CPIRAT:'iG DATA RI? ORT
-,.s.-
.v.
DCC:*".'T NO. A n
,1 e DATI ' n, o,
CO.NL*L:.. - D '.Y W.T.
Gillett T-Y::Scyg616-465-5901 C???A-7NG 5"ATUS N#'#8
- 1. Uni: Nz==-
Don'Id c-cmnk 2
September 1983
- 2. Repor:i=; ?: dad.:
- 3. I.!=== sed Th --! ?ower ptW:):
'a11
- 4. Nz=eplai: ?. da;(Cross 5:w=):
1133 1100
- 5. Desis:I:=d=1 R:.:ia;(Ne Stwe):
1100
- 6. 3'- 4 ::=:Depe.ddle C27:=i:7 (Gross 51We):
1060 T. SiM-D=p:=dd!: C:::=:7 (Net MWe)i S. If Ch=:;es C=:in C:- =i:7 R=i=;s (1::=s Nc=h::3 Throu;h il Sine: L:s: R=po::. Cive R= sons:
- 9. Power Leve! To Whid R:s=i==d,If Any (N:: 5twe):
- 10. Re: sons For R-.=i:do:s.If.uv. :
This Month Y:.ao-Cate Cu==hdve 720 6551 50.375
- 11. Ecurs != R:por:in; ?:ded
- 12. Numb =r Cf Hou:s R==::r W:s Cri:ir.!
rn, qca,,
,c 4 e.,,
- 13. R===r R:se. e Sh::dova E==
0 0
0
- 14. Ho= Cc==:::Ca.Lbs 693.3 5545.2 35.506.9 0
0 0
l
- 15. Ur.i: R: serve 5'ne:down Ho=
- 16. Cross Thm.-_! I:=;y Cen =::d (MWH) 2.269.321 16.471.557 114.447.161 1
- 17. Cros:IIe==!I:=;y Cen-=: d G.!WH) 735,750 5,952,500 36.910,250
- 13. Net E==:i=1I:=;y Cene=::d C.;WH)
-709,445 5,745,208 35,585,000
- 19. Uni: Serri=.::==r 96.3 84.6 74.o
- 20. U=i: Ar-E 'aHi y F ::or 96.3-84.6 74.0 93.0.
82.7 70.7
- 21. Uni: C::scity 7:c:r (Us!=;. !DC Nec) t 89.6 79.7 69.5
- 22. Unit C :: city. :cor (Usin; DIR Nett 3.7 2.0 12.3
- 23. Uni:.:om:d Cu::ge R :
- 24. Sh::dowr.s Scheduled over Nec 5 Man:i:s (Type. 0:::.:r.d D=non or I:di:
if M T 'f' upptirrTsm
?/1_R/oM
- 25. If Sht: Down A: Ind Of R:-orr ? :iod. Isti==:ed D::: cister:no:
.25' Units la Tes: S::::s iP=or to C:===:!:10; =:fon1:
Fore =st Acafeved i
INITIA L C?.!T*CA LITY I
!...TIA L. -y N
l C o... u-.,...,,
...,, N.
..s c...
~.
P!'71 Y b5 l
8311170253 830930 l!
PDR ADOCK 05000316 i
l R
.-n-
...n..-,.,.,.
.,en
r-AVERAGE DAILY UNIT POWER LEVEL 00CKET NO. nn _ u n UNIT 2
DATE 1o-3-83 COMPLETED BY"*
T*
Uill***
TELEPHONE 616-465-5901 MONTH yngeomsgr 39s3 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWe-Net)
I no3 17 lo94 2
11 18 1085 3
732 19 1o81 4
los2 20 loss 5
loso 21 1086 6
1047 22 1072 7
1053 1 89 23 8
7054 24 1083 9
1o44 25 559
~
10 lo4a 25 -
1039 11 los4 27 1044 12 loss 28 1o81 13 1o84 29 1o81 14 30
., c c 1o74 15
,nu 31 16 lo95 l
t INSTRUCTIONS On this femat list the average daily unit power level in MWe-Net for each day in the reporting month.
Ccmoute to the nearae wbnlo manwa **
50-316 DOCKETNO.
