Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18353B644 +
- ML19148A655 +
- ML19148A653 +
- ML18353B658 +
- NRC-05-0001, December 2004 Monthly Operating Report for Fermi 2 +
- ML20004F381 +
- ML19329B580 +
- ML20101R666 +
- ML20107E194 +
- ML20137Z926 +
- ML20134L169 +
- ML20151Z380 +
- IR 05000213/1987099 +
- IR 05000277/1989015 +
- ML20215G857 +
- U-600928, Ro:On 870506,reactor Manually Scrammed When Reactor Pressure Vessel Level Began to Rise.Caused by Failure of Feedwater Valve Controlling Flow of Water to Reactor to Open.Reactor Shut Down.State of Il & NRC Response Ctr Notified +
- ML20211B273 +
- ML20210B049 +
- 2CAN108607, Monthly Operating Rept for Sept 1986 +
- BVY-97-088, Monthly Operating Rept for June 1997 for Nynps +
- 05000461/LER-1989-026, :on 890621,discovered That Tech Spec Requirements Re Setpoint Verifications for APRM Trip Function Not Fully Met Since Initial Startup.Caused by Deficient Procedure.Mode 1 Checklist Revised +
- 05000413/LER-1986-041-01, :on 860801,surveillance Test Discovered Not Performed for Reactor Bldg Fire Detection Zones After Unit in Cold Shutdown for More than 24 H.Caused by Lack of Procedure Identifying Requirements +
- 05000338/LER-1986-001-02, :on 860119,turbine/reactor Trip Occurred.Caused by Difficulties W/Positioning Turbine Overspeed Protection Controller Keyswitch.Key Replaced +
- 05000259/LER-1988-019-02, :on 880608,unanticipated ESF Actuations Occurred.Caused by Jumper Falling Off While Plant Personnel Replacing Fuse.Personnel Involved Instructed to Be More Careful When Performing Functions +
- 05000483/LER-1995-006, :on 951002,plant Had to Be Shutdown Due to Excessive RCS Leakage & FW Isolation Signal Due to High SG Level.Applied Weld Overlay Per ASME Code Case N-504 +
- 05000260/LER-1999-002-02, :on 990501,SRs for Single CR Withdrawal During Cold SD Were Not Adequately Implemented.Caused by Procedural Inadequacy.Revised Applicable Plant Surveillances.With +
- 05000400/LER-1987-032, :on 870602,radiation Monitor REM-21WL-3541 Sample Chamber Instead of REM-21WS-354 Drained for Disconnection Leaving Monitor Inoperable.Caused by Personnel Error.Procedure HPP-495 Prepared +
- ML050190204 +
- ML14188B773 +
- ML19290G675 +