Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16356A567 +
- ML17309A869 +
- ML17255A663 +
- ML17251A692 +
- ML17334B233 +
- ML17334A919 +
- ML17321A467 +
- L-2016-198, Turkey Point, Units 3 & 4, Updated Final Safety Analysis Report, Chapter 7, Instrument and Control +
- ML11291A099 +
- ML101940236 +
- ML20003G443 +
- ML18144A044 +
- ML20029B295 +
- ML20076H561 +
- ML20098H085 +
- ML20096F727 +
- ML20112J923 +
- ML20135A486 +
- ML20247B910 +
- ML20234E328 +
- ML20215L446 +
- L-86-424, Monthly Operating Repts for Sept 1986 +
- LD-85-028, Forwards CESSAR FSAR Clarifications Re Safety Injection Sys Delay Time.Changes Identified as Part of Cleanup Effort to Close Out Amend 10 +
- LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking +
- LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages +
- L-87-581, Forwards 1987 Inservice Insp Summary Rept & Rev 1 to Inservice Insp Summary Results for Outage 2 (1987) First Period,Second Interval +
- ML17347A353 +