Text
.
A.
YANKEE ATOMIC NUCLEAR POWER STATION MONTIILY STATISTICAL REPORT 78-12 FOR THE MONTH OF DECEMBER, 1978 7 90117 0 Aff
O OPERATING DATA REPORT DOCKET NO.
50-29 DATE 700112 COh!PLETED BY R. M.
Siogren TELEPliONE (617) 366-9011 X2281 OPERATING STATUS YANKEE R0WE Notes Power limited by
- 1. Unit Name:
December 1978 TS 3-2-1 otherwise
- 2. Reporting Period:
n license limit other 600
- 3. Licensed Thermal Power (51Wt):
than 600 MWt.
- 4. Nameplate Rating (Gross 51We):
185 175
- 5. Design Electrical Rating (Net 31We):
180
- 6. Sf aximum Dependable Capacity (Gross 51We):
175
- 7. 31aximum Dependable Capacity (Net 51We):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
None
- 9. Power Level To Which Restricted. If Any (Net SIWE):
- 10. Reasons For Restrictions,If Any:
None
(
This 31onth Yr.-to.Date Cumulative 744 8.760
- 11. Ilours In Reporting Period
- 12. Number Of Ilours Reactor Was Critical 326.5 7,197.12 131,190.9
- 13. Reactor Reserve Shutdown flours 0
0 0
- 14. Ilours Generator On-Line 244.13 7,093.89 126',878.0
- 15. Unit Reserve Shutdown flours 0
0 o
- 16. Gross Thermal Energy Generated (51Wii) 104.760.0 4,157,906.2 67.573.545.11
- 17. Gross Electrical Energy Generated (5tWil) 13.979.7 __, 1,270,601.3 20.760,948
- 18. Net Electrical Energy Generated (51Wil) 31.478.258 1.193.378.757 19.433.880.66
- 19. Unit Service Factor 19.8 80.98 79.8
- 20. Unit Availability Factor 32.8 80.98
- 21. Unit Capacity Factor (Using 51DC Net) 24.2 77.8 72.4
- 22. Unit Capacity Factor (Using DER Net) 24.2 77.8 72.4
- 23. Unit Forced Outage Rate 2.4 2.4 1.6
- 24. Shutdowns Scheduled Over Next 6 51onths (Type. L) ate,and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY V
C05151ERCIAL OPERATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-29 Yankee Rowe UNIT DATE 790112 CON 1PLETED BY R. M. Sjogren TELEPHONE (617) 366-9011 X2281 L cernber, 1978 SIONT11 DAY AVERAGE D I Y P
'ER LEVEL DAY AVERAGE DAILY POWER LEVEL (31We-Net) 1 0.0 0.0 g7 18 0.0 0.0 3
19 0.0 4
20 21 15 6
22 49 l
101 7
23 8
24 105 9
25 121 124 10 26 142 II 27 158 12 2S I3 29 164 30 165 31 166 16 0_o INSTRUCTIONS On this format list the average daily unit power leselin 5fWe Net for each day n tile rep"rting month. Compute to the nearest whole megawatt.
(9/77)
L'
,. ~
DOCKET NO.
50-29 UNITSIIU1 DOWNS AND POWER REDUCTIONS UNIT NAME V,nt c o pnuo -
790112 DATE COMPLETED itY R.
M. Singren REPORT MONTil December 1978 TELEPIIONE (617T V A on11 X2281
.$E
}
I Licensee Eg e.'3
't Cause & Corrective No.
Date g
3g 2g5 Event gg Action to H
yE 5
3 di c:
Report #
mV E'
Prevent Itecurrence 2
o 6
12 10/21/78 S
493.2 C
1 None N/A N/A Completed Core XIII - XIV refueling and maintenance outage.
13 12/22/78 F
6.05 11 3
None N/A N/A liigh level turbine moisture separator.
l 2
3 4
F: FoucJ Iteason:
Method:
Exlubit G -Instructions S: Scheduled A Eiinipment Failure (Explain) 1-Manual for Picparation of Data Il-Maintenance of Test 7 Manual Serain.
Entry Sheets tor I.icensee C-Itefueling 3 Automatic Scram.
Event Iteport (Llilu File INUltl'.G-D-Itegulatory itestiiction 4-Ot her (Explain) 01611 li-Operator Training & License Examina':on 1 Aihnine.t ative 5
G Opciational I isor (17.xplain)
Exinbit 1 Same Sousee pl/17)
Il-Othee (lixplain)
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 790112 COMPLETED BY R. M. Siocren TELEPHONE (617) 366-9011 X2281 Page one of two REPORT MONTH December, 1978 SU5BfARY OF OPERAT_ING EXPERIENCES 12-1 At the beginning of the report period the plant was shutdown for Core XIII - XIV refueling shutdown.
12-17 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> - Reactor critical, low power physics testing.
12-21 1349 hours0.0156 days <br />0.375 hours <br />0.00223 weeks <br />5.132945e-4 months <br /> - Low power physics testing completed, turbine generator phased to the high lines. Zero to full power physics testing.
1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br /> - Plant load G 150 MWt - Physics testing.
1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> - Increasing load physics testing completed.
12-22 0113 hours0.00131 days <br />0.0314 hours <br />1.868386e-4 weeks <br />4.29965e-5 months <br /> - Turbine trip and reactor scram - high level turbine moisture separator.
0716 hours0.00829 days <br />0.199 hours <br />0.00118 weeks <br />2.72438e-4 months <br /> - Turoine generator phased to the high lines.
0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> - Holding load at 50 MWe due to heater drain tank level control problem *.
1145 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.356725e-4 months <br /> - Commenced load increase and 2230 plant lead at 360 FMt.
12-26 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> - Commenced load increase to 533 FMt.
12-28 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> - Plant load 0 533 MWt.
1445 hours0.0167 days <br />0.401 hours <br />0.00239 weeks <br />5.498225e-4 months <br /> - Commenced plant load increase to 562 MWt.
12-29 0045 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> - Plant at full allowable load of 562 MWt.
0814 hours0.00942 days <br />0.226 hours <br />0.00135 weeks <br />3.09727e-4 months <br /> - Commenced load reduction to 160 MWe, problems with No. 1 heater drain pump.
1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> - Plant load at 160 MWe, #1 heater diain pump isolated -
Icakage.
1110 hours0.0128 days <br />0.308 hours <br />0.00184 weeks <br />4.22355e-4 months <br /> - No. 1 heater drain pump packing added, commenc9d load increase.
- Level control valve improper operations.
s DOCKET NO.
50-29 UNIT Yankee Rowe DATE 790112 CO.'IPLETED BY R. M. Sjogren TELEPliONE (617) 366-9011 X2281 Page two of two REPORT MONTil December, 1978 SUM 5fARY OF OPERATING EXPERIENCES 12-29 (continued) 1225 hours0.0142 days <br />0.34 hours <br />0.00203 weeks <br />4.661125e-4 months <br /> - Plant load at full allowable power 562 MWt.
12-30 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> - Commenced load reduction to 160 MWe to check grounds, on No. 1 heater drain pump.
0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> - Plant load @ 160 MWe.
0240 hours0.00278 days <br />0.0667 hours <br />3.968254e-4 weeks <br />9.132e-5 months <br /> - No ground on No. 1 heater drain pump, commenced load increase to 562 MWt.
Ground was traced to the over-head crane - PCA storage building.
0415 hours0.0048 days <br />0.115 hours <br />6.861772e-4 weeks <br />1.579075e-4 months <br /> - Plant 0 full allowable power level of 562 MWt.