Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236S036 + (ML20236S036)
- ML20236S039 + (ML20236S039)
- ML20236S040 + (ML20236S040)
- ML20236S042 + (ML20236S042)
- ML20236S044 + (ML20236S044)
- ML20236S046 + (ML20236S046)
- B17294, Submits Response to NRC 980416 RAI Re Identification of Items Needed to Be Accomplished Prior to & After Restart for Millstone Unit 2 + (ML20236S049)
- ML20236S050 + (ML20236S050)
- ML20236S051 + (ML20236S051)
- ML20236S052 + (ML20236S052)
- TXX-6944, Supplemental Deficiency Rept CP-87-03 Re Installation of safety-related 6.9 Kv Switchgear on Structural Embedments Which Were Not Level.Initially Reported on 870316.Testing of Switchgear Rescheduled for Completion by 880301 + (ML20236S053)
- 05000374/LER-1987-019-06, :on 871021,RCIC Steam Line High Flow Isolation Switch Found to Have Leakage Across Diaphragm.Caused by Defect in Diaphragm of Switch.New Differential Pressure Switch Installed + (ML20236S056)
- ML20236S058 + (ML20236S058)
- 05000339/LER-1987-016-02, :on 871031,inadvertent Reactor Protection Sys Reactor Trip Signal Generated During Auxiliary Feedwater Pump Time Response & Logic Test.Caused by Procedural Inadequacy.Procedures Revised + (ML20236S059)
- B12735, Informs That Util Will Extend Inservice Insp & Testing Program for Second 10-yr Interval by One Yr,Per Subarticle IWA-2400.New Completion Date for Interval Will Be Completion Date for 1991 Refueling Outage Scheduled for May 1991 + (ML20236S060)
- ML20236S062 + (ML20236S062)
- ML20236S063 + (ML20236S063)
- 05000339/LER-1987-014-02, :on 871022,accumulator Tank Inadvertently Injected Borated Water Into Rcs.Caused by Personnel Error. Administrative Procedure 5.8 Will Be Revised & Event Will Be Reviewed W/Operations Personnel + (ML20236S065)
- ML20236S067 + (ML20236S067)
- ML20236S069 + (ML20236S069)
- ML20236S072 + (ML20236S072)
- ML20236S073 + (ML20236S073)
- ML20236S075 + (ML20236S075)
- ML20236S076 + (ML20236S076)
- ML20236S079 + (ML20236S079)
- ML20236S080 + (ML20236S080)
- ML20236S081 + (ML20236S081)
- ML20236S082 + (ML20236S082)
- ML20236S083 + (ML20236S083)
- PY-CEI-NRR-0731, Application for Amend to License NPF-58,revising Tech Spec Table 4.3.6-1 to Add Requirement to Verify Trip Setpoints. Summary,Significant Hazards & Environ Impact Considerations Also Encl.Fee Paid + (ML20236S085)
- ML20236S087 + (ML20236S087)
- ML20236S088 + (ML20236S088)
- ML20236S090 + (ML20236S090)
- ML20236S091 + (ML20236S091)
- ML20236S092 + (ML20236S092)
- ML20236S095 + (ML20236S095)
- ML20236S096 + (ML20236S096)
- IR 05000445/1987013 + (ML20236S097)
- ML20236S098 + (ML20236S098)
- ML20236S099 + (ML20236S099)
- ML20236S100 + (ML20236S100)
- ML20236S102 + (ML20236S102)
- ML20236S103 + (ML20236S103)
- ML20236S104 + (ML20236S104)
- IR 05000312/1987032 + (ML20236S106)
- ML20236S107 + (ML20236S107)
- ML20236S108 + (ML20236S108)
- ML20236S109 + (ML20236S109)
- ML20236S110 + (ML20236S110)
- ML20236S112 + (ML20236S112)
- ML20236S113 + (ML20236S113)