- ML17317B097 +
- ML18066A365 +
- ML20003B480 +
- ML18153D020 +
- ML20004F381 +
- ML20046D409 +
- ML040490523 +
- ML20095E614 +
- ML20073J907 +
- 05000272/LER-1983-018, Forwards LER 83-018/03L-0.Detailed Event Analysis Encl +
- IR 05000266/1988007 +
- ML20071Q773 +
- ML20206R987 +
- ML20065K958 +
- ML20246C909 +
- ML20236B094 +
- ML20135H309 +
- 1CAN098408, Monthly Operating Rept for Aug 1984 +
- 05000277/LER-1988-017-01, :on 880705,shutdown Cooling Resulted from Spurious High Pressure Signal.Caused by Lack of Contractor Engineer Supervision & Training.Ltr Requiring Proper Guidance to Support Personnel Will Be Issued +
- 05000269/LER-1986-005-02, :on 860314,vent Gaseous Radiation Monitor 1RIA-45 Removed from Svc During Refueling Operations.Caused by Personnel Error.Fuel Movement Stopped Immediately.Monitor Placed Back in Svc +
- 05000277/LER-1988-017, :on 880705,shutdown Cooling Isolation Occurred as Result of Spurious High Pressure Signal.Caused by Lack of Supervision & Training Provided by Engineering Div Over Contractor Engineers.Isolation Reset +
- 05000341/LER-1988-033, :on 880822,RWCU Sys & Outboard Isolation Valves Automatically Closed Upon Receipt of High Differential Flow Isolation Signal.Caused by Steam Voiding in Sys at Pump Discharge Flow Element +
- 05000414/LER-1988-006-01, :on 880219,feedwater Isolation Occurred During Testing of Reactor Coolant Resistance Temp Detectors.Caused by Personnel Not Following Correct Procedure.Incident Reviewed W/Personnel & Procedure Revised +
- 05000353/LER-1991-002, :on 910324,various Actuations of Primary Containment & Reactor Vessel Isolation Control Sys Occurred. Caused by Blown Fuse in Div II 125-volt Circuit.New Battery Charger Procedures Written +
- 05000353/LER-1991-002-03, :on 910324,inadvertent Actuation of Primary & Secondary Containments Occurred.Caused by Blown Fuse During Testing.Procedures for Divisional Safeguard Battery Testing & Preventative Maint Revised +
- 05000339/LER-1991-010-02, :on 911006,condenser Air Ejector Isolation Occurred W/Subsequent Bypassing of Flow to Radiation Monitor.Caused by Failure to Provide Adequate Supervisory Controls Over non-routine Evolution +
- 05000331/LER-1994-010, :on 940710,manual Scram Was Inserted in Response to Impending Loss of EHC Reservior Level.Caused by Crack in 1 EHC Tubing.Repaired Ruptured Tubing & Installed Accumulators on Cvs +
- 05000266/LER-1994-002, :on 940208,both EDG G02 Train B EDG Voluntarily Removed from Svc for Annual Maint.Caused by Power Fluctuations.Damaged Bus Bar & Jumper Wire Replaced +
- 05000334/LER-1990-012, :on 900801,control Room Received 2 Battery Charger Failure Alarm.Caused by Failure of Battery Input Breaker a Phase Lug.Failed Input Breaker Replaced W/ Qualified,Equivalent Spare Breaker +
- 05000498/LER-1993-014, :on 900511,12,14,22 & 23,CR Envelope HVAC Sys Not Operated in Correct Mode.Caused by Increased Administrative Burden & Inadequate Tracking of Lcos. Temporary Labels Placed on Main Control Board +
- ML20024G699 +
- 05000461/LER-1989-040, :on 891206,discovered That Mode Limitations from Surveillance Procedure Omitted,Resulting in Inoperable ATWS Recirculation Pump Trip Sys Instrumentation.Caused by Inadequate Procedure.Surveillance Revised +
- ML19351E151 +
- 05000280/LER-1992-005-02, :on 920402,determined That Refueling Containment Integrity Did Not Exist Since Secondary Side of SG B Open for Sludge Lancing.Caused by Inadequate Procedures.Bonnet Reinstalled on Check Valve +
- 05000324/LER-2009-001, Regarding High Pressure Coolant Injection (HPCI) System Inoperable Due to Water in the HPCI Turbine Casing +