Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000263/2017002 +
- ML060450475 +
- ML19058A130 +
- U-601538, Responds to NRC Re Violations Noted in Insp Rept 50-461/89-26.Corrective Actions:Procedure 3001.01 Revised to Include Step in Prerequisite Section of Procedure to Place RHR in Standby Mode +
- ML19256F148 +
- ML19344D643 +
- ML19329B621 +
- ML20082H653 +
- ML20101P944 +
- ML20134E121 +
- ML20126G261 +
- ML20272A211 +
- ML20237E620 +
- ML20248E972 +
- ML20211D993 +
- ML22026A206 +
- ML22078A003 +
- ML22271A862 +
- ML23156A241 +
- U-602174, Special Rept:On 930721 & 0803,valid Test Failures of Div I DG Occurred Due to Problem W/Contacts within Breaker Control Switch & Failed Coil in B-C Phase Undervoltage Relay, Respectively.Subj Parts Will Be Replaced During DG Outage +
- ML23339A074 +
- ML21222A060 +
- 05000461/LER-1989-011, :on 890226,water Level in Upper Containment Fuel Pools Dropped Below Min Level of 23 Ft Above Top of Reactor Pressure Vessel.Caused by Insufficient Training. Procedure Re Fuel Pool Cooling Revised +
- 05000461/LER-1989-031, :on 890724,plant Entered Mode 2 Startup W/O Meeting Provisions of Tech Spec 3.0.4.Caused by Personnel Lack of Understanding of Tech Specs & Failure to Recognize Temp Recorder.Training on Tech Specs Increased +
- 05000498/LER-1999-004-01, :on 990516,Unit 1 Experienced Automatic Reactor Trip.Caused by Equipment Failure.Stp Will Evaluate Potential Transformer Testing Procedure for Incorporation of Fuse Resistance Measurements by 990715.With +
- 05000287/LER-1984-006-03, :on 841106,offgas Monitors from Condensate Steam Air Injectors Showed Rapid Increase in Radiation Count Rate.Caused by primary-to-secondary Coolant Leak.Reactor Shutdown,Tests Run & Tubes Plugged +
- 05000352/LER-1992-005-01, :on 920415,security System Experienced Unscheduled Outage & Firewatch Insp Not Performed.Caused by Cognitive Personnel Error in Security.Security Shift Sergeant Counseled +
- 05000353/LER-1994-011-01, :on 941221,condition Was Prohibited by TS in That TS SR for D23 & D24 EDGs Was Not Met Due to Inadequate TS Change Review.Appropriate EDG Loca/Loop ST Procedures Revised +
- ML20030A487 +
- ML19256E782 +
- IR 05000354/1988099 +
- 05000440/LER-2015-001, Regarding Degraded Voltage Relay Found Outside the Allowable Value +
- 05000387/LER-2014-009, Regarding Loss of Both Trains of Control Structure Chilled Water During Application of Clearance Order +
- 05000454/LER-2005-004, Regarding Technical Specification Required Action Not Satisfied Due to Ambiguous Implementing Procedure +
- 05000390/LER-2004-002, Regarding Manual Reactor Trip Due to Dropped Rods +
- B18654, April 2002 Monthly Operating Report for Millstone Units 2 and 3 +
- ML18094A621 +
- IR 05000277/1988099 +
- 05000255/LER-1986-017, :on 860410,excess Primary Coolant Leakage Detected.Plant Placed in Hot Shutdown.Caused by Failure of Valves RV-2006,PRV-1067,-1068 & -1072 to Seat Fully.Valves Repaired & Reseated +
- 05000269/LER-1985-002-02, :on 850122,unit Tripped from 100% Full Power When All Six Intercept Valves Closed for Unknown Reasons Causing High Turbine Header Pressure Which Resulted in High RCS Pressure +