Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- U-601577, Special Rept:On 891120,Div 1 Diesel Generator 1A Failed During Surveillance Testing.Caused by Erratic Start Times. Diesel Generator Governors Readjusted +
- ML18141A057 +
- NRC-04-0080, September 2004 Monthly Operating Report for Fermi 2 +
- ML031130520 +
- ML031060438 +
- ML20073F254 +
- ML20148J589 +
- ML20153B310 +
- 05000395/LER-1988-006, Special Rept Spr 88-05:on 880512,safety Injection/Reactor Trip Occurred When MSIV a Shut During Testing.Details Described in Encl LER 88-06.Accumulative Usage Factor for Affected Safety Injection Nozzle Did Not Exceed 0.70 +
- ML20066D970 +
- ML20236R053 +
- ML20236C462 +
- ML20216F947 +
- LIC-88-1019, Monthly Operating Rept for Oct 1988 for Fort Calhoun Station +
- 05000388/LER-1987-001, :on 870110,Limiting Condition for Operation 3.6.3.a Entered When Reactor Bldg Chilled Water Sys Inboard Isolation Valve Failed.Possibly Caused by Valve Failing to Stroke.Solenoid Valve Replaced +
- 05000285/LER-1988-027, :on 881020,steamfitter Disabled by Heat Exhaustion After Exiting Steam Generator.Caused by Contamination of Protective Clothing.First Aid Provided & Victim Taken to Hosp for Medical Treatment +
- 05000395/LER-1988-006-02, :on 880512,safety Injection/Reactor Trip Occurred When MSIV Closed During Testing.Caused by Operation of Test Switch.Action Required by Appropriate Emergency Operating Procedure Initiated +
- 05000498/LER-1988-031, :on 880509,extended Range Neutron Sys Cable Assemblies Mfg by Gamma-Metrics Found Incapable of Performing Required Safety Functions.Caused by Solder Joint Leakage.Cable Assemblies & Detectors Replaced +
- 05000280/LER-1986-002, :on 860108,unit Tripped from 97% Power & Specific Activity Sample of Reactor Coolant Exceeded Tech Spec Dose Equivalent I-131 Limit.Caused by Iodine Spike. Level Monitored Every 4 H +
- 05000280/LER-1986-001-01, :on 860107,reactor Trip Occurred Due to Loss of Instrument Air.Caused by Hot Gas Bypass Valve in Dryer Improperly Adjusted to Maintain Air Temp Above Freezing. Operator Attempted to Gain Manual Control +
- 05000277/LER-1988-004, :on 880302,relay Trip Causing Breaker Trip Resulted in Containment Isolations & Inoperable Fire Pumps. Caused by Severe Heat Damage on Relay Coil.Coil Shipped to Mfg.Temporary Feed Installed +
- 05000277/LER-1988-004-01, :on 880302,relay Tripped Causing Breaker Trip, Resulting in Containment Isolations & Inoperability of Fire Pumps.Caused by Unexpected Trip of Undervoltage Relay.Relay Coil Shipped to Mfg for Failure Analysis +
- 05000456/LER-1997-006-05, :on 970522,TS 3.0.3 Was Entered & Unit 1 Cooled Down Due to ECCS Venting Issue.Caused by Mgt Deficiency. Weekly Ultrasonic Exams of Piping Will Be Performed Until TS Is Changed +
- 05000254/LER-1991-022, :on 911104,CR Train B Air Filtration Unit Declared Inoperable Due to Failing to Attain 15 F Differential Temp.Caused by Inaccurate Flow Measuring Device.Flow Measuring Device Recalibr +
- 05000354/LER-1995-026, :on 951026,RMCS Found in locked-up Condition. Caused by Power Supply Problems to Display Memory Module Card File & Loose Clamp Screw.Power Supply to RMCS Dmm Replaced,Cards Cleaned & Connections Tightened +
- 05000354/LER-1995-026-01, :on 951026,RMCS Found in locked-up Condition Causing Entry of LCO Action Statement.Caused by Failure to Maintain Power Supply within Required Tolerances. Investigation Continuing +
- 05000254/LER-1991-002-13, :on 911104,heater Failed to Attain 15 F Differential Temp.Cause Unknown.Revised Monthly Surveillance to Incorporate New Requirements.Declared B Train Afu Operable +
- 05000352/LER-1991-027-01, :on 911112,inadvertent Actuation of Primary Containment & Reactor Vessel Isolation Control Sys Resulted in Closure of Gas Analyzer Sample Lines to Drywell.Cause Undetermined.Defective Relay Replaced +
- 05000352/LER-1991-026-01, :on 911112,electrical Lead from Primary Containment Isolation Valve to Combustible Gas Analyzer Inadvertently Grounded.Caused by Blown Fuse in Panel. Personnel Counseled & Mgt Directive Issued +
- 05000382/LER-1991-023, :on 911220,CC Valve Discovered Out of Position Due to Inadequate Position Indicator Labeling.Addl Operator Training on Proper Use of OP-100-009 Valves & Breakers Will Be Provided +
- 05000254/LER-1991-022-01, :on 911104, B Train CR HVAC Emergency Filtration Unit Failed to Attain Proper Differential Temp Due to Unknown Cause.Train Declared Inoperable.Supplemental Rept Will Be Submitted +
- 05000374/LER-1991-003-06, :on 910328,reactor Bldg Ventilation Isolation Occurred.Caused by Personnel Error.Personnel Involved Tailgated Operating Crews on Importance of Procedural Adherence +
- 05000254/LER-1990-027, :on 901104,Tech Spec Surveillance Improperly Performed in Economic Generating Control Due to Personnel Error +
- 05000352/LER-1993-010-04, :on 930820,actuation of PCRVICS & ESF Occurred After Reactor Enclosure Exhaust Plenum Radiation Monitor Spuriously Tripped.Cause Not Determined.Sensor Converter for Radiation Monitor Replaced During Testing +
- 05000029/LER-1990-007, :on 900927,incore Instrumentation Spire Failure Resulted in Pressure Boundary Leakage +
- 05000328/LER-1982-019-03, /03L-0:on 820211 During startup,turbine-driven Auxiliary Feedwater Pump Declared Inoperable When Outboard Seal Packing Blew Out.Caused by Normal Deterioration of Packing & Wear of Shaft Sleeve.Packing Replaced +
- 05000335/LER-2005-006, Equipment Failure Led to Inadvertent Mode Change During Cooldown +
- ML15224A289 +
- L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With +