Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000443/1989081 + (ML20246E283)
- ML20246E284 + (ML20246E284)
- ML20246E287 + (ML20246E287)
- ML20246E288 + (ML20246E288)
- ML20246E289 + (ML20246E289)
- ML20246E292 + (ML20246E292)
- ML20246E295 + (ML20246E295)
- ML20246E297 + (ML20246E297)
- NUREG-1201, Forwards Proposed Commission Policy Statement on Integrated Scheduling of Plant Mods,Proposed Commission Paper & Supporting Info,For CRGR Consideration + (ML20246E303)
- ML20246E305 + (ML20246E305)
- ML20246E306 + (ML20246E306)
- ML20246E308 + (ML20246E308)
- ML20246E309 + (ML20246E309)
- ML20246E311 + (ML20246E311)
- ML20246E313 + (ML20246E313)
- ML20246E320 + (ML20246E320)
- ML20246E324 + (ML20246E324)
- ML20246E326 + (ML20246E326)
- ML20246E328 + (ML20246E328)
- ML20246E332 + (ML20246E332)
- ML20246E341 + (ML20246E341)
- ML20246E342 + (ML20246E342)
- ML20246E343 + (ML20246E343)
- ST-HL-AE-3062, Forwards Rev 1 to Unit 2 Pump & Valve Inservice Test Plan. Changes Incorporated Into Rev 1 of Plan listed.W/51 Oversize Drawing + (ML20246E344)
- ML20246E346 + (ML20246E346)
- ML20246E348 + (ML20246E348)
- IA-89-175, Final Response to FOIA Request for Records.No Agency Records Subj to Request Located + (ML20246E351)
- ML20246E351 + (ML20246E351)
- ML20246E353 + (ML20246E353)
- ML20246E354 + (ML20246E354)
- ML20246E355 + (ML20246E355)
- 05000458/LER-1989-014, :on 890405,operator Inadvertently Initiated Standby Svc Water Sys During Svc Water Vacuum Release Valve Testing,Causing CRD Pump to Trip.Caused by Operator Error. Operator Reinstructed Re Board Manipulations + (ML20246E359)
- ML20246E360 + (ML20246E360)
- IA-89-174, Final Response to FOIA Request for Records.No Agency Records Subj to Request Located + (ML20246E363)
- ML20246E363 + (ML20246E363)
- ML20246E364 + (ML20246E364)
- 05000260/LER-1989-011, :on 890404,RHR Svc Water Pump Room A-1 Sump Pump Declared Inoperable Due to Problem W/Level Switch Controlling Pump Operation.Caused by Sys Outages in Progress.Rhr Loop II Declared Operable + (ML20246E366)
- 05000325/LER-1989-012, :on 890407,HPCI Sys Steam Line Differential Pressure Transmitter Monitor Operated Outside Required Tolerance.Caused by Conservatively Narrow Dsr Tolerances. Tolerance Range Expanded & Setpoints Revised + (ML20246E368)
- 05000278/LER-1989-001-03, :on 890720,flow Estimate Not Performed When Reactor Bldg Exhaust Flow Recorder Made Inoperable.Caused by Procedure Not Requiring That Flow Rate Be Estimated within 4 H of Removing Recorder.Personnel Counseled + (ML20246E373)
- ML20246E375 + (ML20246E375)
- ML20246E376 + (ML20246E376)
- ML20246E377 + (ML20246E377)
- 05000277/LER-1989-015-01, :on 890721,main Turbine Bypass & Control Valves Opened,Causing Main Steam Line Pressure to Decrease to Approx 480 Psig & Full Reactor Scram.Caused by Malfunction of Pressure Regulator Set.Component Replaced + (ML20246E383)
- ML20246E386 + (ML20246E386)
- ML20246E387 + (ML20246E387)
- ML20246E389 + (ML20246E389)
- ML20246E392 + (ML20246E392)
- IR 05000282/1989019 + (ML20246E393)
- ML20246E395 + (ML20246E395)
- 05000414/LER-1989-007, :on 890316,containment Air Return Fan 2A Started in Response to High Containment Pressure.Caused by Inadequate Policy Involving Control of Sliding Links.Fan Secured & Timer Calibr Reperformed + (ML20246E396)
- ML20246E397 + (ML20246E397)