Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235S636 + (ML20235S636)
- ML20235S638 + (ML20235S638)
- PNO-III-87-098, on 870714,undervoltage on Reactor Coolant Pump Bus Occurred.Caused by Tripping of Unit from 80% Power Due to Voltage Variation.Licensee Decided to Shut Down Unit to Repair Minor Leaks in Reactor Cooling Sys + (ML20235S639)
- ML20235S641 + (ML20235S641)
- ML20235S642 + (ML20235S642)
- ST-HL-AE-2299, Responds to NRC 870615 Notice of Violation 8719-01. Corrective Actions:Lubrite Plate Assemblies in Both Units Inspected & Deficient Plates Reworked to Remove Coatings from Sliding Surfaces & Hilti Bolts Inspected + (ML20235S648)
- U-600975, Forwards Dcrdr Final Rept Addressing Completion of Items Listed in Sser 5,Section 18.3.Attachment 2 Summarizes Human Engineering Observations & Deficiencies Identified & Assessed as Result of Review + (ML20235S650)
- 05000267/LER-1987-020, :on 870901,Loop II Shutdown Occurred When Plant Protective Sys Trip Circuits on Helium a Circulator Reset While Returning Circulator to Svc.Caused by Personnel Error. Event Will Be Reviewed W/All Reactor Operators + (ML20235S658)
- ML20235S659 + (ML20235S659)
- 05000259/LER-1984-008, :on 840129,trouble Alarms Annunciated in Reactor Protection Sys Analog Trip Units Due to Downscale Failure of Differential Transmitters.Caused by Instrument Sensing Line Snubbers.Snubbers Removed + (ML20235S662)
- ML20235S663 + (ML20235S663)
- ML20235S664 + (ML20235S664)
- ML20235S665 + (ML20235S665)
- ML20235S666 + (ML20235S666)
- ML20235S672 + (ML20235S672)
- 05000320/LER-1986-001-01, :on 851220,Tech Spec 3.8.1.1 Found Exceeded Due to Emergency Diesel Generator DF-X-1B Out of Svc for More than 7 Days.Caused by Remote Speed Control Problem Due to Leaking Governor & Loose Fittings on Solenoid + (ML20235S673)
- ML20235S675 + (ML20235S675)
- ML20235S676 + (ML20235S676)
- ML20235S677 + (ML20235S677)
- ML20235S680 + (ML20235S680)
- ML20235S681 + (ML20235S681)
- ML20235S685 + (ML20235S685)
- ML20235S686 + (ML20235S686)
- ML20235S688 + (ML20235S688)
- ML20235S690 + (ML20235S690)
- ML20235S692 + (ML20235S692)
- ML20235S693 + (ML20235S693)
- ML20235S696 + (ML20235S696)
- ML20235S697 + (ML20235S697)
- ML20235S701 + (ML20235S701)
- ML20235S702 + (ML20235S702)
- ML20235S704 + (ML20235S704)
- ML20235S708 + (ML20235S708)
- ML20235S709 + (ML20235S709)
- ML20235S711 + (ML20235S711)
- ML20235S713 + (ML20235S713)
- ML20235S714 + (ML20235S714)
- ML20235S715 + (ML20235S715)
- ML20235S716 + (ML20235S716)
- ML20235S717 + (ML20235S717)
- ML20235S718 + (ML20235S718)
- TXX-6777, Reponds to NRC Re Violations Noted in Insp Repts 50-445/87-11 & 50-446/87-09.Corrective Actions:Ncrs CE-87-9610 & CE-87-10026 Issued on 870811 & 21,respectively, Documenting Nonconforming Conditions + (ML20235S724)
- BECO-87-157, Annual Main Breakwater Monitoring Rept for 1987.Supporting Photographs & Oversize Drawing Encl + (ML20235S731)
- W3P87-2060, Forwards Changes to QA Program (FSAR Section 17.2) Re Significant Transition at Facility from Const to Operations Phase Which Included Major Reorganization of Nuclear Operations Dept.Fee Paid + (ML20235S735)
- ML20235S739 + (ML20235S739)
- ML20235S747 + (ML20235S747)
- PNO-I-87-065, on 870715,patient Received Palliative Treatment Dose Approx 50% Less than One Prescribed.Caused by Medical Physicist Error in Failing to Load Two Cs-137 Sources. Licensee Reviewing Options for Corrective Actions + (ML20235S753)
- ML20235S755 + (ML20235S755)
- ML20235S757 + (ML20235S757)
- 05000482/LER-1987-035, :on 870903,control Room Ventilation Isolation Signals Occurred.Caused by Malfunctions of Chlorine Monitors.Signal Reset & Monitor Placed in Bypass for Troubleshooting + (ML20235S758)
- ML20235S767 + (ML20235S767)