Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 43438 +
- IR 05000263/2017002 +
- ML17325A102 +
- NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 +
- ML092450589 +
- ML091480102 +
- ML083510509 +
- ML082520252 +
- ML18004A500 +
- ML072910347 +
- ML071350482 +
- ML20045B915 +
- ML20042G939 +
- ML20042A991 +
- NOC-AE-04001780, License Amendment Request Proposed Revision to the Technical Specifications Regarding Deletion of Requirements Related to Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process +
- 0CAN050401, Annual Radiological Environmental Operating Report for 2003 +
- ML20062E705 +
- ML022620345 +
- ML022540383 +
- ML20082H774 +
- ML20077H720 +
- ML20076N024 +
- ML20092K164 +
- ML20116B007 +
- ML20137X344 +
- ML20137A935 +
- ML20136F702 +
- ML20148G794 +
- ML20141N638 +
- ML20138H490 +
- ML20134L983 +
- ML20148E280 +
- ML20195C977 +
- IR 05000352/1986004 +
- IR 05000271/1987006 +
- ML20247F307 +
- IR 05000289/1987017 +
- ML18044A007 +
- 1CAN078809, Monthly Operating Rept for June 1988 for Arkansas Nuclear One Unit 1 +
- L-2021-083, Annual Radiological Environmental Operating Report for Calendar Year 2020 +
- BECO-LTR-96-043, Radiological Environ Monitoring Program Rept No 28,Jan-Dec 1995 +
- ML24248A263 +
- L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report +
- 05000352/LER-1989-016, :on 890228,manual ESF Actuation of Refuel Secondary Containment Isolation & Standby Gas Treatment Sys Occurred.Caused by Fuel Pin Dropped During Fuel Reconstitution Activities.Fuel Pin Retrieved +
- 05000412/LER-1987-034, :on 871029,erratic Level Swings in Fifth Point Heater B Observed W/Accompaning High & Low Level Alarms. Caused by Improper Response of Fifth Point Heater B Level Control Valves.Valves Replaced +
- 05000271/LER-1998-016, :on 980609,reactor Scram on High Water Level Was Noted as Result of Stuck Open FW Control Valve.Caused by Inadequate Foreign Matl Exclusion Area Control Fws.Operators Placed Plant in Stable Condition +
- ML20211Q717 +
- 05000336/LER-1986-005-02, :on 860812,while Attempting to Reduce Power from 100% to 30%,plant Tripped at 98% Power.Caused by Added Load of Backup Heaters.Ongoing Mod Underway to Install More Accurate Breaker Trip Mechanisms +
- ML20210G339 +
- 05000272/LER-1986-006, :on 860220,reactor Trip Occurred When Steam Generator Water Level Signal Drifted Closed.Caused by Broken Wire to Solenoid Valve Damaged During Installation. Connections on All Subj Valves Replaced +