Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 50095 +
- IR 05000440/2017001 +
- ML120100509 +
- ML16277A404 +
- ML19345B712 +
- ML19318A903 +
- ENS 42365 +
- ML20045F045 +
- ML20044G038 +
- ML20137V288 +
- ML20137S997 +
- ML20150B301 +
- ML20150B297 +
- ML20247H507 +
- ML20235J465 +
- BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With +
- NG-75-1575, AO 50-261/75-15:on 750921,more than One Inoperable Rod Present W/Reactor at Power as Result of Rod Control Urgent Failure.Caused by Defective Fuse in Ac Power Supply to Rod Control Cabinet 1AC.Fuse Replaced +
- 05000461/LER-1987-054, :on 870916,review Identified That Particulate Filter & Iodine Cartridge for HVAC Stack Process Radiation monitor,ORIX-PR002,not Changed Out within Required 7-day Period.Caused by Personnel Error +
- 05000249/LER-1986-016-07, :on 860927,full Reactor Scram Initiating Signal Received While Reversing Main Condenser Circulating Water Flow.Caused by Component Failure When Setscrews Holding Pinion Gear Vibrated Loose.Setscrew Tightened +
- IR 05000352/1986099 +
- 05000249/LER-1986-016, :on 860927,full Reactor Scram Initiating Signal Received While Reversing Main Condenser Circulating Water Flow.Caused by Component Failure.Operability Restored. Valve Motors & Setscrews Inspected.Gears Safety Wired +
- 05000412/LER-1999-003-01, :on 990311,containment Equipment Hatch Was Not Completely Closed During Refueling Operations.Caused by Failure to Understand Supporting Function of Chain Hoists. Revised Procedure.With +
- 05000293/LER-1997-007, :on 970401,safeguard Buses Were de-energized Due to Severe Storm.Replacement of Microprocessor Control Units Installed in Voltage Regulating Transformers +
- 05000413/LER-1996-002-04, :on 960503,TS 3.0.3 Entered Due to Inconclusive Surveillance Testing.Caused by Ommission of Relevant Info & Inadequate Training.Reviewed Test Procedures & Trained Personnel Re Multimeter Use +
- 05000254/LER-1996-006, :on 960210,TS 3.0.A Incorrectly Invoked Due to Procedural & Operator Knowledge Deficiencies.Policy Statement Developed & Presented to Licensed Operator Re Expectations for Use & Entry Into TS 3.0.A +
- 05000311/LER-1983-041-03, /03L-0:on 830801 & 09,spurious Actuations of Safeguards Equipment Control Sys Channel a Caused Deenergization of Vital Bus 2A.Possibly Caused by near-short Condition on Output Test Panel Terminals +
- 05000266/LER-1994-010, :on 940927,inadvertent EDGs Start,Loss of Two Station Battery Chargers & Unit 2 Loss of DHR Occurred When Control Operator Operating Gas Turbine Incorrectly Manipulated Controls.Subj Equipment Restored +
- LIC-93-0158, Monthly Operating Rept for May 1993 for Fort Calhoun Station Unit 1 +
- LIC-93-0142, Monthly Operating Rept for Apr 1993 for Fcs,Unit 1 +
- ML20027A458 +
- 05000440/LER-2009-003, Regarding Completion of Technical Specifications Required Shutdown Due to Division 2 Emergency Service Water (ESW) Inoperability +
- ML20214V454 +
- 05000413/LER-1985-007, :on 850122,diesel Generators 1A & 1B Started on Blackout Signal.During Troubleshooting on Circuit Breaker 1B,Zone B Lockout Initiated,Causing Trip of 6,900-volt Switchgear.Caused by Design Deficiency +
- 05000331/LER-1994-011, :on 940718,recognized That Surveillance Test Requirement to Demonstrate Operability of a Channel RBM Had Not Been Performed.Caused by Personnel Error.Faulty Rod Select Switch in RMCS Was Replaced +