Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SVP-97-242, Forwards Updated FSAR to Quad Cities Nuclear Power Station,Units 1 & 2 & Detailed Change Log Which Identifies & Explains All Changes + (ML20217K733)
- 05000336/LER-1999-012, :on 990917,unrecoverable CEA Misalignment Entry Into TS 3.0.3 Was Noted.Caused by Grounded Coil Wire for Lower Gripper Assembly.Leads Leading to Lower Gripper Coil Were Insulated + (ML20217K734)
- ML20217K736 + (ML20217K736)
- ML20217K738 + (ML20217K738)
- ML20217K741 + (ML20217K741)
- ML20217K742 + (ML20217K742)
- ML20217K743 + (ML20217K743)
- ML20217K744 + (ML20217K744)
- ML20217K746 + (ML20217K746)
- ML20217K747 + (ML20217K747)
- ML20217K748 + (ML20217K748)
- ML20217K749 + (ML20217K749)
- ML20217K751 + (ML20217K751)
- ML20217K752 + (ML20217K752)
- ML20217K753 + (ML20217K753)
- ML20217K754 + (ML20217K754)
- ML20217K756 + (ML20217K756)
- ML20217K757 + (ML20217K757)
- ML20217K758 + (ML20217K758)
- 05000245/LER-1997-036, Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed + (ML20217K760)
- ML20217K762 + (ML20217K762)
- ML20217K763 + (ML20217K763)
- ML20217K764 + (ML20217K764)
- ML20217K765 + (ML20217K765)
- 05000245/LER-1997-036-01, :on 970929,fire Pump Room Flooded Through Floor Drain During Hurricane.Caused by Weakness in Design Change Process.Nneco Will Inspect Fire Pump House to Identify Addl Leakage Paths Into Structure + (ML20217K768)
- ML20217K770 + (ML20217K770)
- ML20217K771 + (ML20217K771)
- ML20217K772 + (ML20217K772)
- ML20217K773 + (ML20217K773)
- ML20217K774 + (ML20217K774)
- 05000443/LER-1997-014, :on 970923,non-conservative RHR Valve Low Pressure Open Permissive Bistable Setting Occurred.Caused by Acceptance of TS Surveillance Requirement for RHR Lpi.Tech Specs Will Be Revised + (ML20217K776)
- ML20217K777 + (ML20217K777)
- ML20217K778 + (ML20217K778)
- ML20217K780 + (ML20217K780)
- ML20217K781 + (ML20217K781)
- ML20217K782 + (ML20217K782)
- ML20217K784 + (ML20217K784)
- 05000266/LER-1997-038, :on 970926,determined That Inoperability of Standby Emergency Power Placed Unit 2 in 7-day Lco.Caused by Failure That Occurred When EDG G-03 Was Shutdown.Repaired Governor & Returned EDG G-03 to Service + (ML20217K787)
- ML20217K788 + (ML20217K788)
- ML20217K789 + (ML20217K789)
- ML20217K790 + (ML20217K790)
- ML20217K792 + (ML20217K792)
- ML20217K793 + (ML20217K793)
- ML20217K794 + (ML20217K794)
- ML20217K795 + (ML20217K795)
- ML20217K797 + (ML20217K797)
- ML20217K798 + (ML20217K798)
- ML20217K799 + (ML20217K799)
- ML20217K801 + (ML20217K801)
- ML20217K803 + (ML20217K803)
- ML20217K804 + (ML20217K804)