Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18094B448 +
- ML20052G660 +
- ML20045B915 +
- ML20041F583 +
- ML040080781 +
- ML021130711 +
- ML20086M105 +
- ML20082R756 +
- ML20081K095 +
- ML20077H669 +
- ML20151W628 +
- ML20196G637 +
- IR 05000254/1986009 +
- AECM-84-0509, Monthly Operating Rept for Oct 1984 +
- 1CAN078307, Monthly Operating Rept for June 1983.W/corrected +
- 05000324/LER-1987-007, :on 870504,Div 1 Group 5 Primary Containment Isolation of RCIC Sys Autoclosed.Caused by Valve Shifts of Involved Electronic Components Due to long-term Thermal Degradation.Faulty Part Replaced +
- 05000341/LER-1999-004, :on 990913,HPCI Sys Was Noted Inoperable.Caused by Failed HPCI Room Temp Switches.Replaced Temp Switches & HPCI Was Restored to Operable Status.With +
- 05000498/LER-1988-013, :on 880204,two Time Delay Relays in solid-state Protection Sys Not Tested During Surveillance.Caused by Inadequate Review of Vendor Technical Manual & Actuation Logic Schematics.Procedure Revised +
- 05000254/LER-1986-017, :on 860318,several ATWS Trips Occurred.Caused by Isolated Instrument Root Valves & Open Drywell Penetration X-49 & Instrument Lines Due to Personnel Error +
- 05000414/LER-1988-025, :on 880626,automatic Reactor Trip Occurred Due to Lo Lo Steam Generator Level.Caused by Personnel Error. Existing Communication Methods Will Be Evaluated & Improved +
- 05000382/LER-1985-036, :on 850801,inadvertent Actuation of ESF Portion of Control Room Ventilation Sys Occurred Due to Spike in Control Room Outside Air Intake Radiation Monitor.Caused by Tears in Foil on Detectors.Detectors Replaced +
- 05000341/LER-1996-014, :on 961004,Div 2 UHS cross-connect Valve de-energized.Caused by Loose Set Screw on Valve Operator Spline bushing.Cross-connect Path Established & Valves Will Also Be Modified W/Set Screw Recess +
- 05000440/LER-1996-008, :on 961004,degraded Breaker Results in Loss of Safety Function & Exceeding TS Action Statements.Caused by Sensor Leads Installed Backwards.Circuit Breaker EF-1-D-09 Replaced +
- 05000498/LER-1992-012, :on 920903,both Channels of Drpi Declared Inoperable & Unusual Event Declared.Caused by Failure of One of Drpi Control Module Power Supplies.One of Two Drpi Power Supplies Replaced & Made Operable +
- 05000354/LER-1994-003, :on 941121,average Power Exceeded License Power Limit.Caused by Personnel Errors.Counseled Personnel & Placed Limitations on Reactor Power and Thermal Limits Until Feedwater Transmitters Calibr +
- 05000354/LER-1992-003-02, :on 920129,inadvertent Isolation of Control Room Ventilation Sys a & Start of Emergency Filter Unit 1 Occurred.Caused by Failed Foil Cover on Channel Detector. Foil Replaced & Detector Recalibr +
- 05000254/LER-1991-011-02, :on 910813,determined That Differential Pressure Could Not Be Maintained During Secondary Containment Capability Test.Caused by Air in-leakage Via Reactor Bldg Roof.Setpoint Changed +
- 05000352/LER-1993-006-01, :on 930506,ESF Actuation Resulted from Rwcs Isolation Due to High RWCU Pump a Room Temp.Faulty Breaker Replaced & Re HVAC Sys Repaired +
- 05000414/LER-1990-004-02, :on 900202,Tech Spec 3.0.3 Entered as Result of Two Channels of Power Range Nuclear Instrumentation Being Out of Acceptable Range.Caused by Defective Procedure.New Procedure Developed +
- ML20030C825 +
- ML20085E998 +
- 05000280/LER-1989-013, :on 890413,lockout of 230 Kv Bus 3 During Performance of Breaker Check in Station Switchyard Occurred. Caused by Personnel Error.Instructions for Const in Switchyard Will Be Provided +
- 05000311/LER-1980-027, Forwards LER 80-027/03L-0 +
- 05000311/LER-1980-027-03, /03L-0:on 800815,during Routine Operation, Auxiliary Feedwater Storage Tank Fell Below Min 200,000 Gallon Level.Caused by Throttling Inlet Valve Too Far During Makeup of Steam Generators.Level Restored +
- 05000296/LER-1999-004-02, :on 990625,facility Core Spray Divisions I & II Inoperable at Same Time Due to Personnel Error.Electrical Supply Breaker to Core Spray Division II Pump 3B Returned to Normal Racked in Position +
- 05000387/LER-2013-007, Regarding Loss of Secondary Containment Due to Drawdown Test Failure +
- 05000311/LER-2012-002, Regarding Auxiliary Feedwater Flow Control Valve Failed Open with Zero Demand +
- ML19269B835 +
- 05000293/LER-2003-004, Regarding HPCI System Declared Inoperable During Surveillance Test Due to Procedure Inadequacy +
- B18654, April 2002 Monthly Operating Report for Millstone Units 2 and 3 +
- IR 05000443/1986099 +
- 05000324/LER-1987-007-02, :on 870504,RCIC Sys Turbine Steam Supply Inboard Primary Containment Isolation Valve (PCIV) & Pump Suppression Pool Suction Supply Inboard PCIV Auto Closed on Group 5 Isolation.Caused by Instrument Drift +
- 05000352/LER-1996-006, :on 960207,control Room Emergency Fresh Air Sys Declared Inoperable.Caused by Flow Switch Coordination Deficiency.Flow Switches Adjusted,Station Guidance Revised & Site Staff Training Performed +
- 05000354/LER-1994-003-03, :on 941121,condition Prohibited by License, Operation of Facility in Excess of Licensed Power Level Due to Personnel Error.Personnel Involved Have Been Counseled & Disciplined +