Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247J985 + (ML20247J985)
- 05000352/LER-1988-042, :on 881223,inoperability of Plant Sys Due to Unacceptable Physical Separation Between safety-related Cabling Determined.Caused by Personnel Error.Plant Procedure Will Incorporate Consolidated Open Items List.W/Undated Ltr + (ML20247J986)
- JPN-89-025, Forwards Application for Amend to License DPR-59,revising Tech Spec Tables 4.1-1,4.1-2 & 4.2-1 to Correct Typos + (ML20247J988)
- ML20247J990 + (ML20247J990)
- ML20247J991 + (ML20247J991)
- NRC-89-0057, Submits Supplemental Response to Allegation RIII-88-A-0054. While Some Statements Included in Specs Intended for Const/ Installation,Engineering Justification Provided Documenting Adequate Qualification for Each Spec Deviation + (ML20247J994)
- ML20247J995 + (ML20247J995)
- ML20247J996 + (ML20247J996)
- ML20247J997 + (ML20247J997)
- ML20247K001 + (ML20247K001)
- ML20247K002 + (ML20247K002)
- 05000416/LER-1989-005, :on 890429 & 0508,RCIC Sys Isolated on Indicated High Steam Line Flow.Caused by Steam Line Pressure Transients,Resulting in Oscillations in Sensing Line. Procedure Re Instrument Calibrs Revised + (ML20247K005)
- 05000220/LER-1998-004-01, :on 980411,identified That Containment Spray Flow Control Valve 80-118 Had Been Left Open Since 980407. Caused by Failure by Chief Shift Operator to Properly Follow Procedure.Procedures Revised + (ML20247K006)
- BECO-89-040, Forwards Update to long-term Plan as Part of Semiannual Rept,Consisting of Commitment Description,Progress Since Mar 1986 Update & Summary of Changes & Reasons Associated W/Regulatory Requirements + (ML20247K008)
- ML20247K009 + (ML20247K009)
- ML20247K010 + (ML20247K010)
- ML20247K011 + (ML20247K011)
- ML20247K012 + (ML20247K012)
- ML20247K013 + (ML20247K013)
- ML20247K016 + (ML20247K016)
- ML20247K017 + (ML20247K017)
- ML20247K018 + (ML20247K018)
- ML20247K019 + (ML20247K019)
- 05000373/LER-1989-009-01, :on 890302,phase to Ground Fault Resulted in Generator Isolation.Caused by Failure Phase C Lightning Arrestor on Primary of Side of Station Auxiliary Transformer + (ML20247K020)
- ML20247K021 + (ML20247K021)
- ML20247K022 + (ML20247K022)
- IR 05000458/1989027 + (ML20247K025)
- ML20247K026 + (ML20247K026)
- ML20247K027 + (ML20247K027)
- 05000364/LER-1989-005, :on 890429,ESF Actuation Occurred When Safety Injection Signal Generated After Train a Solid State Selector Switch Placed in Operate Mode.Caused by Personnel Error.Disciplinary Action Administered + (ML20247K029)
- ML20247K030 + (ML20247K030)
- 05000352/LER-1989-008, :on 890126,various Plant Sys Inoperable Due to Deficiencies in Physical Separation Between Class 1E & non-Class 1E Cables & Different ESF Divs.Caused by Inadequate Procurement Spec.Panels Deenergized + (ML20247K031)
- ML20247K032 + (ML20247K032)
- ML20247K033 + (ML20247K033)
- ML20247K034 + (ML20247K034)
- 05000458/LER-1989-011, :on 890321,leak Rate Test Results of Each Penetration Was in Excess of 2.4 Std Cubic Ft Per Minute. Caused by Corrosion Products Preventing Full Closure of Valves.Maint Work Orders Issued + (ML20247K035)
- 05000271/LER-1989-016, :on 890330,automatic Start of Core Spray & Sys a RHR Pumps Occurred While Pressurizing Primary Containment.Caused by Inadequate Procedure.Design Change That Implemented Logic Change Reviewed + (ML20247K037)
- ML20247K040 + (ML20247K040)
- 05000368/LER-1989-007, :on 890424,snubber on Valve (2CV-4653) on Pressurizer Spray Line Found Disconnected While Performing Inservice Insp of Mechanical Snubbers.Caused by Inadequate Work Controls.Snubber on 2CV-4653 Replaced + (ML20247K041)
- ML20247K044 + (ML20247K044)
- ML20247K046 + (ML20247K046)
- ML20247K047 + (ML20247K047)
- ML20247K050 + (ML20247K050)
- ML20247K053 + (ML20247K053)
- ML20247K054 + (ML20247K054)
- PNO-I-89-061, on 890704,therapeutic Misadministration Occurred When Wrong Patient Administered 250 Rads Co-60 to Lumbar/Sacral Spine Instead of Lung.Patient Identification Strengthened by Using Photographs + (ML20247K057)
- 0CAN059804, Forwards Rev 37 to Industrial Security Plan,Per 10CFR50.54(p).Summary of Changes Described in Attachment.Rev Withheld + (ML20247K058)
- ML20247K060 + (ML20247K060)
- 05000414/LER-1989-016, :on 890616,both Channels of Upper Range Reactor Vessel Level Instrumentation Found Inoperable.Caused by Supervision Assigning Unqualified Technician to Return Instrumentation to Svc on 890528 + (ML20247K061)
- ML20247K062 + (ML20247K062)
- ML20247K065 + (ML20247K065)