UNIT SiluTDOWNS AND POWER REI)UCTIONS D.C. Cook - Unit 2 UNIT NAME DATE 10-12-83 COMPLETED HY B.A. Svensson HEPORT MON HI SEPTEMBER, 1983 616/465-5901 TELEPilofJE PAGE 1 of 1 e.
E E
w
$E 3
Yh Eicensee f,
Causc A Censective l
No.
Dale R
Eg s
.@ s $
Event Gy 93 Attiiw. to jE 5
jg Repius Jr
<E L y'
Prevens Recuirence I-6 a
132 830901 F
26.7 II 1
N.A.
ZZ ZZZZZZ The Unit was removed from service to permit entry into the lower contain-ment for inspection of certain tie-down features of the pressurizer en-closure ventilation system. The existing installation was found to be adequate. The Unit was returned to service on 830902 and reached 130%
power on 830903.
133 830914 F
0 A
4 N.A.
Cll ZZZZZZ Reactor power reduced to 55% to re-move the east main feed pump turbine from service to repair tube leaks in 1
the F.P.T. condenser. One tube was plugged. Reactor power was returned to 100% on 830915.
134 830925 F
0 A
4 N.A.
ZZ ZZZZZZ Reactor power was reduced to 40% to permit repairs to be made to an expan-sion joint in the generator bus duct cooling system. Reactor power was re-turned rn 100*' on R30926.
I 2
3 4
f: Fosceil Reason:
Method:
Exlubis G Insituctions
~
S: St hetinleil A-Equipmes; Failuie(Explain) 1 Manual for Prepasalion of Data n Mainienance of Test 2 Manual Scram.
Eusey Sheets fus I.icensee C-Refueling
.l Automatic Stram.
Eveni Reposi ll.ERI File INtlHI G-D Regulatosy Resisiction 4-Othes (lixplain) 0161) li-Operanos Daining & l.icense Examination F Ailmimsinative 5
G Opesalinnal Enor (lixplam) lixhibit I - Same Somce (9/D) ll Other (Explain)
Dockst No.:
50-316
?.
Unit Nama D. C. Cook Unit 2 Completed By:
R.
S. Lease Telephone:
(616) 465-5901 Date:
10/5/83 Page:
1 of 2 f
MONTHLY OPERATING ACTIVITIES - SEPTEMBER 1983 Highlights:
The Unit entered the reporting period operating at 100% power.
During the period there was one outage and two major load reductions.
Details of these are in the Summary.
Total electrical generation was 735,750 MWH.
Summary:
9/1/83 Power reduction was initiated at 1645 hours0.019 days <br />0.457 hours <br />0.00272 weeks <br />6.259225e-4 months <br /> with the turbine generator being tripped at 2037 hours0.0236 days <br />0.566 hours <br />0.00337 weeks <br />7.750785e-4 months <br />, followed by reactor trip at 2210 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.40905e-4 months <br />.
The reason for the outage was to allow entry into the lower containment for inspection of certain tie down features of the pressurizer enclosure ventilation system.
The existing installation was found to be adequate.
9/2/83 The Reactor was returned to criticality at 1155 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.394775e-4 months <br />.
The Reactor tripped from 2% power at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> due to Lo Lo Level in #22 Steam Generator.
The Reactor was returned to criticality at 1954 hours0.0226 days <br />0.543 hours <br />0.00323 weeks <br />7.43497e-4 months <br />, followed by turbine roll at 2219 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.443295e-4 months <br /> and Unit paralleled to the System at 2317 hours0.0268 days <br />0.644 hours <br />0.00383 weeks <br />8.816185e-4 months <br />.
9/3/83 The Unit was loaded to 48% power by 0235 hours0.00272 days <br />0.0653 hours <br />3.885582e-4 weeks <br />8.94175e-5 months <br /> and held at this point due to an indicated Quadrant Power Tilt.
The Quadrant Power Tilt indication cleared and the Unit was loaded to 100% over a 14 hour1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> ramp starting at 0614 hours0.00711 days <br />0.171 hours <br />0.00102 weeks <br />2.33627e-4 months <br />.
9/6/83 Unit loading was reduced 20 MWe at 0325 hours0.00376 days <br />0.0903 hours <br />5.373677e-4 weeks <br />1.236625e-4 months <br /> when some of the pressurizer heaters tripped by thermal overload.
