Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216C513 + (ML20216C513)
- ML20216C514 + (ML20216C514)
- IR 05000254/1997028 + (ML20216C516)
- L-98-033, Documents Commitment to Convert Bvps,Units 1 & 2 TS to Improved Std TS of NUREG-1431,as Discussed in 980212 Telcon. Conversion Process Expected to Begin in Third Quarter of 1999 + (ML20216C518)
- 05000255/LER-1998-006, :on 980305,personnel Determined That Operating Procedures Lacked Specific Guidance.Caused by Inadequate Procedures.Alarm Response Procedure 7 Was Revised + (ML20216C519)
- ML20216C521 + (ML20216C521)
- ML20216C522 + (ML20216C522)
- IR 05000412/1987035 + (ML20216C528)
- ML20216C529 + (ML20216C529)
- ML20216C530 + (ML20216C530)
- ML20216C531 + (ML20216C531)
- NSD-NRC-97-5295, Forwards Westinghouse Response to RAI 440.647 Re beyond- design-basis SG Tube Rupture Scenarios.Rai Provided by Ltr Resulted from NRC Review of Adverse Sys Interactions rept,WCAP-14477,Rev 1 + (ML20216C532)
- ML20216C533 + (ML20216C533)
- ML20216C534 + (ML20216C534)
- IR 05000263/1998004 + (ML20216C535)
- ML20216C537 + (ML20216C537)
- ML20216C538 + (ML20216C538)
- ML20216C541 + (ML20216C541)
- L-98-041, Interim Part 21 Rept Re Notification to Dlc Thorugh Stone & Webster Corp.Senior Flexonics Expansion Joints Installed in Unit 2 Service Water Sys,Were Evaluated for Effects of Increased Stiffness Due to Expansion Joint Tie Rods + (ML20216C542)
- ML20216C543 + (ML20216C543)
- CY-98-014, Responds to Confirmatory Action Ltr CAL-1-97-07,dtd 970304, Re Radiation Protection Improvement plan-Phase Ii.Phase II of Plan Now Complete.Program Is Now Capable of Supporting RCS Decontamination & Subsequent Decommissioning Activities + (ML20216C545)
- ML20216C546 + (ML20216C546)
- NPL-98-0239, Submits Proposal of Listed Alternatives to Liquid Penetrant Testing Requirements of N-518.4 of 1965 ASME Boiler & Pressure Vessel Code for Weld Repairs Described.Analysis Results & Summary of Tests Performed Encl + (ML20216C548)
- ML20216C549 + (ML20216C549)
- ML20216C551 + (ML20216C551)
- ML20216C553 + (ML20216C553)
- ML20216C555 + (ML20216C555)
- ML20216C558 + (ML20216C558)
- ML20216C560 + (ML20216C560)
- ML20216C561 + (ML20216C561)
- ML20216C562 + (ML20216C562)
- ML20216C565 + (ML20216C565)
- ML20216C566 + (ML20216C566)
- ML20216C568 + (ML20216C568)
- ML20216C569 + (ML20216C569)
- ML20216C570 + (ML20216C570)
- ML20216C571 + (ML20216C571)
- ML20216C573 + (ML20216C573)
- ML20216C575 + (ML20216C575)
- ML20216C578 + (ML20216C578)
- ML20216C580 + (ML20216C580)
- ML20216C582 + (ML20216C582)
- ML20216C583 + (ML20216C583)
- ML20216C584 + (ML20216C584)
- ML20216C585 + (ML20216C585)
- ML20216C586 + (ML20216C586)
- ML20216C588 + (ML20216C588)
- ML20216C589 + (ML20216C589)
- IR 05000275/1997011 + (ML20216C590)
- IA-98-111, FOIA Handbook Regional Ofc Instruction (ROI) 0350, Rev 5. W/Newspaper Articles & 980227 + (ML20216C591)
- ML20216C591 + (ML20216C591)