Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41286 +
- ML18141A057 +
- ML20081M425 +
- ML20079C136 +
- ML20112F212 +
- ML20105B954 +
- ML20112H019 +
- ML20148J589 +
- ML20129G167 +
- ML20154M766 +
- ML20066D859 +
- NL-88-1227, Monthly Operating Rept for Oct 1988 for Rancho Seco Nuclear Generating Station Unit 1 +
- 05000312/LER-1988-016, :on 881027,sample Flow to Radiation Monitor R-15546A Lost,Rendering Noble Gas Monitor & Particulate & Charcoal Samplers Inoperable.Cause Unknown.Sample Flow to Monitor Restored +
- 05000312/LER-1988-015, :on 881014,reactor Tripped Due to Grid Disturbance.Caused by Transmission Line Faults.Phase to Phase Fault Protection Extended Past Stagg Substation +
- 05000354/LER-1986-037, :on 860712,grab Sample Not Obtained at 12 H Frequency.Caused by Personnel Error.Supervisor Counseled in Proper Determination of Equipment Operability.Event Will Be Included in Training Program +
- 05000413/LER-1986-001-01, :on 860106,discovered That Carbon Sample Not Taken from Control Room Pressurizing Filter A,Per Tech Spec Requirement.Cause Not Stated.Work Request Issued to Perform Carbon Sample Removal +
- 05000277/LER-1991-009-01, :on 910420,primary Containment Isolation Sys Isolation Occurred.Caused by Failure of Startup Emergency Feed Cable 2.Cables Replaced +
- 05000293/LER-1993-012, :on 930529,unplanned PCIS Group I Isolation Signal Occurred While Opening MSIV During Startup,Resulting in Automatic Closing of Related Valves.Caused by Licensed Operator Error.Group 1 Isolation Reset +
- ML17229A690 +
- 05000269/LER-2013-004, Regarding High Cycle Fatigue Resulted in Reactor Coolant Leak and Unit Shutdown +
- ML20039A527 +
- 05000293/LER-1999-006-02, :on 990705,both EDGs Were Inoperable.Caused by Ambient Air Temp Exceeding 88 Degrees Fahrenheit.Temporary Mods Tm 99-41 & Tm 99-42,implemented for EDG a Were Completed on 990706.With +
- 05000341/LER-1992-006, :on 920611,EECW Sys Automatically Initiated Due to Differential Pressure.Caused by Ineffective Communication Between Site Organizations.Sys Operating Procedure Revised to Only Allow Operation W/Two HXs in Svc +