The heater breakers were reset and the Unit was returned to 100% power by 0610 hours0.00706 days <br />0.169 hours <br />0.00101 weeks <br />2.32105e-4 months <br />.
9/14/83 Unit loading was reduced to 55% power over a 1-1/3 hour ramp starting at 0910 to remove the East Main Feedpump from service for maintenance.
Repairs were made and the pump returned to service.
The Unit was reloaded to 100% power over a 7-1/3 hour ramp starting at 2340 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.9037e-4 months <br />.
9/24/83 Unit loading was reduced to 98% power for testing of turbine valves.
Total time below 100% power was 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
Docket No.:
50-316 Unit Names D. C. Cook Unit 2 Completed By:
R.
S. Lease Telephone:
(616) 465-5901 Date:
10/5/83 Page:
2 of 2 9/25/83 Unit loading was reduced to 40% over a 9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> ramp starting at 0004 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
Repairs were made to the Bus Duct Cooling System and power was returned to 48% over a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ramp starting at 1027 hours0.0119 days <br />0.285 hours <br />0.0017 weeks <br />3.907735e-4 months <br />.
Loading was held at the 48%
power level due to an indicated Quadrant Power Tilt.
The indicated Quadrant Power Tilt cleared and the Unit was loaded to 100% power over a 10h hour ramp starting at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />.
9/26/83 The "AB" Emergency Diesel Generator was inoperable for a 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> 8 minute period due to maintenance.
9/27/83 The Preferred Off-Site Power Source to 4KV Auxiliary Power Buses 2A and 2B was inoperable for a 9% hour period while insulators were cleaned.
9/28/83 The Preferred Off-Site Power Source to 4KV Auxiliary Power Buses 2C and 2D was inoperable for a 6-3/4 hour period while insulators were cleaned.
Condenser halfs were out of service, one half at a time, for a period of 32-3/4 hours during the reporting period for the identification and repair of leaks.
The Control Room Cable Vault Halon System remained inoperable the entire reporting period.
The backup CO System remains operable.
2 The Control Room Fire Detection System remained inoperable the entire reporting period.
Hourly fire patrols are being conducted behind the control room panels.
DOCKET NO.
50 - 316 UNIT NAME D. C. Cook - Unit No. 2 DATE 10-12-83 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 4
PAGE 1 of 1:
i MAJOR SAFETY-RELATED MAINTENANCE j
SEPTEHBERs 1983
- M-1
.The CD emergency diesel jacket water surge tank was overflowing.
Replaced the float valve.
C&I-1 Bourdon tube ruptured inside pressure gauge from steam generator blowdown liquid process monitor, R-19.
The pressure gauge was replaced.
C&I-2 A " grounded circuit" indication was received on the turbine supervisory circuit for "CD" battery, which cleared when the i
associated feeder breaker was opened. A solenoid valve coil had shorted to ground.- After replacement of'the coil, the
" ground" annunciator cleared.
C&I-3 Pressurizer water level indicator channel 1, LI-459A, drifted j
higher than the other two channels by 6%. The level transmitter i -
' drain valve and cap were found Eto be leaking. The transmitter reference leg was refilled to restore correct level indication to NLI-459A.
C&I-4 Train A of the Solid State Protection System (SSPS) tested " bad" i
on logic switch 5502,. positions 7 and 10, (Reactor Coolant Pump i
Under Voltage). Universal Cord A-311 was replaced. Train A was then retested and found to be okay.
I l-i T
r
..-ve, u
.m..
_r
..,,_,.,,,--.,._,.,_n,y
- tyy_,
l
(
c X INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465 5901 October 12, 1983 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20553 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of September, 1983 is submitted.
Sincerely, L@
W. G. Smith, Jr.
Plant Manager UGS:ab Attachments cc:
J. E. Dolan M. P. Alexich R. W. Jurgensen NRC Region III E. R. Swanson R. O. Bruggee (NSAC)
R. C. Callen S. J. Mierzwa R. F. Kroeger H. L. Sobel J. D. Huebner J. H. Hennigan A. F. Kozlowski R. F. Hering J. F. Stietzel PNSRC File INPO Records Center k