- IR 05000528/2005010 +
- IR 05000346/2011005 +
- ML12058A249 +
- ML12044A361 +
- ML17329A689 +
- ML17329A562 +
- ML17324A921 +
- ML19325C418 +
- ML20045B915 +
- ML20082R947 +
- ML20091P688 +
- ML20091K383 +
- ML20151U300 +
- ML20197J344 +
- IR 05000341/1986031 +
- ML20247E467 +
- ML20236W388 +
- ML20210K582 +
- 05000499/LER-1989-005-01, :on 890320,partial Loss of Offsite Power Due to Failure of Lightning Arrestor.Power to 4.16 Kv ESF Busses E2B & E2C Lossed.Lightning Arrestor Replaced & Will Be Returned to Mfg for Failure Analysis +
- 05000267/LER-1987-026, :on 871111,loss of Instrument Bus 2 Resulted in Scram Actuations.Caused by Low Trip Setting on Backup Power Supply Breaker.Transformer in Battery Charger 1B Replaced & Overcurrent Trip Setting Raised +
- 05000334/LER-1987-008, :on 870422,station in Condition Prohibited by Tech Spec 3.7.7.1 Requiring Either of Two Control Room Habitability Sys Operable.Redundant Temp Control Air Compressor Returned to Svc After Maint +
- 05000414/LER-1986-054-01, :on 861208,containment Air Release & Addition (Vq) Sys Release Terminated.Caused by Actuation of Containment Gas Monitor (2EMF-39L) Alarm.Vq Resampled & Setpoints Verified +
- 05000374/LER-1986-009-05, :on 860511,w/synchronization to Grid at 15% Power,Primary Containment Isolation Sys Group I Isolation Occurred.Caused by Main Steam Line High Flow Signal.Main Steam Line Piping Walked Down.No Leaks Found +
- 05000373/LER-1986-037, :on 860908,primary Containment Isolation Sys Isolation of Groups II & IV Occurred.Caused by Inadequate Out of Svc Taken on Reactor Level Switch.Procedure LAP-900-4 Revised.Personnel Training Initiated +
- 05000301/LER-1985-005-01, :on 851231,reactor Trip Occurred Due to Loss of Electrical Load.Caused by Failed Lightning Arrestor. Lightning Arrestor Replaced,Msiv Repaired & Tested & Fast Bus Transfer Circuitry Response Verified +
- 05000413/LER-1996-003-06, :on 960802,TS 3.0.3 Required Shutdown Initiated,Due to Ventilation Sys Motor Failures.Unit 2 Was Shutdown to MOD 5 Per Requirements of TS 3.0.3.Damaged Motors Were Replaced +
- 05000277/LER-1992-018, :on 920915,security Personnel Discovered That TS Required 1 H Firewatch Performed in Excess of 1 H Interval.Caused by Personnel Error.Security Supervisor Counselled +
- 05000339/LER-1992-001-02, :on 920129,main Feed Regulating Valve C Closed Due to Driver Card Failure,Resulting in Reactor Trip.Caused by Failed Power Supply on Driver Card.Card Replaced.W/ +
- 05000285/LER-1976-008-03, /03L:on 760329,loss of Power Occurred to 161 Kv/ 4160 Volt House Svc Transformers T1A-3 & 4.Caused by Fault in Offsite 161 Kv Supply.Diesel Generators Started to Verify Operability +
- 05000440/LER-1993-014, :on 930703,TS 3.0.3 Entered Due to Failure of Racs Power Supply.Replaced 5 Volt Power Supply in Racs Cabinet +
- 05000353/LER-1990-001, :on 900108,Tech Spec Violation & Reactor Encl Ventilation Isolation Occurred.Caused by Personnel Error. Chief Operator Counseled on Importance of Communicating All Pertinent Info +
- ML24206A179 +
- 05000280/LER-1993-010-01, :on 930821,unit 1 Shutdown for Planned Maint to Repair Leakage on B SG Channel Head Caused by Cracking of Weld Associated W/B SG Channel Head Drain Line.Performed RCS Leak Rate +
- 05000272/LER-1994-004, :on 940131,intentional TS 3.0.3 Entry Made Due to Deenergizing Analog Rod Position Indication (Arpi).Signal Conditioning Module 2SA4 Adjusted & Channel Check Performed to Demonstrate Arpi Operability +
- 05000389/LER-1993-008-01, :on 931102,manual Reactor Trip Initiated Due to High Gas Temps in Main Generator.Caused by Procedural Deficiency.Turbine Lube Oil Cooling Sys Configuration Verified +
- 05000293/LER-2003-001, Re Manual Scram & Completion of a Required Shutdown Due to Recirculation Motor-Generator Trip & Runback +
- ML21082A515 +
- RS-90-203, Circulating Water Sys Availability Analysis River Bend Nuclear Station +
- 05000265/LER-1982-017-03, /03L-0:on 821001,small Leak Discovered in HPCI Sys Supply Steam Line Break Flange.Caused by Failed Flange Gasket.Gasket Replaced like-for-like During & Prior to Outage.Leakage Stopped W/Flange Bolt Adjustments +