Responds to 980109 Request Re Survey on Dam safety-related Research.Dam Research Needs Are Insignificant,As Reflected in Completed Questionnaire
ML20216C578
Person / Time
Issue date: 02/27/1998
From: Joseph Holonich
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Tilda Liu
ARMY, DEPT. OF, CORPS OF ENGINEERS
References
CON-FIN-L-2051, REF-WM-5 NUDOCS 9803160083
Download: ML20216C578 (3)


Text

-

February 27, 1998 Department of the Army U.S. Army Corps of Engineers Directorate of Research and Development ATTN: Mr. Tony C. Liu, PhD, PE Washington, DC 20014

SUBJECT:

SURVEY ON DAM SAFETY-RELATED RESEARCH

Dear Mr. Liu:

In response to your request dated January 9,1998, we hereby respond to the Current Dam-Safety Related Research questionnaire. The questionnaire was distributed to members of the Interagency Committee on Dam Safety (ICODS).

As you may be aware, the U.S. Nuclear Regulatory Commission is responsible for only 19 dams. The dams under NRC's jurisdiction include Category I structures which impound water needed to assure the safe operation of nuclear power plants, and mill tailings embankments related to uranium milling activities. All 19 dams are considered to be in the " Low-Hazard" category.

Given the small number of dams in NRC's program, and the low-hazard nature of the structures, our dam safety research needs are insignificant, as reflected in the completed questionnaire. If you have any questions regarding the enclosure, please call Daniel Rom of my staff at (301) 415-6704.

Sincerely,

[0riginal signed by]

Joseph J. Holonich, Chief 1

Uranium Recovery Branch I

Division of Waste Manag m

6 Office of Nuclear Materia Safet9 f.dJp pmqvb LDg m.bgP CDb and Safeguards pv bg7gD

Enclosure:

As stated TICKET NO: DWM-980025 Ly DISTRIBUTION:

FILE CENTER PUBLIC NMSS r/f URB r/f CNWRA ACNW CCain/RIV Pury9 w/o Encl.:

MFederline CAbrams MLayton DOCUMENT NAME: S:\\DWM\\ URB \\DSR\\ CORPS.O&A OFC URB _

MB DRom/bhb NAZE onich v

DATE' 2/47/98 2/Q98 OFFICIAL RECORD COPY

" 'Yagn =

ll'll'lilili ll l l

J WM-5 PDR

i c,W4

[

t UNITED STATES j.

l-j NUCLEAR REEULATORY COMMISSION wAswin:Tcw, o.c. aossa. coot 1

('

g

)

l February 27, 1998 Department of the Army U.S. Army Corps of Engineers l

Directorate of Research and Development ATTN: Mr. Tony C. Liu, PhD, PE Washington, DC 20014 l

SUBJECT:

SURVEY ON DAM SAFETY-RELATED RESEARCH Dear Mr. Liu in response to your request dated January 9,1998, we hereby respond to the Current Dam-Safety Related Research questionnaire. The questionnaire was distritmted to members of the Interagency Committee on Dam Safety (ICODS).

As you may be aware, the U.S. Nuclear Regulatory Commission is responsible for only 19 dams. The dams under NRC's jurisdiction include Category I structures which impound water needed to assure the safe operation of nuclear power plants, and mill tailings embankments related to uranium milling activities. All 19 dams are considered to be in the " Low-Hazard" category.

Given the small number of dams in NRC's program, and the low-hazard nature of the structures, our dam safety research needs are insignificant, as reflected in the completed j

questionnaire. If you have any questions regarding the enclosure, please call Daniel Rom of j

my staff at (301) 415-6704.

Sincerely, m

N f

er Joseph J. Holonich, Chief Ursa um Recovery Branch Division of Waste Management Office of Nuclear Material Safety and Safeguards

Enclosure:

As stated

e..*

CURRENT DAM-SAFETY RELATED RESEARCII s

RESEARCH PROJECT TITLE PRINCIPAL INVESTIGATOR / AGENCY U.S. Nuclear Regulatory Comission PROJECT DESCRIPTION

' Problem Statement:

N/A Objective:

N/A Description of Work: N/A Project Start Date:

N/A Expected Completion Date:

N/A ACCOMPLISHMENT TO DATE N/A FUTURE PLANS N/A i

i