Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 44036 +
- L-PI-03-118, Request for Relief No. 14, Revision 1 for the Third 10-Year Interval Inservice Inspection Program +
- ML033040408 +
- L-02-111, October 2002 Monthly Operating Report for Beaver Valley Units 1 & 2 +
- ML20093H193 +
- ML20071F982 +
- ML20129F549 +
- ML20117H723 +
- ML20202H639 +
- ML20235F038 +
- LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 1 +
- ML20129F418 +
- 05000387/LER-1986-021, :on 860524,controlled Shutdown Initiated When All Emergency Svc Water (ESW) Sys Pumps Declared Inoperable. Caused by 860522 Failure of ESW Pump C Due to Severe Cavitation Damage.Pumps Repaired +
- 05000413/LER-1986-038, :on 860712,vent Particulate,Iodine & Gas Radiation Monitors Discovered Inoperable.Caused by Personnel Error.Output Blocking Jumper Removed Following Maint +
- 05000414/LER-1986-027-01, :on 860627,containment Gas Monitor 2EMF39L Alarmed,Resulting in ESF Actuation That Terminated Containment Air Release.Caused by Spurious Alarm.Work Request Initiated to Resolve Alarm Problem +
- 05000325/LER-1996-008-01, :on 960712,initiated Shutdowns for Both Units. Caused by Hurricane.Synchronized Units 1 & 2 to Electrical Grid Sys +
- 05000334/LER-1995-005, :on 950420,TS 3.0.3 Entry Occurred Due to Isolation of CR Emergency Breathing Air Pressurization Sys. Revised Procedures to Isolate Crebaps Headers During CR Radiation Monitor Testing +
- 05000353/LER-1991-014-02, :on 910801,inadvertent Start of EDG Generator Occurred.Caused by non-licensed Operator Failing to Follow Surveillance Test Procedure.Operator Disciplined.Need for Procedure Complance Reiterated +
- 05000413/LER-1993-003-04, :on 930925,reactor Tripped Due to Inadvertent Closure of Msiv.Caused by Inadequate Self Checking & Independent Verification of Intended Actions.Procedure IP/0/A/3890/01 Will Be Revised +
- IR 05000266/1990006 +
- 05000414/LER-1993-003, :on 930925,reactor Tripped Due to Inadvertent Closure of Msiv.Caused by Inadequate Checking.Corrective Actions:Cros Throttled CA Flow & Entered Procedure EP/2/A/5000/01 +
- 05000346/LER-1978-063-03, /03L-1:on 780605,decay Heat Flowrate Reduced. Caused by Planned Water Level Reduction to Repair Check Valve CF30 Bonnet Leak.Bonnet Gasket Replaced.Reactor Water Level Raised & Decay Heat Flow Returned to Normal +
- 05000311/LER-1980-020-03, /03L-0:on 800729,during Routine Operation, Pressurizer Pressure Channel 3 Would Not Respond to Pressure Changes in Sys.Caused by Shorted Wire on Power Supply. Power Supply Repaired +
- 05000311/LER-1980-020, Forwards LER 80-020/03L-0 +
- IR 05000315/1984015 +
- ML16148A459 +
- ML023240405 +
- ML20212E744 +
- ML20129J050 +
- 05000315/LER-1984-018-01, :on 840814,CRID IV Inverter Abnormal Alarm Activated Due to Crid Failure,Resulting in Reactor Trip & Safety Injection.Caused by Leaking Water from Emergency Shower & Eyewash Station.Design Change Planned +