YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 80-11 FOR THE MONTH OF NOVEMBER, 1980 80 ie39o y yg
OPERATING DATA REFORT DOCKET NO.
50-29 DATE 801210 C05tPLETED BY n- ". Bernard TELEPHONE 61/-36n-9011 X2211 OPERATING STATUS Yankee Row
.N res
- 1. Urdt Name:
- 2. Reporting Penod:
h'e^ e " 10 "
Power level restricted by
- 3. Licensed Thermal Power (51Wt):
600 insta11ation of baffle plates 185 in turbine.
- 4. Nameplate R: tin;(Gross 5!We): _
175
- 5. Desi;n Electric:1 Ratin;(Net SIWE):
180
- 6. Sf aximum Depend:ble Capscity (Gross StWe):
- 7. 51sximum Dependsble Capscity (Net 31We):
175 S. If Chan;es Occur in Capacity Ratin;s (!tems Number 3 Throu;h 7) Since Last Report. Gise Reasons:
- 9. Power Level To Which Restricted.If Any (Net 31We):
150 %'e
- 10. Reasons For Restrictions.If Any:
See N0'e This 5f or.th Yr..to.Date Cumu!stive 720.00 8,040.00
- 11. Hours in Reportin; Period
- 12. Number Of Hours Reactor Was Critic:1 714.03 1.225.63 139.590.28
- 13. Reactor Resene Shutdown Hours 0.00 0.00 0.00
- 13. Hours Generator On Line 710.25 1.190.12 135,217.73
- 15. Urdt Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Ener;y Gener:ted (5!WH) 416,361.00 681,739.70 72,430,061.81
- 17. Gross Electrical Ener;y Genersted (51WH) 110,206.10_,
193,522.20 22,265,675.40
- 18. Net E!ectric:! Ener;y Generated (51WH) 102.543.75 1R0.599.77 _
20.846.743.10
- 19. Unit Service F:ctor 98.65 14.80 76.93
- 20. Unit Availabi!ity Factor 98.65 14.80 76.93
- 21. Unit Capacity F:ctor (Using 5tDC Net)
R1.38 12.84 69.97
- 22. Unit Csp 2 city Factor (Usin; DER Net) 81.38 12.84 69.97
- 23. Unit Forced Outa;e Rate 1.35 82.18 5.41
- 24. Shutdowns Schedu!ed Over Nest 6 Stanths (rype.Date.snd Duration of Each1:
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Oper: tion):
Forecast Achieved INIT !A L CRITICA LITY INITIA L ELECTRICITY CO31.'.!ERCIAL OPERATION t'Q/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET:O. 50-29 UNIT Y1nkee Rowe DATE 801210 CONIPLETED BY D. M, Bernard TELEPHONE 617-366-9011 X2215 5!ONTH E M E3-I 80 DAY AVER AGE D AILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL y.!We-Net )
(31We Net)
I16--
17 147.0 147.5 3
138.8 g3 146.8 19 147.5 3
146. 8 20 147.6 4
146.6 5
21 147.1 146.8 107 1 6
2' 146.5 7
147.3 23 148.6 44 146.I S
148.3 9
25 147.8 148.3 26 149.3 10 87.5 27 148.3 12 1"
4 2S 148 1 148.4 140.0
,9 13 14 148.1 30 148.9 147.3 31 147 I 16 INSTRUCTIONS On this format. list the avers;e da:!/ unit power levelin 31We Net for e::h day in the reportin; month. Compute to the nesrest whole me;swatt.
(9/77)
V
UNITSilU1 DOWNS AND POWElt ItEDUCllONS DOO:ET NO.
50-29 F
9 9
9
~
i uni l' ff AP 10 Y ink m-Rote i
3 dj L.
a DAIE 201210 ItEPollT h!ON111 NOVFilHER. 1980 C0hfPLE ll:D igy D.
fl. Be rn.i rd 11.LLPilONC 617-366-9011 X2215 "k
b.
.!E
$k Litensee E '*
Cause & Cosiccaive N. i.
Date g
gg
,g g 5 Evens a 'a
[$g A,,i;nn in c5 3 5
j fi j llcPutI #
(N0
['
l'actent Itce,ssente d
3 11/11/80 F
9.75 11 3
80-21 EA CKT BRK Ground to offsite 115,000 volt 1ine resulting in loss of Z-126 line.
I 2
3 4
F: l'in t e d Itcason:
F.le t huil:
INint,a G - Insientinens S: Stl eduled A-l'iinipment Failure (Explain) 1-Plannat foi l'icpasain n of Data 11 Maintenance of Test 7-hlannat Scrain.
I:ntiy Sliccts lui 1.itensee C ltcIncling J-Antonnatic Scraan.
Es ent Itepani (LI lti I ile INUlti G.
D.Itegulatney itestriction 4 Other(limplain) 01611 110pcialor l~saining & Litcuse Examination F Ailinini.Iiative G Opciaen.n I I si.a ll'xplain) 08/17) ll Oihen Ilimpt.aini 1:alnt,it I. Saine Sonia
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 801210 CC:!PLETED BY D. v.
Bernard TELEPHONE 617-366-9011 X2215 REPCRT.NONTH Novtsgrg, logo SU!ItARY OF OPERATING EXPERIENCES 11/1/80 Plant load was reduced from 111 MWe to 82 MWe, at 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br />, due to turbine. vibrations. Began increasing load at 0627 hours0.00726 days <br />0.174 hours <br />0.00104 weeks <br />2.385735e-4 months <br />.
11/3/80 Reached 600 MWr (157.9 MWe) at 0432 hours0.005 days <br />0.12 hours <br />7.142857e-4 weeks <br />1.64376e-4 months <br />.
11/11/80 At 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> a plant trip occurred as a ground fault on the Z 126 line (PIR 80-12 & LER 80-21).
At 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br /> the generator was phased on the line.
11/13/80 At 0815 hours0.00943 days <br />0.226 hours <br />0.00135 weeks <br />3.101075e-4 months <br /> the plant was at full power operation.
5 kwi,1 YANKEE AT0h!IC ELECTRIC C0h1PANY ss pleased to announce at us moving to new quarters on or about December 1,1980 1671 Worcester Road Framingham, Massachusetts 01701 617-872 8100