- Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-02-111 November 7, 2002 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of October 2002.
Respectfully, M. B. Bezilla/
Vice-President DTJ/cmg Enclosures cc:
NRC Regional Office King of Prussia, PA 2-
UNIT SHUTDOWNS REPORTING PERIOD:
DOCKET NO.
50-334 UNIT NAME BVPS Unit #1 DATE November 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 October 2002 No.
Date Type Duration Reason Method of Cause / Corrective Actions (YIM/D)
F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3-Automatic Trip I Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Ucense Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire report period.
In accordance with technical Specification 3.1.3.2, Note (3), the following is required to-be reported in this Monthly Operating Report. On 10/19/02 at 1424 hours0.0165 days <br />0.396 hours <br />0.00235 weeks <br />5.41832e-4 months <br />, after shutting down Containment Air Recirc Fan 11B, Control Rods B-1 0, C-9, D-1 0, D-1 1 and E-1 1 exceeded their indicated alignment with their
-respective banks by greater than 12 steps. Primary voltage readings confir-med that the rods were properly aligned. A calibration adjustment to the Analog Rod Position Indicators (ARPI's) for each rod in order to compensate for the change in Containment air temperature, was completed at 2230 hours0.0258 days <br />0.619 hours <br />0.00369 weeks <br />8.48515e-4 months <br /> on 10/19/02.
All rods were returned to within 12 steps of their group step counters and declared operable.
OPERATING DATA REPORT DOCKET NO.:
UNIT NAME:
REPORT DATE:
COMPLETED BY:
TELEPHONE:
REPORTING PERIOD:
OCTOBER 2002 DESIGN ELECTRICAL RATING (Net MWe):
MAX.
DEPENDABLE CAPACITY (Net MWe):
835 821 50-334 BVPS UNIT #1 11/01/02 DAVID T. JONES (724) 682-4962 Notes:
Rated thermal power at BVPS-I was uprated from 2652 MWt*
to 2689 MWt on 10/20/01.
Net MDC was also uprated from 810 MWe to 821 MWe.
HOURS IN REPORTING PERIOD:
NO.
OF HRS.
REACTOR WAS CRITICAL:
SERVICE HOURS GENERATOR ON LINE:
UNIT RESERVE SHUTDOWN HOURS:
NET ELECTRICAL ENERGY GEN.
(MWH}):
GROSS ELECT.
ENERGY GEN.
(MWH):
GROSS THERMAL ENERGY GEN.
(MWH):
UNIT AVAILABILITY FACTOR (M):
UNIT CAPACITY FACTOR (MDC)
(M&):
UNIT FORCED OUTAGE RATE
(%}):
THIS MONTH 745.0 745.0 745.0 0.0 620770.0 654820.0 2001352.0 100.0 101.5 0.0 YEAR TO DATE 7296.0 7296.0 7296.0 0.0 6009720.0 6360540.0 19480963.0 100.0 100.3 0.0 CUMULATIVE 232320.0 159378.4 156917.9 0.0 117675863.0 125627326.0 387115768.5 69.0 64.4 15.8 la.
- 1.
2.
3a.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
11.
UNIT SHUTDOWNS REPORTING PERIOD:
October 2002 DOCKET NO.
50-412 UNIT NAME BVPS Unit #2 DATE November 1, 2002 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 No.
Date Type Duration Reason Method of Cause / Corrective Actions (Y/M/D)
F: Forced (Hours)
(1)
Shutting S: Scheduled Down (2)
Comments NONE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip I Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other (Explain)
SUMMARY
The Unit began the report period operating at a nominal value of 100% output. On 10/4/02 at 1529 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.817845e-4 months <br /> with unusual atmospheric conditions present combined with limiting Condenser vacuum conditions with a fourth Cooling Tower Pump out of service, the Unit reduced output approximately 1.5% as a conservative measure in order to prevent challenging Turbine trip setpoints. As Condenser vacuum conditions improved and margin to the Turbine trip setpoints increased, the Unit incrementally raised output back to a nominal value of 100% at 2029 hours0.0235 days <br />0.564 hours <br />0.00335 weeks <br />7.720345e-4 months <br /> on 10/4/02. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
OPERATING DATA REPORT REPORTING PERIOD:
OCTOBER 2002 DESIGN ELECTRICAL RATING (Net MWe):
MAX.
DEPENDABLE CAPACITY (Net MWe):
C 836 831 DOCKET NO.:
50-412 UNIT NAME:
BVPS UNIT #2 REPORT DATE:
11/01/02 COMPLETED BY:
DAVID T. JONES TELEPHONE:
(724) 682-4962 Notes: Rated thermal power at BVPS-2 was uprated from 2652 MWt*
to 2689 Mwt on 10/30/01.
Net MDC was also uprated from 820 MWe to 831 MWe.
HOURS IN REPORTING PERIOD:
NO.
OF HRS.
REACTOR WAS CRITICAL:
SERVICE HOURS GENERATOR ON LINE:
UNIT RESERVE SHUTDOWN HOURS:
NET ELECTRICAL ENERGY GEN.
(MWH):
GROSS ELECT.
ENERGY GEN.
(MWH):
GROSS THERMAL ENERGY GEN.
(MWH):
UNIT AVAILABILITY FACTOR (%):
UNIT CAPACITY FACTOR (MDC)
(%):
UNIT FORCED OUTAGE RATE (%):
THIS MONTH 745.0 745.0 745.0 0.0 628611.0 659396.0 2000042.0 100.0 101.5 0.0 YEAR TO DATE 7296.0 6736.6 6669.9 0.0 5376095.0 5668429.0 17295779.0 91.4 88.7 0.3 CUMULATIVE 131103.0 108091.1 107362.5 0.0 83954187.0 88743172.0 270703360.0 81.9 77.3 9.9 la.
- 1.
2.
3a.
- 3.
- 4.
- 5.
- 6.
- 7.
- 8.
- 9.
- 10.
II.