Shcess 8.n I hcasce 3_a,eo., tic Ser== IscueR.p. ealiMiIsictNIINIG D NcFl8') Rc5 k'i.* 4-Continued From Previous Month 014 13 I th.csaine Isainnig A I escuse I saminae"*
i Adeissnesse.neeve 5-lietuc t t on 9-Other 5
- t. Ogweais. nut I is..a il aplane t .
l'8/77) 11 Oslice i1.pl. san t I shibst I 5enw %ense e
i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _m .
', . f-4
- o. \
OPERATING DATA REPORT DOCKET NO.: 50 412 REPORT DATE: 03/10/88 COMPLETED BY: M.A.WINGER TELEPHONE: (412) 643-1825 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUARY 1988
- 3. LICENSED THERMAL POWER (MWt): 2660
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe): 885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE 1AST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERICD: 696.0 1440.0 2511.0 i
- 12. NO. OF RRS. REACTOR WAS CRITICAL: 414.6 1040.5 2006.0
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. hdURS GENERATOR WAS ON LINE: 401.8 1027.7 1977.5
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH): 948305.0 2595823.0 4981460.4
- 17. GROSS ELECT. ENERGY GEN. (MWH): 307600.0 843400.0 1625600.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 285646.0 792196.0 1530300.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 57.7 71.4 73.8
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 57.7 71.4 78.8
- 21. UNIT CAPACITY FACTOR (MDC): PCT 49.3 66.0 73.2 )
- 22. UNIT CAPACITY FACTOR (DER):PCf 49.1 65.8 172.9 I
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 14.0 6.0 9.0 24 SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A j