Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25295A128 + (ML25295A128)
- L-2025-168, Subsequent License Renewal Commitments 20 and 21 Revisions + (ML25295A251)
- 05000251/LER-2025-005, Unit 4, 4A Main Steam Isolation Valve Failed to Fully Close Resulting in Loss of Safety Function + (ML25295A315)
- CP-202500317, Nuclear Power Plant (CPNPP) - Registration of Dry Spent Fuel Storage Canisters + (ML25295A338)
- L-25-007, Endorsement of Westinghouses Requested Review Schedule for Topical Report WCAP-19042-P, Revision 0, Protk Nuclear Instrumentation System Topical Report + (ML25295A482)
- ML25295A483 + (ML25295A483)
- L-25-190, Vistra Operations Company LLC (Vistra Opco), License Amendment Request - Alternative Technical Specification (TS) 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source + (ML25295A487)
- L-25-008, Support for Urenco’S Exemption Request for Leu+ UF6 Transportation in 30B Cylinders + (ML25295A488)
- ML25295A489 + (ML25295A489)
- ML25295A491 + (ML25295A491)
- ML25295A535 + (ML25295A535)
- PNP 2025-078, Palisades Nuclear Plant, Response to Request for Additional Information Regarding Relief Request Number RR 5-10, Proposed Alternative to ASME Section XI Code Requirements for Modification of Reactor Pressure Vessel Head Vent Line Penetr + (ML25295A537)
- WBL-25-048, Unit 2 - Cycle 6 Steam Generator Tube Inspection Report + (ML25295A538)
- ML25295A539 + (ML25295A539)
- L-PI-25-045, Core Operating Limits Report (COLR) Cycle 34, Revision 0 + (ML25295A685)
- ML25295A685 + (ML25295A685)
- ML25296A019 + (ML25296A019)
- ML25296A020 + (ML25296A020)
- RA-24-0247, Nuclear Power Plant, Units 2 and 3 - AP1000 Combined License Application Departure Report Update and Annual Final Safety Analysis Report (FSAR) Update + (ML25296A026)
- 05000282/LER-2025-003, Nuclear Generating Plant, Unit 1, Nuclear Instrumentation Over-Temperature Delta Temperature Function Inoperable Due to Defective Potentiometers + (ML25296A198)
- ML25296A199 + (ML25296A199)
- ML25296A226 + (ML25296A226)
- ML25296A227 + (ML25296A227)
- ML25296A229 + (ML25296A229)
- ML25296A230 + (ML25296A230)
- 05000237/LER-2024-001-01, Nuclear Power Station, Unit 2, Containment Cooling Service Water Valve Failure Resulted in a Condition Prohibited by Technical Specifications and Loss of Safety Function + (ML25296A231)
- ML25296A460 + (ML25296A460)
- RS-25-145, Unit 1, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1003, Addendum 3, Revision 9, Emergency Action Levels for Clinton Station + (ML25296A461)
- ML25296A465 + (ML25296A465)
- NL-25-0404, Nuclear Plant, Unit 1, Cycle 34 Core Operating Limits Report + (ML25296A467)
- 05000249/LER-2024-002-02, Nuclear Power Station, Unit 3, Low Pressure Coolant Injection Pump Suction Relief Valve Inoperable as a Primary Containment Isolation Valve Resulted in a Condition Prohibited by Technical Specifications + (ML25296A468)
- IR 05000298/2026301 + (ML25297A107)
- ML25297A107 + (ML25297A107)
- ML25297A163 + (ML25297A163)
- ML25297A164 + (ML25297A164)
- ML25297A165 + (ML25297A165)
- ML25297A166 + (ML25297A166)
- ML25297A168 + (ML25297A168)
- ML25297A169 + (ML25297A169)
- ML25297A170 + (ML25297A170)
- ML25297A171 + (ML25297A171)
- ML25297A174 + (ML25297A174)
- ML25297A175 + (ML25297A175)
- ML25297A176 + (ML25297A176)
- ML25297A177 + (ML25297A177)
- ML25297A178 + (ML25297A178)
- ML25297A179 + (ML25297A179)
- ML25297A180 + (ML25297A180)
- ML25297A181 + (ML25297A181)
- ML25297A182 + (ML25297A182)
- ML25297A183 + (ML25297A183)