Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20239A472 + (ML20239A472)
- 05000423/LER-1998-012, :on 980218,potential Failure of Rhrps Due to Loss of Mim Flow Protection,Was Reported.Caused by Lack of Documented Review & Analysis of Historical Design Deficiency.Performed DCR M3-98013 + (ML20239A475)
- ML20239A476 + (ML20239A476)
- ML20239A478 + (ML20239A478)
- 05000482/LER-1987-033, :on 870813,tests of All Types B & C Valves Indicated Leakage in Excess of Tech Spec Limit.Caused by Cognitive Personnel Error.Ltr Issued Outlining Testing Requirements & Maint Activities + (ML20239A480)
- ML20239A481 + (ML20239A481)
- IA-87-569, Final Response to FOIA Request for Documents,Including Ofc of Investigations Investigatory Records.App a Document Totally Withheld (Ref FOIA Exemption 7) + (ML20239A482)
- ML20239A482 + (ML20239A482)
- ML20239A484 + (ML20239A484)
- 05000301/LER-1987-002-01, :on 870816,reactor Trip Occurred.Caused by Lightning Strike to Transmission Line Associated w/2X01 Transformers or Ground Near Transformers.Damaged Corona Ring of 2X01 Phase B Transformer Repaired + (ML20239A487)
- 05000413/LER-1998-015, :on 980805,TS Required Shutdown & Operation Prohibited by TS Associated W/Ice Condenser,Was Initiated. Caused by Lack of Procedural Guidance.Flow Channels Cleared, Foreign Matl Removed,Dented Baskets Repaired + (ML20239A488)
- ML20239A489 + (ML20239A489)
- IR 05000275/1987032 + (ML20239A492)
- ML20239A495 + (ML20239A495)
- 05000413/LER-1998-014, :on 980805,both DGs Inoperable,Resulting in Failure to Perform DG Surveillance within Required Surveillance Interval,Was Revealed.Caused by Misinterpretation of Ts.Ts 4.0.3 Entered + (ML20239A496)
- ML20239A497 + (ML20239A497)
- ML20239A499 + (ML20239A499)
- IR 05000313/1998011 + (ML20239A500)
- ML20239A501 + (ML20239A501)
- ML20239A502 + (ML20239A502)
- ML20239A504 + (ML20239A504)
- ML20239A506 + (ML20239A506)
- ML20239A510 + (ML20239A510)
- ML20239A511 + (ML20239A511)
- 05000346/LER-1996-008-02, Forwards LER 96-008-02 Which Revises Corrective Actions Taken for 961113 Event.Changes Are Marked W/Rev Bar in Margin + (ML20239A513)
- ML20239A516 + (ML20239A516)
- IR 05000302/1998007 + (ML20239A517)
- ML20239A518 + (ML20239A518)
- 05000346/LER-1996-008, :on 961113,switchyard Circuitry Was Declared Inoperable Due to Switchyard Breaker Alignment.Caused by Misunderstanding of Design & Operability Requirements of Switchyard.Performed Required Breaker Alignment Checks + (ML20239A519)
- IA-87-611, Discusses NRR Policy Re Project Manager Review Responsibility.Detailed Procedure Discussing Project Manager & Review Branch Responsibilities Under Program Encl + (ML20239A520)
- ML20239A520 + (ML20239A520)
- IR 05000445/1998010 + (ML20239A521)
- ML20239A522 + (ML20239A522)
- ML20239A523 + (ML20239A523)
- ML20239A524 + (ML20239A524)
- ML20239A525 + (ML20239A525)
- ML20239A526 + (ML20239A526)
- ML20239A527 + (ML20239A527)
- ML20239A528 + (ML20239A528)
- ML20239A529 + (ML20239A529)
- ML20239A531 + (ML20239A531)
- ML20239A535 + (ML20239A535)
- ML20239A536 + (ML20239A536)
- ML20239A538 + (ML20239A538)
- 05000282/LER-1998-009-01, :on 980731,noted That Recent Testing of RCS Vent Paths Had Not Been Performed in Literal Compliance with Wording of TS 4.18.1.Caused by Misunderstanding of Wording in TS Section 4.18.Will Modify Surveillance Procedures + (ML20239A539)
- ML20239A540 + (ML20239A540)
- ML20239A541 + (ML20239A541)
- ML20239A542 + (ML20239A542)
- ML20239A544 + (ML20239A544)
- ML20239A546 + (ML20239A546)
- ML20239A548 + (ML20239A548)