Appendix A NOTICE OF VIOLATION Wisconsin Electric Power Company Docket No. 50-301 Based on the inspection conducted on August 21-24 and 28-31, 1979, it appears that certain of your activities were not conducted in compliance with NRC regulations as indicated. The following is an infractio..
Technical Specification 15.3.10.C defines a rod inoperable if "The rod does not step in properly" and, "It shall be assumed inoperable until it has been tested to verify that it does drop".
The subject specification further states, based on the above definition, "No more than one in-operable control rod shall be permitted during sustained power operation".
Contrary to the above, on the morning of August 10, 1979, from approxi-mately 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br /> tg 0452 hours0.00523 days <br />0.126 hours <br />7.473545e-4 weeks <br />1.71986e-4 months <br /> the reactor was operated with all rods inoperable.
1336 183 20C 7911150